HomeMy WebLinkAbout608 Prichett Ct - Special Inspections/Engineering - 06/11/2002June 11, 2002
Melody Homes
11031 Sheridan Blvd.
Westminster, Colorado 80020
Attn: Mr. Shawn Weiman
Re: Foundation Footing SizelWall Steel Observation
Ridgewood Hills 3' Filing —Lot 22
608 Prichett Court
Fort Collins, Colorado
Terracon Project No. 20005162
Mr. Weiman:
Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521-0503
(970) 484-0359 Fax:(970) 484-0454
A representative of Terracon observed the foundation footing size and wall steel
construction for the referenced project on May 31 and June 3, 2002, as requested.
Observations made during
footing sizes and wall steel
specifications for this project.
Sincerely,
TERRACON
1
Gary L. Wilson, E.I.T.
Geotechnical Engineer
Copies to: Addressee (6)
the foundation construction indicate that the foundation
placements are in general accordance with the plans and
J
r{ N
David A. Richer, PE, IMF r�
Geotechnical Eiment Manager
Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri
Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah I• Wisconsin ■ Wyoming
Consulting Engineers & Scientists Since 1965
www.terracon.com