Loading...
HomeMy WebLinkAbout5532 Golden Willow Ct - Inspection Results/Engineering - 12/30/1999FEB 24 '00 12:19 FR PSI-DENVER CO 303 423 5625 TO 19702246134 P.07i07 ffo% Informai!ion Pr .ToBuild On Erighteerki9 a Conawftkq a 1esft August 4, 1999 Colorado North Company, LLC Go Colorado Builder Services, LLC 7600 East Orchard Road, Suite 270N Englewood, CO 80111 Attention: Mr. Ed Petersen Dates of Observation: August 4, 1999 Project No. 534-86005 Subject: Observation of Drain System for a Structure at 5532 Golden Willow Drive, Lot 38, Willow Springs Subdivision, Fling No. 2, Fort Collins, Colorado An observation was made of the drain system at the subject structure. The drain system materials observed were found to be in general accordance with our recommendations. Random measurements taken from the top of the foundation walls to the top of the drain pipe indicate that a positive slope was maintained to the sump. A visual observation showed that asphaltic damp proofing has been applied to the exterior walls of the foundation. Please call if we may be of further service. Sincerely, PROFESSIONAL SERVICE INDUSTRIF_S, INC. James C. Blankenship, P.G. Project Manager JCB:re D0534-005 Lot 38 (4 copies sent) Reviewed by: K. Craig Vaughn, Vice President FEB 24 '00 12:18 FR PSI-DENVER CO 303 423 5625 TO 19702246134 P.06/07 MRMiInformationE, .ToBuildOn Ei y eeerft a CWsAMM a TeWng July 29, 1999 Colorado North Company, LLC c10 Colorado Builder Services, LLC 7600 East Orchard Road, Suite 270N Englewood, CO 80111 Attention: Mr. Ed Petersen 's Dates of Observation: July 29, 1999 Project No. 534-86005 Subject Observation of Reinforcing Steel for a Structure at.5532 Golden Willow Drive, Lot 38, Willow Springs Subdivision, Filing No. 2, Fort Collins, Colorado Reference: Foundation Plan for the Subject Site by Advanced Engineering Concepts, Job No. 98145, Model No. 139 / Walkout Basement (Custom) An observation was made of the placement and size of the reinforcing steel in the foundation walls of the subject structure. The observation showed that the grade and spacing of reinforcing steel were in general compliance with the above referenced foundation plans. Please call if we may be of further service. Sincerely, PROFESSIONAL SERVICEINDUSTR/ES, INC. 0��A44 James C. Blankenship, P.G. Project Manager JCB:re D0534-005 Lot 38 (4 copies sent) Reviewed by: K. Craig Vaughn, Vice President n FEB 24 '00 12:18 FR PSI-DEWER CO 303 423 5625 TO 19702246134 P.05i07 [AVP%=Information MoBuild On ghghmrrn9 • eorsudffm • ToWM July 26, 1999 Colorado North Company, LLC cro Colorado Builder Services, LLC 7600 East Orchard Road, Suite 270N Englewood, CO 80111 Attention: Mr. Ed Petersen Date of Observation: July 26,1999 Job No. 534-86005 Subject Footing Observation for a Structure at 5532 Golden Willow Drive, Lot 38, Willow Springs Subdivision, Filing No. 2, Fort Collins,'Colorado References: 1. "Geotechnical Engineering Report of Foundation Design Recommendations, by PSI, Project No. 532-95053, dated May 6, 1999. 2. Foundation Recommendation Letter by PSI, Project No. 534--86005, dated July 26, 1999. 3. Foundation Design for the subject site, by Advanced Engineering Concepts, Job No. 98166, Model No 2271 Partial Basement An observation was made of the footing forms, prior to placement of concrete, at the subject site on the referenced date. The soils exposed in the excavation were capable of supporting design pressures as recommended in the above referenced documents. The soils exposed in the excavation and the type of foundation under construction are consistent with the recommendations presented in the above referenced documents. The footing excavations were clean and dry at the time of the observation. Please call if further consultation or observations are required. Sincerely, PROFESSIONAL SERVICE INDusTmEs, INC. James C. Blankenship, P.G. Project Manager ko ( Reviewed y: K. Craig Vauc Vice Presiden JCB:re D0534-005 Lot 38 I4 conies sent)