HomeMy WebLinkAbout1403 Nunn Creek Ct - Inspection Results - 01/12/2004Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
INSPECTION OF RADON_ MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY ji&aq AW11 C r PHONE a&IY_11 `�
INSPECTOR rl SOU1 CQRMC # D
ADDRESS OF INSPECTION .A S eQ 71P OSa
BUILDER/CONTR PHONE &ell-�s'7S'
ADDRESS 7
CITY .Sor STATE SIP
Codes: Pass = ✓
Fail = O
Not applicable =NA
INSPECTION #1
INSPECTIONS #2 and #3
SYSTEM APPROVED: v4Es
COMPONENTS
NO
TYPE OF FOUNDATION
crawl space
Sealing of openings, penetrations,
joints
DATE
basement
_ _perforated floor vent pipe
/slab on grade
_ _4" PVC radon vent pipe
Comments
diffusion retarder membrane
TYPE OF SYSTEM BEING INSTALLED
Passive sub -membrane system
membrane sealed to wall & fixtures
PVC pipe sealed at all penetrations
& connections
Active sub -membrane system
LGPassive system - sub slab
Active system - sub slab
combined radon system
Firewall sleeves installed
System labeled inside and outside
System accessible for repair or
installation of fan
electrical connections for fan
COMPONENTS - sub slab/ basement
termination of system meets
✓4 inches aggregate or perforated
standard
corrosion resistant screen at end of
pipe or collection mat
discharge pipe (% to'/z openings)
diffusion retarder (not required
fan properly installed outside living
where sealing has occurred)
space
tee fitting
Manometer or other US EPA
perforated vent pipes (min. 10 ft.)
approved monitoring device installed
Make-up air vents
CERTIFICATION: I, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation system.
SIGNATURE OF INSPECTO DATE
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources