Foundation Wall Quality .Assurance Observation:
Per the clients request, a representative of SECURE has visually observed the
foundation forms under construction at the site referenced below. The following
summarizes our observations and opinions at the time of our visit.
SECURE
FOUNDATION9. & STRUCTURES, INC.
Client: (Ii-fl �oM V-n J , or Melt �s Site Address: 61 �, C �Gi l (''e "�
Foe CoII. -ki (ram
Job#: 5 03- 14O Date: 9 � 5 - o-5 Lot: I Block:
Contact: C', h C"O_ Subdivision: 1071 4!� too
Foundations Plan Information
Plan By:
r '
• Date: 0745 ' Dl— Job#: 51F03 - I S O
Foundation type?
D spread footing ❑ narrow footing
❑ footing with voids ❑ pad and grade beam
❑ drilled piers other qglC ►L PICK
Maximum Wall Height Observed: QkgA-'�'�• ✓
Minimum Wall Height Observed:
if wall voids arc required are they installed as recommended?
Oyes, ❑no
.',
Reinforcement11observed: yFw�G,
r;n
s 4",n - c, , -r yp
Concrete on -site? ❑ yes Ano (+/- % poured ' D )
Weather: C\.e,c
Is the foundation reinforcement in general conformance to the
plan? A yes, Ono
Notes:
_t
N Al�oyT
bn
log
tv.w
4 y
�1
i
3 Rows AR
31
Summary of opinions:
)RUt is our opinion that the foundation reinforcement is in
general conformance with the requirements of the
foundation plan referenced above.
O rejected (2' observation required)
corrective action: