HomeMy WebLinkAbout124 W Magnolia St - Special Inspections/Engineering - 04/14/2000Terracon
U.S. West First Floor Renovation
Gerald H. Phipps, Inc.
Terracon Project No. 20991159
Page 2
Masonry special inspection was also provided with non-compliance noted if observed at the
time of the site visit. The observations were reported to the masonry contractor, Gerald H.
Phipps, Inc., and the structural engineer with a formal typed report.
It is recommended that the project structural engineer review the test and inspection reports for
acceptance as meeting the project design criteria.
Foundation
Terracon provided an observation of the foundation(s) excavations as requested during
construction. Per the structural engineer's criteria and observations performed, foundations
have been placed in general accordance with the requirements of 1,500 psf maximum
anticipated material identified.
It has been our pleasure to work with you on this project and we look forward to providing our
services during future construction. Should you have any questions, or need additional
information, please contact us at your convenience.
Respectfully submitted,
TERRACON
Mike L. Walker, CET
Manager of Construction Services
Copies to: (2) Addressee
MLW/WJA/mjg