Loading...
HomeMy WebLinkAbout5403 Golden Harvest Way - Special Inspections/Engineering - 06/21/2002Excavation/Fooling Inspection CLIENT: Writer Homes CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS DD r� 5%s �'41 ; I!"1�11 Loveland, CO 80538 I BLOCK czyk FILING NO. JOB NO. f: n: r. im ur Recommended Foundation System CTL/THOMPSON JOB NO. DATED ❑ SPREAD FOOTING MAXIMUM SOIL PRESSURE OF MINIMUM WIDTH 'FOOTINGS WITH MINIMUM DEAD -LOAD INCHES MAXIMUM SOIL PRESSURE OF 3J ty" PSF. MINIMUM DEAD -LOAD PRESSURE OF 1, O UJ PSF. PROVIDE A 'I INCH VOID BENEATH GRADE BEAMS. MINIMUM WIDTH - 1 & INCHES ❑ GRADE BEAMS AND PADS DESIGNED FOR MAXIMUM SOIL PRESSURE OF MINIMUM DEAD -LOAD PRESSURE OF PROVIDE A INCH VOID BENEATH GRADE BEAMS. Foundation Plan BY no���(j(' PLAN NO. WALL FOOTING WIDTH INCHES COLUMN PAD ' 7 Q, we"ET, RE NFORCEMENT AS PER PLAN: wet YES ❑ NO ❑ NONE REQUIRED AT srrE ❑ INSTALLED S011 Conditions At Footing Level TORVANE OR VANE SHEAR DENVER PENETROMETER TEST Ground Water Conditions ❑ NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO FEET ENCOUNTERED AT IT FEET IN BORING NO. � L Remarks: Foundation Layout IV s I I ' -, I ,ff } _ T_ . ! I 4 i_ r 1_j ri 4-4 r >! Instructions To Contractor PROVED ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE