HomeMy WebLinkAbout844 Napa Valley Dr - Correspondence - 04/21/2000April 21, 2000
Project No: 1742-05-00
Ashcroft Homes
4836 South College Avenue
Ft. Collins, Colorado 80525
Attn: Mr. William Albrecht
Re: Lot 16, Miramont Valley P.U.D.; Ft. Collins, Colorado
844 Napa Valley Drive
Dear Mr. Albrecht,
Shear Engineering Corporation conducted foundation excavations observations at the above
referenced address on Friday, March 10, 2000. The soils noted at the bottom of the basement
excavation consisted primarily of weathered sandstone shale. The soils noted at the bottom of the
garage excavation also consisted primarily of weathered sandstone shale. The soils noted are
generally consistent with those noted by Earth Engineering Consultants in the geotechnical
investigation report for Miramont Valley P.U.D. titled, "Subsurface Exploration Report,
Proposed Miramont Future Additions, Fort Collins, Colorado"; E.E.C. Project No. 1932053;
report -dated January 141 1994.
Boring Logs B-11 and B-12 were the nearest borings taken to this site. Boring Log B-11
indicated lean clay with sand to a depth of four and one half feet (4.5') underlain by highly
weathered sandstone with claystone zones to a depth of nine feet (9') followed by weathered
shale with sandstone zones for the remainder of the boring of nineteen feet (19'). Boring Log B-
12 indicated sandy lean clay to a depth of four and one half feet (4.5') underlain by highly
weathered sandstone with claystone zones to a depth of nine feet (9') followed by weathered
shale with sandstone zones for the remainder of the boring of nineteen feet (19').
A drilled pier (caisson) foundation system was recommended in the geotechnical investigation
report. The foundation plan for the proposed residence, which was prepared by Shear
Engineering Corporation and dated March, 2000, was used.
Shear Engineering Corporation was present on Wednesday, March 29, 2000 for caisson
construction observations. Shear Engineering Corporation was present on Friday, April 14, 2000
for wall steel placement observations.
All observations were made to confirm that caisson construction and wall steel placement was
completed in substantial compliance with the direction, details and specifications noted on the
foundation plan. And in substantial compliance with the recommendations of the geotechnical
investigation report.
All caisson construction and wall steel placement was completed in substantial compliance with
the direction, details and specifications noted on the foundation plan and with the
recommendations of the geotechnical investigation report.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com
PAGE 2
April 21, 2000
Project No: 1742-05-00
Re: Lot 16, Miramont Valley P.U.D.; Ft. Collins, Colorado
844 Napa Valley Drive
Groundwater was not evident in the basement excavation. Waterproofing is not required. At a
minimum, all foundation walls shall be dampproofed according to the requirements of 1997
UBC, Appendix Chapter 18, Waterproofing and Dampproofing Foundations. A foundation drain
system will be required. A sump pit, located in the basement, is recommended as a secondary
drain outfall.
If you have any questions concerning our observations, please call at (970) 226-5334.
Sincerely,
tit
Bry E. Woodward
Shear Engineering Corporation
BWS / bew
1
cc: City of Ft. Collins Building Department
Shear Engineering corporation