Loading...
HomeMy WebLinkAbout1011 Arbor Ave - Special Inspections/Engineering - 10/27/19990ct,27. 1 99 51rkh 30?7449 3 MA R TI!y DESIGN L\ : LD-, L\. IN design inc. ip0dober27,1999 Ranch Builders Inc. IV]I Arbor Ave. Fort Collins, Colorado 80526 Aft: Mr. Merle Bush ,Subject: Four Seasons Condominium Fort Collins, Colorado Project Number 972-S36.2 Dear,Mr. Dimig, N,1.7090 P. 1/1 The framing plans issued by this ofce for you project referenced above indicated that all wall studs be Hem Fir #2 or better_ Your framing contractor wishes to use Douglas Fir - Larch stud grade finger jointed studs. This fs a structurally acceptable situation, Finger Jointed lumber maynot be used for plate material. Also, our,plans call for Simpson HPAHD22 Holds+ m at shear wall locations on the unit buildings and Simpwn PAHD42 Hokiowns at shear wall locations on the garages. These holdings are poured into the foundation A Simpson HTTM6 Holdown is an acceptable substitution for both, should the builder choose a_ foundation bolt style holdow-n Please contact this office 1f you require further assistance. Chris C. !'weedy ,Project Manager M ..Martin T.E. President 130 So Clark;an St. • ,Dtmver, CO 80210 a (303) 744-7839 • FRX (303,) 744-9603