Loading...
HomeMy WebLinkAbout1301 Blue Spruce Dr - Correspondence/Health Department - 06/24/1992n, Rai �41 prs-3b -9a BOARD OF HEALTH Pamela Howard, Loveland President Kenneth W. Curtis, Jr., MD, MPH, Fort Collins Vice President Kent N. Campbell, JD, Fort Collins Sidney M. Waldrop, MS, Fort Collins Glenn W. Wellman, OD, MPH, Estes Park 1525 Blue Spruce Drive Fort Collins, Colorado 80524 General Health 498-6700 Environmental Health 498-6775 I� 0 June 24, 1992 Sandy Bowden . Food Distribution Center 1301 Blue Spruce Fort Collins, CO 80524 Dear Ms. Bowden: The plans and specifications submitted for the construction of the new walk-in cooler to be built in the Food Distribution Center, 1301 Blue Spruce, Fort Collins, Colorado have been reviewed by this Department. Based upon my June 22, 1992 meeting with Steve White, Project Manager, City of Fort Collins, and the information provided, the plans are approved. To reiterate some of the items discussed at that meeting: 1) Walls and ceilings will be dry walled and painted with a Tile Clad epoxy paint. The lower 4 foot of the walls will be covered with FRP panels. Floor/wall junctures will be coved with 3 inch rubber base coveing. 2) The floor will have a concrete sealer applied as a finish. As -discussed,-_this."Department does not recommend this type of floor finish in this type of application because of the extensive maintenance needed in keeping the floor clean and at the time of resealing the floor. 3) The evaporation coil units will be drained to an evaporation pan located outside of the walk-in. 4) The use of wooden shelves and interior finishes are not permitted. Metal shelving planned for the cooler is approved. 5) Ten foot candles of light must be provided through out the .cooler and all lights in the cooler must be shielded.,) 6) All plumbing, electrical and utility penetrations must be neatly sealed or caulked around so there are no spaces or gaps between the walls and ceilings and the utility lines. BOARD OF COUNTY COMMISSIONERS Courtlyn W. Hotchkiss M. J.'Moe" Mekelburg Daryle W. Klassen District I District 11 District III Sandy Bowden June 24, 1992 Page 2 As noted above, the plans are approved. Be advised, approval of the plans, including the above modifications, does not constitute acceptance of the completed structure. An inspection of the premises must be conducted by this Department prior to approval for use of the walk-in. Failure to follow the above listed requirements may prevent or delay approval for the walk-in. Please contact this office at least 48 hours prior to completing the work so a final acceptance inspection can be performed. If questions arise, please contact this Department at 498-6775. Sincerely, Jim Devore JD/my CC: Fort Collins Building Department Steve White, City of Fort Collins