Loading...
HomeMy WebLinkAbout6102 Claire Ct - Special Inspections/Engineering - 10/24/2003 (2)12-29-203 11.17AM FROM CVSTOM ENVIRONMENTS 970 223 0633 P_ 3 Drain & Dampproofing Quality Assurance Observation: Per the clients request, a representative of SECURE has visually observed the perimetcr drain and dampproofing at the site refercnoed below. 'The following summarizes uur observations and opinions at the time of our visit. SECURE FOUNDATIONS & STRUCTURES, INC. Client: �= � `� �w �-� v" � �� ��'► -�'s Site Address: /D 16L I .. Job#: 0 Date: q - Iq -03 Lot: I Block: #41 A Contact: C µ A R L iE rA,c_n U_,c f Subdivision: I ,� r' N c�ror=, I- L. _ Foundation Plan Information: Plan By: Date: 0? + - o 5 Job# Recommended Drain type? :rr o3 • H0 ❑ Exterior perimeter i] Interior ❑ Exterior and interior (l other ;r_ 1 r : �� G � x n lcr; of- . Pev dht tear W„/. 22LD 6L& Pyc�.Ars, Where does the perimeter drain discharge? ADaylighted ❑ Sump pit ❑ Subdivision drain Was the foundation drain system observed in general conformance to the recommended design? K Yes , ❑ No Comments Dampproofina observed around: ' El Basement ❑ Crawlspaee El Other ❑ All backtill areas Was the dampproofing in general eonfonnancc to the recommended design? ,K Yes, ❑ No Comments I L�n �iR/1Vidl. INT.4 �r.Y" &4r- Summary of opinions: ,XIt is our opinion that the foundation drain and dampproofing are in general conformance with the requirements of the foundation plan referenced above. ❑ rejected (2"d observation required) corrective action: