Loading...
HomeMy WebLinkAbout2208 Sandbur Ln - Special Inspections/Engineering - 05/14/20092structural Engineering 1329 East Seventh Street, Loveland, Colorado 80537 May 14, 2009 Office, (970) 663-6016, Fax, (970) 622-9324 Jamestown Builders, LLC 3003 East Harmony Road, 4th Floor Fort Collins, CO 80528 Foundation Reinforcement Observation Lot 2, Block 11, Sidehill Subdivision 2208 Sandbur Lane Fort Collins, Colorado Project Number: 09-02-014-32 Dear Mr. Everit: On May 14, 2009 this office visited the site referenced above to observe the foundation wall reinforcement size, and location and to confirm the dowel spacing in foundation forms. The reinforcement appeared to be in general compliance with the foundation drawing and details by Axiom Structural Engineering, LLC, project number: JAMB-08I18-33-25, dated September 22, 2008. There were two Ufer bars in the foundation forms. The west Ufer bar was located approximately five feet north from the south full -height basement wall. The east Ufer bar was located approximately five feet north from the south garage wall. The bottom row of reinforcement in the garage was continuous and lapped and tied to the bottom row of continuous reinforcement in the full -height basement. The two Ufer bars were lapped and tied to the continuous bottom row of reinforcing steel. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and the 2006 IRC. Please contact this office if there are questions, or additional information that is required. Thank you for the opportunity to work with you on this project. Sincerely, O0,L/C� Qe•034 3 Susan Tagg, P.E. I -RAY 14 20 Enclosures WW t II 0 stY:r. IL 2structural Engineering 1329 East Seventh Street, Loveland, Colorado 80537 Office, (970) 663-6016. Fax: (970) 622-9324 May 11, 2009 Jamestown Builders, LLC 3003 East Harmony Road, 4th Floor Fort Collins, CO 80528 Footing Observation Lot 2, Block 11, Sidehill Subdivision 2208 Sandbur Lane Fort Collins, Colorado Project Number: 09-02-014-31 Dear Mr. Everit: On May 8, 2009 this office visited the site referenced above to observe the footing form widths, depths, and reinforcement. The continuous and isolated footing widths and depths were in general compliance with the foundation drawing by Axiom Structural Engineering, LLC, project number: JAMB-08I18-33-25, dated September 22, 2008. The reinforcement for the interior pad was tied and ready to be placed in the footing. The dowel reinforcement was on site and the spacing will be confirmed with the foundation wall observation. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and 2006 IRC. Please contact this office if there are questions, or additional information that is required. Thank you for the opportunity to work with you on this project. Sincerely, Susan Tagg, P Enclosures 40343 J AY 1 1 2009 Z C'?,� , �� %irr ., ""�,4. LY l � ' ti�� � �� f �Of 1 J_� ' _. -' .. �4TH �� � _ T� � s � y,t k �- . a � .� r - � � _ ram:-,-a`...�_=��•!ir,.�,.. ,.I.c-�. �� �.— "a„� � , _ ' /� r �" ti 1' �y �p o2cZO b ���1 0<-� .!�„�" � .r � �3." ,f ; ..* 2structural Engineering 1329 East Seventh Street, Loveland, Colorado 80537 Office, (970) 663-6016, Fax: (970) 622-9324 May 20, 2009 Jamestown Builders, LLC 3003 East Harmony Road, 4th Floor Fort Collins, CO 80528 Perimeter Drain and Damp -proofing Observation Lot 2, Block 11, Sidehill Subdivision 2208 Sandbur Lane Fort Collins, Colorado Project Number: 09-02-014-33 Dear Mr. Everit: On May 19, 2009 this office visited the site referenced above to observe the perimeter drain and the damp -proofing of the exterior foundation walls that retain earth and enclose habitable or usable spaces located below grade. The perforated pipe was bedded in gravel, with building paper over the pipe. A sump pump was located on the interior side of the foundation walls. The damp -proofing appeared to adequately cover the foundation walls. The damp -proofing application is used to help reduce moisture that can permeate through the foundation wall. Damp -proofing is effective in the absence of hydrostatic pressure and cracks in the foundation. It is important to keep vegetation that requires watering out of the backfill area of the foundation excavation. Please contact this office if there are questions, or additional information that is required. Thank you for the opportunity to work with you on this project. 0 Uce Sincerely, �� � P�••�d �iop_ 343 1�Y 20 200,E Susan Tagg, P.E. ; Enclosures _ __