HomeMy WebLinkAbout514 Kim Dr - Special Inspections/Engineering - 07/24/200210/21/02 MON 11:44 FAX 970 484 0454
TERRACON 121002
July 24, 2002
Melody Homes
11031 Sheridan Blvd.
Westminster, Colorado 80020
Attn: Mr. Shawn Weiman
Ireirracon
301 N. Howes • P.O. Box S03
Fort Collins, Colorado 8001-0503
(970) 484.0359 Fax: (970) 484-0454
Re: Foundation Footing Size and Foundation Wall Steel Observation
Ridgewood Hills 3'd Filing
514 Kim Drive — Lot 82
Fort Collins, Colorado
Terracon Project No. 20005162
Mr. Weiman:
A representative of Terracon observed the foundation footing sizes and wall steel for the
referenced project on July 18 and 22, 2002, as requested.
Observations made during the foundation
footing sizes and wall steel reinforcing
accordance with the plans for this project.
Sincerely,
TERRACON
c
Gary L. Wilson, E.I.T.
Geotechnical Engineer
Copies to: Addressee (3)
construction indicate that the foundation
placements were constructed in general
David A. Richer, P.E.
Geotechnical Engineer/Department Manager
Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri
Monlana \ Nebraska ■ Nevada in New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming
Consulting Engineer; & Sclanllets Since 1965
W W W.iorrocon.com