Loading...
HomeMy WebLinkAbout600 Marigold Ln - Special Inspections/Engineering - 08/09/1995US-U9-u5 01:45 FM FROM FOUDAT1011 ENG. iii ?II.`%i. 1. 51. i�i j FOUNDATION �IC0nsniting ENGINEERING tngintxrc, I.W. August 9, 1995 Commission No.: 1132-17-01-01 Nelson Construction 3212 Alumbaugh Court Fort Collins, Colorado 80526 RE: 600 Marigold Lane, Fort Collins, Colorado Gentlemen: We have reviewed the plans for, construction of a second floor over the garage at the above referenced address. The construction will require removal of the existing roof system. The new floor joists will span back to frout with a two (2) foot caaCilever at both ends. the new trusses will span 27'-6" .including the new cantilevers. A beam is required to span over the garage approximately 19'-0". We recotmmend two (2) 14" microlnms (2600f, 2.06) or a W12xl4 steel beam. The garage header may also deed upgrading. 'Three (3) 14" microlams or a W12x16 is required. All other headers shall be double 2x12's. We recommend the size alld extent of the existing footinys and foundation be verified at the saute time as the soils Uo[lditi011S are checked. We recommend this be completed iuuttedi.ately prior to construction. If you have any questions, Respectfully, i Kevin W. Patterson, FOUNDATION ENGINEER111 ";,+ UNSy KWP/jlb feel free to call. ENGINEERS, LTD.