Loading...
HomeMy WebLinkAbout520 N Sherwood St 16 - Correspondence/Engineering - 03/16/2000FRC119 : FR : H0. ? Mar. 1E 2000 02:41FM Fa ADVANCED PROFESSIONAL ENGINEERING INC. Registered professional Engineers P. 13.91., Fc?.rt Col.lit;s, Co z?05' 13.9 i PHONE 970484-0533, FAX 970-484-5U86 E-MAIL ipeinc u:rrii.cum March 16, 2000 Dennis Sovick Sovick Design and Builders Inc. � m %9 S/35 750 Havel Ave. Fort Collins, CO 80521 Re: Footing and rebar Inspections for 520 North Sherwood Street, Building # 4, Fort Collins, Colorado. ag,15 /(1400 Dear Dennis, This letter covers footings and rebar inspection for building 4, located at 520 North.,,,,, Sherwood Street, Fort Collins, Larimer County, Colorado. Site visit and inspection were performed on October 14, 1999, to inspect and check the footings. The size of footings, # of rebars and their locations were inspected. The footings and steel rebars are placed according to the foundation plan by Advanced Professional Engineering Inc. A second site visit and inspection were performed on October 18, 1999, to inspect the western 1/2 of the foundation walls- Two # 5 vertical rebars placed at each side of window openinq in the stem wall. The steel rebars are placed according to the foundation plan by Advanced Professional Engineering Inc. The third site visit and inspection were performed on October 19, 1999, to inspect the eastern half of the foundation walls. The horizontal rebars were doweled into the foundation wall at the cold ioint between the two pours. Two # 5 vertical rebars placed at each side of window opening in the stem wall- The steel rebars are placed according to the foundation plan by Advanced Professional Engineering Inc. If you should have any questions concerning the information in this report, please feel free to contact this office at 970-484-0533. Sincerely, YETH Professional Engineer ., n,:m�lahla,. Colorado Reg: P.E- 23019 GI ---FOUNDATION DESIGN & INSPECTIONS • LAND DEVELOPMENT- DRAINAGE • ENVIRONMENTAL AUDrrs. PHASE 1 & LAN OSCAPE ARCHITECT - CONSTRUCTED W CTL-kND DESIGN - PERCOLATION TESTS • SEPTIC SYS! FM DESIGN