Drain & Dampproofing Quality Assurance Observation:
Per the clients request, a representative of SECURE has visually observed the
perimetcr drain and dampproofing at the site refercnoed below. 'The following
summarizes uur observations and opinions at the time of our visit.
SECURE
FOUNDATIONS & STRUCTURES, INC.
Client: �= � `� �w �-� v" � �� ��'► -�'s Site Address: /D 16L I ..
Job#: 0 Date: q - Iq -03 Lot: I Block: #41 A
Contact: C µ A R L iE rA,c_n U_,c f Subdivision: I ,� r' N c�ror=, I- L. _
Foundation Plan Information:
Plan By:
Date: 0? + - o 5 Job#
Recommended Drain type?
:rr o3 • H0
❑ Exterior perimeter i] Interior ❑ Exterior and interior
(l other ;r_ 1 r : �� G � x n lcr; of-
.
Pev dht tear W„/. 22LD 6L& Pyc�.Ars,
Where does the perimeter drain discharge?
ADaylighted ❑ Sump pit ❑ Subdivision drain
Was the foundation drain system observed in general
conformance to the recommended design?
K Yes , ❑ No
Comments
Dampproofina observed around:
' El Basement ❑ Crawlspaee
El Other
❑ All backtill areas
Was the dampproofing in general eonfonnancc to the
recommended design?
,K Yes, ❑ No
Comments
I L�n �iR/1Vidl. INT.4 �r.Y"
&4r-
Summary of opinions:
,XIt is our opinion that the foundation drain and
dampproofing are in general conformance with the
requirements of the foundation plan referenced above.
❑ rejected (2"d observation required)
corrective action: