Loading...
HomeMy WebLinkAbout124 W Magnolia St - Special Inspections/Engineering - 04/14/2000Terracon U.S. West First Floor Renovation Gerald H. Phipps, Inc. Terracon Project No. 20991159 Page 2 Masonry special inspection was also provided with non-compliance noted if observed at the time of the site visit. The observations were reported to the masonry contractor, Gerald H. Phipps, Inc., and the structural engineer with a formal typed report. It is recommended that the project structural engineer review the test and inspection reports for acceptance as meeting the project design criteria. Foundation Terracon provided an observation of the foundation(s) excavations as requested during construction. Per the structural engineer's criteria and observations performed, foundations have been placed in general accordance with the requirements of 1,500 psf maximum anticipated material identified. It has been our pleasure to work with you on this project and we look forward to providing our services during future construction. Should you have any questions, or need additional information, please contact us at your convenience. Respectfully submitted, TERRACON Mike L. Walker, CET Manager of Construction Services Copies to: (2) Addressee MLW/WJA/mjg G( JNX illiam J. Attwooll, P.E. Office Manger