Loading...
HomeMy WebLinkAbout514 Kim Dr - Special Inspections/Engineering - 07/24/200210/21/02 MON 11:44 FAX 970 484 0454 TERRACON 121002 July 24, 2002 Melody Homes 11031 Sheridan Blvd. Westminster, Colorado 80020 Attn: Mr. Shawn Weiman Ireirracon 301 N. Howes • P.O. Box S03 Fort Collins, Colorado 8001-0503 (970) 484.0359 Fax: (970) 484-0454 Re: Foundation Footing Size and Foundation Wall Steel Observation Ridgewood Hills 3'd Filing 514 Kim Drive — Lot 82 Fort Collins, Colorado Terracon Project No. 20005162 Mr. Weiman: A representative of Terracon observed the foundation footing sizes and wall steel for the referenced project on July 18 and 22, 2002, as requested. Observations made during the foundation footing sizes and wall steel reinforcing accordance with the plans for this project. Sincerely, TERRACON c Gary L. Wilson, E.I.T. Geotechnical Engineer Copies to: Addressee (3) construction indicate that the foundation placements were constructed in general David A. Richer, P.E. Geotechnical Engineer/Department Manager Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Monlana \ Nebraska ■ Nevada in New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineer; & Sclanllets Since 1965 W W W.iorrocon.com