Loading...
HomeMy WebLinkAbout7406 Greenstone Trl - Special Inspections/Engineering - 04/13/1995FOUNDATION II Consulting ENGINEERING Engineers, Ltd March 14, 1995 Commission No 2154-05-01 Valley Crest Homes 219 Towhee Drive Fort Collins, Colorado 80526 RE Lot 8, Greenstone P U D First Filing, Colorado Gentlemen Larimer County, We have reviewed the plans for the above referenced location It is our opinion that the header above the 16'-0' wide garage door should consist of two (2) 1-3/4 x 14 microlams and the header above the 9'-0 garage door shall be two (2) 1-3/4 x 9-1/2' microlams It is also our opinion that the cantilevered window area located in the third bedroom shall have a double 2x12 header spanning approximately 7'-0 at the roof If you have any questions, please feel free to call Respectfully, Scott A Skeen, Structural Engine Reviewed by A Kevin W Patter FOUNDATION ENGI SAS/alb e,uu PEi PREjo �- 23s1iI n, P E �'1 T�NG` `JV SULTING ENGINEERS, p� r LTD 100 East 3rd Street • Loveland, Colorado 80537 • (303) 663-0138