On March 30, 1998, Terracon observed the foundation excavation for the referenced project.
The soil at the upper and lower foundation levels is sandy lean clay. This soil is similar to soil
described in our Geotechnical Engineering Report prepared for the subdivision (see Project No.
20945121 dated September 12, 1994). Based on our observations, it is recommended that the
structure be supported by a spread footing and/or continuous grade beam foundation system
designed in accordance with the recommendations set forth in the geotechnical engineering report.
At the time of our observation, free groundwater and bedrock were not encountered within two feet
of the lower foundation level. However, as a precaution, it is recommended a complete dewatering
system be provided around the basement foundation. Specifically, a Type B perimeter drain
should be installed at this site.
Sincerely,
TERRACON
isa R. Schoenfeld, P.E.
Geotechnical Engineer
Copies to: (2) Addressee
LRS/cjh
Arizona ■ Arkansas 9 Colorado ■ calho 0 Illinois IN Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana
Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Uah ■ Wisconsin III Wyoming
Quality Engineering Since 1965
Irerracon
301 N. Howes • P.O. Box 503
Fon Collins. Colorado 80521-0503
(970) 484.0359 Fax: (970) 484.0454
April 6, 1998
Melody Homes
11031 Sheridan Boulevard
Westminster. Colorado 80020
Re: Lot 106, Ridgewood Hills PUD, First Filing
513 Flagler Road
Fort Collins, Colorado
Project No. 20975113
Gentlemen:
On March 30, 1998, Terracon observed the foundation excavation for the referenced project.
The soil at the upper and lower foundation levels is sandy lean clay. This soil is similar to soil
described in our Geotechnical Engineering Report prepared for the subdivision (see Project No.
20945121 dated September 12, 1994). Based on our observations, it is recommended that the
structure be supported by a spread footing and/or continuous grade beam foundation system
designed in accordance with the recommendations set forth in the geotechnical engineering report.
At the time of our observation, free groundwater and bedrock were not encountered within two feet
of the lower foundation level. However, as a precaution, it is recommended a complete dewatering
system be provided around the basement foundation. Specifically, a Type B perimeter drain
should be installed at this site.
Sincerely,
TERRACON
f ( ,
Lisa R..Schoenfeld, P.E.
Geotechnical Engineer
Copies to: (2) Addressee
LRS/cjh
Arizona ■ Arkansas ! Colortdo ■ idaho ■Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana
Nebraska ■ Nevada ■ Newklexico ■ Nonh Dakota ■ Cklanoma ■ Tennessee ■ Texas ■ Utah a Wisconsin a Wyoming
Quality Engineering Since 1965
1 rerracon
301 N. Howes • P.O. Box 503
Fort Collins. Colorado 80521-0503
(970)484-0359 Fax. (970) 484-0454
April 6, 1998
Melody Homes
11031 Sheridan Boulevard
Westminster, Colorado 80020
Re: Lot 106, Ridgewood Hills PUD, First Filing
513 Flagler Road
Fort Collins, Colorado
Project No. 20975113
Gentlemen:
On March 30, 1998, and April 1, 1998, Terracon observed the foundation construction for the
referenced project.
Observations made during the foundation construction indicate that the foundation footing sizes
and foundation wall steel and void form material placements are in accordance with the plans and
specifications for this project.
Sincerely,
TERRACON
-Lisa R. Schoenfeld, P.E.
Geotechnical Engineer
Copies to: (2) Addressee
LRS/cjh
Arizona ■ Aktu,sas ■ Colorado ■ Idaho \ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montaca
Nebraska ■ Nevada \ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah e Wisconsin 0 Wyoming
Quality Engineering Since 1965
Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521.0503
(970)484-0359 Fax:(970)484-0454
April6, 1998
Melody Homes
11031 Sheridan Boulevard
Westminster, Colorado 80020
Re: Lot 106, Ridgewood Hills PUO, First Filing
513 Flagler Road
Fort Collins, Colorado
Project No. 20975113
Gentlemen:
On March 30, 1998, and April 1, 1998, Terracon observed the foundation construction for the
referenced project.
Observations made during the foundation construction indicate that the foundation footing sizes
and foundation wall steel and void form material placements are in accordance with the plans and
specifications for this project.
Sincerely,
TERRACON
j
—L)sa R. Schoenfeld, P.E.
Geotechnical Engineer
Copies to: (2) Addressee
LRS/cjh
Arimna ■ Arkansas ■ Culolaoo ■ Idaho ■ Illinois • Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana
Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas it Utah a Wisconsin 0, Wyoming
Quality Engineering Since 1965