Loading...
HomeMy WebLinkAbout513 Flagler Rd - Special Inspections/Engineering - 04/06/1998Irerracon 301 N. MoweS • PO. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 April 6, 1998 Melody Homes 11031 Sheridan Boulevard Westminster. Colorado 80020 Re: Lot 106, Ridgewood Hills PUD, First Filing 513 Flagler Road Fort Collins, Colorado Project No. 20975113 Gentlemen: On March 30, 1998, Terracon observed the foundation excavation for the referenced project. The soil at the upper and lower foundation levels is sandy lean clay. This soil is similar to soil described in our Geotechnical Engineering Report prepared for the subdivision (see Project No. 20945121 dated September 12, 1994). Based on our observations, it is recommended that the structure be supported by a spread footing and/or continuous grade beam foundation system designed in accordance with the recommendations set forth in the geotechnical engineering report. At the time of our observation, free groundwater and bedrock were not encountered within two feet of the lower foundation level. However, as a precaution, it is recommended a complete dewatering system be provided around the basement foundation. Specifically, a Type B perimeter drain should be installed at this site. Sincerely, TERRACON isa R. Schoenfeld, P.E. Geotechnical Engineer Copies to: (2) Addressee LRS/cjh Arizona ■ Arkansas 9 Colorado ■ calho 0 Illinois IN Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Uah ■ Wisconsin III Wyoming Quality Engineering Since 1965 Irerracon 301 N. Howes • P.O. Box 503 Fon Collins. Colorado 80521-0503 (970) 484.0359 Fax: (970) 484.0454 April 6, 1998 Melody Homes 11031 Sheridan Boulevard Westminster. Colorado 80020 Re: Lot 106, Ridgewood Hills PUD, First Filing 513 Flagler Road Fort Collins, Colorado Project No. 20975113 Gentlemen: On March 30, 1998, Terracon observed the foundation excavation for the referenced project. The soil at the upper and lower foundation levels is sandy lean clay. This soil is similar to soil described in our Geotechnical Engineering Report prepared for the subdivision (see Project No. 20945121 dated September 12, 1994). Based on our observations, it is recommended that the structure be supported by a spread footing and/or continuous grade beam foundation system designed in accordance with the recommendations set forth in the geotechnical engineering report. At the time of our observation, free groundwater and bedrock were not encountered within two feet of the lower foundation level. However, as a precaution, it is recommended a complete dewatering system be provided around the basement foundation. Specifically, a Type B perimeter drain should be installed at this site. Sincerely, TERRACON f ( , Lisa R..Schoenfeld, P.E. Geotechnical Engineer Copies to: (2) Addressee LRS/cjh Arizona ■ Arkansas ! Colortdo ■ idaho ■Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ Newklexico ■ Nonh Dakota ■ Cklanoma ■ Tennessee ■ Texas ■ Utah a Wisconsin a Wyoming Quality Engineering Since 1965 1 rerracon 301 N. Howes • P.O. Box 503 Fort Collins. Colorado 80521-0503 (970)484-0359 Fax. (970) 484-0454 April 6, 1998 Melody Homes 11031 Sheridan Boulevard Westminster, Colorado 80020 Re: Lot 106, Ridgewood Hills PUD, First Filing 513 Flagler Road Fort Collins, Colorado Project No. 20975113 Gentlemen: On March 30, 1998, and April 1, 1998, Terracon observed the foundation construction for the referenced project. Observations made during the foundation construction indicate that the foundation footing sizes and foundation wall steel and void form material placements are in accordance with the plans and specifications for this project. Sincerely, TERRACON -Lisa R. Schoenfeld, P.E. Geotechnical Engineer Copies to: (2) Addressee LRS/cjh Arizona ■ Aktu,sas ■ Colorado ■ Idaho \ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montaca Nebraska ■ Nevada \ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah e Wisconsin 0 Wyoming Quality Engineering Since 1965 Irerracon 301 N. Howes • P.O. Box 503 Fort Collins, Colorado 80521.0503 (970)484-0359 Fax:(970)484-0454 April6, 1998 Melody Homes 11031 Sheridan Boulevard Westminster, Colorado 80020 Re: Lot 106, Ridgewood Hills PUO, First Filing 513 Flagler Road Fort Collins, Colorado Project No. 20975113 Gentlemen: On March 30, 1998, and April 1, 1998, Terracon observed the foundation construction for the referenced project. Observations made during the foundation construction indicate that the foundation footing sizes and foundation wall steel and void form material placements are in accordance with the plans and specifications for this project. Sincerely, TERRACON j —L)sa R. Schoenfeld, P.E. Geotechnical Engineer Copies to: (2) Addressee LRS/cjh Arimna ■ Arkansas ■ Culolaoo ■ Idaho ■ Illinois • Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas it Utah a Wisconsin 0, Wyoming Quality Engineering Since 1965