Loading...
HomeMy WebLinkAbout2110 S Overland Trl - Special Inspections/Engineering - 02/13/2003February 13, 2003 Project No: 1161-35-02 Peil Custom Construction Company 1931 Ridgewood Road M�j Ft. Collins, Colorado 80526 Z0067,7 / 0 Attn: Dick Peil Re: Detached Garage 2110 South Overland Trail; Fort. Collins, Colorado Dear Mr. Peil, Shear Engineering Corporation conducted detached garage foundation excavation observations at the above referenced address on Tuesday, January 28, 2003. The soils noted at the bottom of the garage excavation consisted primarily of sandy clay. The soil exhibits moderate bearing capacities with low to moderate swell potential, based on the clay content observed. This lot is suitable for a spread footing foundation system. The foundation plan, which was prepared by Shear Engineering Corporation and dated December, 2002, was used. Footings were designed for an assumed maximum allowable bearing capacity of 1,500 pounds per square foot (dead load plus full live load) and an assumed minimum dead load of 500 pounds per square foot. Shear Engineering Corporation was present on Tuesday, February 4, 2003 for footing construction observations. Shear Engineering Corporation was present on Wednesday, February 12, 2003 for wall steel placement observations. All observations were made to confirm that footing construction and wall steel placement was completed in substantial compliance with the direction, details and specifications noted on the foundation plan. All foundation footing construction and wall steel placement was completed in substantial compliance with the direction, details and specifications noted on the foundation plan. If you have any questions, please call (970) 226-5334. Sincerely, Richard D. Wagstaff Shear Engineering Corporation BWS / rdw Shear Engineering Corporation cc: City of Fort Collins Building Department 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com