HomeMy WebLinkAbout1109 Saint Croix Pl - Special Inspections/Engineering - 11/19/2002Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521-0503
(970) 484-0359 Fax: (970) 484-0454
November 19, 2002
James Company
1133 Aruba Drive
Fort Collins, Colorado 80525
Attn: Mr. Elton Townsend
Construction Superintendent @ Stanton Creek
Re: Drilled Pier/Caisson Observation
Stanton Creek — Phase 4
1109 Saint Croix Place — Lot 53
Fort Collins, Colorado
Terracon Project No. 20025134
Dear Mr. Townsend:
Terracon observed approximately 25 percent of the caissons at the referenced site as
requested on November 18, 2002. A truck pump was used to pump the concrete from
the bottom of the caisson. For each caisson observed we recorded the minimum depth
of penetration into firm bedrock, minimum length requirements, caisson diameter, plumb
tolerance, reinforcing steel and limited concrete placement.
The caissons that were observed appeared to have been constructed in general
accordance with the plans for the project.
Sincerely,
TERRACON
Gmfin Ripka
Senior Field Technician
Copies to:
Addressee (2)
uavia H. Kicner, N.L.
Geotechnical Enginee
vp�;y�0 A. /�j�; .• Tom,
o.
27712 t
er
Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri
Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming
Consulting Engineers & Scientists Since 1965
www.terracon.com