Loading...
HomeMy WebLinkAbout1403 Nunn Creek Ct - Inspection Results - 01/12/2004Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 INSPECTION OF RADON_ MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY ji&aq AW11 C r PHONE a&IY_11 `� INSPECTOR rl SOU1 CQRMC # D ADDRESS OF INSPECTION .A S eQ 71P OSa BUILDER/CONTR PHONE &ell-�s'7S' ADDRESS 7 CITY .Sor STATE SIP Codes: Pass = ✓ Fail = O Not applicable =NA INSPECTION #1 INSPECTIONS #2 and #3 SYSTEM APPROVED: v4Es COMPONENTS NO TYPE OF FOUNDATION crawl space Sealing of openings, penetrations, joints DATE basement _ _perforated floor vent pipe /slab on grade _ _4" PVC radon vent pipe Comments diffusion retarder membrane TYPE OF SYSTEM BEING INSTALLED Passive sub -membrane system membrane sealed to wall & fixtures PVC pipe sealed at all penetrations & connections Active sub -membrane system LGPassive system - sub slab Active system - sub slab combined radon system Firewall sleeves installed System labeled inside and outside System accessible for repair or installation of fan electrical connections for fan COMPONENTS - sub slab/ basement termination of system meets ✓4 inches aggregate or perforated standard corrosion resistant screen at end of pipe or collection mat discharge pipe (% to'/z openings) diffusion retarder (not required fan properly installed outside living where sealing has occurred) space tee fitting Manometer or other US EPA perforated vent pipes (min. 10 ft.) approved monitoring device installed Make-up air vents CERTIFICATION: I, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTO DATE White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources