August 14, 1998 qq
Commission No.: 1455-12-29-03
Odau Construction
P. O. Box 271372
Fort Collins, Colorado 80527
Gentlemen:
We have visually observed the drilling of several of the ten (10) inch diameter, straight shaft piers
supporting the msidenee under construction at Lut 10, Eagle Tree Subdivision (812 Biscay), a
subdivision of Fort Collins, Colorado. This inspection was perforated on August 12, 1998.
Exposed soils measured from original grade consist of fourteen (14) feet of slightly silty clay over a
clayey silistone bedrock which extends to the depths drilled.
All piers observed were plumb, properly cleaned, and of adequate length as specified on our
foundation plan, lob No. 1455-12-29-01. No water was encountered during drilling. Therefore, we
recommend concrete be placed immediately after drilling of the caissons. Casing was not required.
If you have any questions, please feel free to call.
cs tfidly,
Glnr�n,t.� Q .
James A. Chesty; P.E.
FOUNDATION & SOILS ENGINEERING, INC.
SM/pia
Post-V brand tax transmittal memo 7671
M vi pages e /
n"` �. GC"
from
to
Co.
Devi.
//phone
iein��,
Faze
Si 10 Granite Street, Suite t) •Loveland. Colorado 80538 •(970) 663-0138 -Fax (970) 663-t660
500 Kimbark Street, Suite 101 -Longmont. Colorado 80501 •(303) 702-0661-Fax (303) 774-8413
Dec-28-98 12:33P w3 ��j P-01
FOUNDATION
AND SOILS
Engineering,
Inc.
August 14, 1998
Commission No.: 1455-12-29-03
Odau Construction
P. O. Box 27I372
Dort Collins, Colorado 80527
Gentlemen:
We have visually observed the driiiing of several of the ten (10) inch diameter, straight shaft piers
supporting the residence under construction at ),or 10, Ugle Tree Subdivision (912 Biscay), a
subdivision of Fort Collins, Colorado. This inspection was performed on August 12, 1998.
Exposed soils measured from original grade consist of fourteen (14) feet of slightly silly clay over a
clayey siltstnne bedrock which extends to the depths drilled.
All piers observed were plumb, properly cleaned, and of adequate length as specified on our
foundation plan, Job No. 1455-12-29-01. No water was encountered during drilling- Therefore, we
recommend concrete be placed immediately after drilling of the caissons. Casing was not required.
If you have any questions, please feel free to call.
pp
esA. Cherry; P:E:
FOUNDATION & SOILS ENGINEERING, INC.
SM/pia
Poet -it" brand fax transmittal memo MMootpase,*
phe"o
Poa
�2—
51 l o Granire Street, Suite U ci.nveland, Colorado 80538 •(970) 663-0138 *Fax (970) 663-1660
500 Kimbark Street, Suite 101 -Longmont, Colorado Mot •(303) 702-0661-*F3x (303) 774-8413