Loading...
HomeMy WebLinkAbout2815 Amber Waves Ln - Special Inspections/Engineering - 06/20/2003Excavation/Footing Inspection CLIENT: Writer Homes Dr�ve S 6061 S. Greenwood Village, ee 8em Attn: M(un Kelly Recommended Foundation System _ CTL/THOMPSONN JOB NO.. � " 1 t ii. � � I �J DATED / l a clL. C Cj ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF MINIMUM WIDTH INCHES AFOOTINGS WITH MINIMUM DEAD -LOAD )/XJ(r,r MAXIMUM SOIL PRESSURE OF .3: 00c, PSF. MINIMUM DEAD -LOAD PRESSURE OF - ➢. 000 PSF. PROVIDE A �`I INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH fir) INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR MAXIMUM SOIL PRESSURE OF MINIMUM DEAD -LOAD PRESSURE OF PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation "IT ij; 5 J& .03 PLAN NO. ~ WALL FOOTING WIDTH 1 ^l INCHES COLUMN PAD !"Z lufaa INCHFS REINFORCEMENT AS PER PLAN: JX"YES ❑ NO ❑ NONE REQUIRED T STTE ❑ INSTALLED Soil Conditions At Footing Level TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT __FEET IN BORING NO, L.5 6111 Remarks: w CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: i,t�Z—�iN11��S- I��ICJrlit��J CpQy� LOT 3 _BLOCK FILING NO. — JOB NO. Foundation Layout 7-1 - - IV I I——r I } T_ t _ _ + t L t f iI I -— r, r T i r s` _ t +--L, r$ - Instructions To Contractor ,X,APPROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE In