HomeMy WebLinkAbout4603 Chokecherry Trl - Inspection Results/Radon - 12/17/2001Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY —PHONE Z
INSPECTOR �o �✓�'" CQRMC # /42-192 ^�J�
ADDRESS OF INSPECTI N y< 3 _',`� 71 P
BUILDER/CONTR z .✓� ��'s✓ PHONE 9/V - 54tZ -107/e
CITY—1Snt✓� rl&� STATE 5—�P • 71P 0a
RADON SYSTEM INSTALLER Ste`{ £ PHONE
ADDRESS
CITY
STATE 71 P
Codes: Pass = ✓ Fail = O Not applicable =NA
INSPECTION #1
TF FOUNDATION
_7crawl space
_basement
_slab on grade
TYP"F SYSTEM BEING INSTALLED
I/
_Passive sub -membrane system
_Active sub -membrane system
_Passive system - sub slab
_Active system - sub slab
_combined radon system
- su slab/ basement
_g gate or perforated
ection mat
_tarder (not required
COM/orated
ling has occurred)
_
_vent pipes (min. 10 ft.)
INSPECTIONS #2 and #3
COM ENTS
_Sealing of openings, penetrations,
/joints
----t f -perforated floor vent pipe
PVC radon vent pipe
diffusion retarder membrane
✓membrane sealed to wall & fixtures
✓PVC pipe sealed at all penetrations
& connections
Firewall sleeves installed
✓System labeled inside and outside
✓System accessible for repair or
installation of fan
✓ eell trical connections for fan
`" Lermination of system meets
�tandard
_corrosion resistant screen at end of
discharge pipe ('/, to openings)
N Afan properly installed outside living
space
i�QManometer or other US EPA
approved monitoring device installed
Make-up air vents
SYSTEM APPROVED: '-�Es
NO
DATE
CommentA
CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my knowledge and professional ability, I
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation pystem.
SIGNATURE OF INSPECTOR ! DATE
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources