HomeMy WebLinkAbout1521 Corydalis Ct - Inspection Results - 04/02/2001Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY .-4--2
INSPECTOR J
ADDRESS OF I
CITY / a_y /_ & STATE `'O 71P 1%0S %$A
RADON SYSTEM INSTALLER A! PHONE
ADDRESS -5^�
CITY
STATE 71 P
r ^Al a- PCicc = ✓ Fail = O Not aDDlicable =NA
INSPECTION #1
TYPE OF FOUNDATION
crawl space
✓basement
slab on grade
TYPE OF SYSTEM BEING INSTALLED
_Passive sub -membrane system
Active sub -membrane system
✓5assive system - sub slab
_Active system - sub slab
_combined radon system
COMPONENTS - sub slab/ basement
"Ainches aggregate or perforated
pipe or collection mat
_diffusion retarder (not required
where sealing has occurred)
-Gte fitting
/perforated vent pipes (min. 10 ft.)
INSPECTIONS #2 and #3
COMPONENTS
_✓Sealing of openings, penetrations,
joints
✓^perforated floor vent pipe lt'1 S
✓ 'VC radon vent pipe -
_diffusion retarder membrane
membrane sealed to wall & fixtures
�VC pipe sealed at all penetrations
& connections
_Firewall sleeves installed
System labeled inside and outside
l/System accessible for repair or
installation of fan
'electrical connections for fan
germination of system meets
/ standard
✓ corrosion resistant screen at end of
discharge pipe (% to Yz openings)
_fan properly installed outside living
space
_Manometer or other US EPA
approved monitoring device installed
✓Make-up air vents
SYSTEM APPROVED:
u NO
DATE
Comments
CERTIFICATION: 1, the unaersl'gnea mspecror, cernry rnar ro rna uessr w illy nnuwlavyu a": r.v.ca�.v..v...•+••••„
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation system. n. /)
SIGNATURE OF INSPECTORDATE
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources