HomeMy WebLinkAbout309 Peyton Dr - Special Inspections/Engineering - 10/14/2002October 14, 2002
Melody Homes
11031 Sheridan Blvd.
Westminster, Colorado 80020
Attn: Mr. Shawn Weiman
Re: Foundation Footing SizeMall Steel Observation
Ridgewood Hills 3rd Filing —Lot 201
309 Peyton Drive
Fort Collins, Colorado
Terracon Project No. 20005162
Mr. Weiman:
Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521-0503
(970) 484-0359 Fax: (970) 484-0454
A representative of Terracon observed the foundation footing sizes and wall steel for the
referenced project on October 8 and 9, 2002, as requested.
Observations made during the foundation construction indicate that the foundation
footing sizes and wall steel placements were in general accordance with the plans for
this project.
Sincerely,
TERRACON
Glenn Ripka V
Senior Field Technician
Copies to: Addressee (3)
David A. Richer; P.E._,_,,
Geotechnical Engineer/Department Manager
Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri
Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming
Consulting Engineers & Scientists Since 1965
www.terracon.com