HomeMy WebLinkAbout1120 City Park Ave - CO/LOC - 08/12/2002 (2)i City of Fort Collins
Temporary Certificate of Occupancy
212 Fort Collins Permit #: B0200810
This is to certify that the building, structure, or land located a 1120 CITY PARK AVE UNIT #B
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective 8/8/2002
and conditional upon the following requirements being completed and approved upon final inspection.
ZONING Requirements to be Completed By:
q-/�-o;�-
8/5/2002 ok for tco w/conditions for co: 1. complete asphalt (lift coat) and concrete work 2. stripe parking area 3.
install he signs 4. complete trash enclosures 5. remove roll -off dumpsters 5. paint all exterior wall attached
meters to match wall color 6. install bike racks 7. complete soil amend. affiday. tco exp 30 days from
issuance.
POUDRE FIRE AUTHORITY Requirements to be Completed By: (?-11�41�_
7/26/2002 30 day TCO. Address needs to up by 7-30-02.
STORMWATER ENGINEERING Requirements to be Completed By: "[ - I ,,?-Qv2
8/6/2002 ESCROWED $4,500 FOR 3 PERMITS - OK FOR TCO PER GLEN S
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to
a m Ximum fine of $1000.0 per day for every day of violation.
40nactor/Owner/L ;ee 11 F Date
PeAl
Authorized By
S'-ta--0��
Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner
is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and
both the owner of the property and the contractor will continue to be liable to the City for all utility bills.
8/12/2002 11:38:33 AM