Loading...
HomeMy WebLinkAbout2813 Michener Dr - Correspondence - 04/29/1991FOUNDATION I ENGINEERING April 29, 1991 Commission No. Consulting Engineers, Ltd. Jensen Enterprises P.O. Box 1007 Fort Collins, CO 80522 Re: Lot 14, Quail Hollow 4th 2813 Michener Gentlemen: We have inspected the framing supporting the double cantilever beneath the master bedroom at the residence under construction at the above referenced address. This inspection was performed on April 26, 1991. Existing framing consist of a two (2) foot cantilever floor joist which runs back in the structure four (4) feet, for a total of six (6) feet. The cantilever is currently framed into a double 2x10 which spans sixteen (16) feet. The cantilever supports twenty-four (24) foot trusses. It is our opinion that the addition of one additional 2x10 Hem Fir #1 for a total of three (3), supporting the these floor joist, will be adequate to support code live load and dead load due to uplift on the triple floor joist. ns, please call. 4 C 0L $ XEWM 4t?+ATE FM1T?'id`.iC;�� �' CONSULTIWeENG1WR- 2R5, LW= l^ 23 11 6 320 North Cleveland Avenue • Loveland, Colorado 80537 • (303) 663-0138