Loading...
HomeMy WebLinkAbout6102 Claire Ct - Special Inspections/Engineering - 09/05/200312-29-203 11:17AM FROM CVSTOM ENVIRONMENTS 970 223 0633 Foundation Wall Quality .Assurance Observation: Per the clients request, a representative of SECURE has visually observed the foundation forms under construction at the site referenced below. The following summarizes our observations and opinions at the time of our visit. SECURE FOUNDATION9. & STRUCTURES, INC. Client: (Ii-fl �oM V-n J , or Melt �s Site Address: 61 �, C �Gi l (''e "� Foe CoII. -ki (ram Job#: 5 03- 14O Date: 9 � 5 - o-5 Lot: I Block: Contact: C', h C"O_ Subdivision: 1071 4!� too Foundations Plan Information Plan By: r ' • Date: 0745 ' Dl— Job#: 51F03 - I S O Foundation type? D spread footing ❑ narrow footing ❑ footing with voids ❑ pad and grade beam ❑ drilled piers other qglC ►L PICK Maximum Wall Height Observed: QkgA-'�'�• ✓ Minimum Wall Height Observed: if wall voids arc required are they installed as recommended? Oyes, ❑no .', Reinforcement11observed: yFw�G, r;n s 4",n - c, , -r yp Concrete on -site? ❑ yes Ano (+/- % poured ' D ) Weather: C\.e,c Is the foundation reinforcement in general conformance to the plan? A yes, Ono Notes: _t N Al�oyT bn log tv.w 4 y �1 i 3 Rows AR 31 Summary of opinions: )RUt is our opinion that the foundation reinforcement is in general conformance with the requirements of the foundation plan referenced above. O rejected (2' observation required) corrective action: