HomeMy WebLinkAbout725 Duke Sq - Inspection Results/Addition or Alteration - 06/17/1974J�
INSPECTION RECORD
(For Departure se Only)
Address
Plumbing Permit.
Heating Permit _
FI prrfri cnI Permit
vI
G.P.
Inspection
Approval
Comments
Date Inspector
Setback & Footing
APR 18 1974
DEVEA
Foundation
Frame & Roofing
JUN 17 1174
ROBLIN
Garage Fireproofing
_
rn
c
Fireplace
Wallboard
m
--
Final
JUN 1.7 1-974
ROBLIN
Rough
U14.1 7
18L;1:
Temp.
=
Final
Sewer
r
1
_Water
Rough In
'JUN 1 17 wA
BLIN
Water Test
a.
Gas
Final
/% 7
a
Underground
' ►:
Rough
MAY 1 7 1974 _
r.
a�
Energize
Final
Correction Order Left
Stop Order Issued
Stop Order Released
Certificate of Occupancy
.Z
_
16Anj ar%7it
No.
APR t 6 1974
GIVE BRIEF REPORT OF SPECIAL
OR UNUSUAL CONDITIONS
7 1974
S'
171974
xl:.c ,z.2 ROBLIN
MAY 171974— -
;Y�� - ROBLIN