Loading...
HomeMy WebLinkAbout315 Peyton Dr - Special Inspections/Engineering - 11/11/2002November 11, 2002 Melody Homes 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Shawn Weiman Re: Foundation Footing SizefWall Steel Observation Ridgewood Hills 3rd Filing 315 Peyton Drive - Lot 202 Fort Collins, Colorado Terracon Project No. 20005162 Mr. Weiman: Irerracon 301 N. Howes - P.O. Box 503 Fort Collins, Colorado 80521-0503 (970)484-0359 Fax:(970) 484-0454 A representative of Terracon observed the foundation footing sizes and wall steel for the referenced project on November 4 and 8, 2002, as requested. Observations made during the foundation construction indicate that the foundation footing sizes and wall steel placements were in general accordance with the plans for this project. Sincerely, TERRACON Glenn Ripka Senior Field Technician Copies to: Addressee (3) `= David A. Richer, P.E. Geotechnical Engineer/Department Manager Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineers & Scientists Since 1965 www.terracon.com