HomeMy WebLinkAbout5657 Kadenwood Dr - Disclosures/Mechanical - 04/01/2014 (2)City of Fort Collins Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, with Pass/Fall outcomes. For information on measurement tools and testing techniques, see the
'Residential New Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Target
Measured value°
to compare with
Pass
x-�'
�F�t
'
Caution
Other
or limit
target or limit
ggng `_
�;# �
'
data
z
s
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude (5000'), air temperature through tool
Volumetric flow (CFM 5000') = ADCF x Indicated flow (CFM)
Address 5657 Kadenwood Dr Date of 'Residential
'--'Mechanical Systems
Builder Meritage Homes Design Submittal' EP
information referenced
WAC contractor Four Seasons Heating Inc. - by testing technicians
As -built changes
mech design submi
Testing date(s) 4/1/14
Local2. (Spot
Bath exhaust Testing tech (initials) EP
[3: Flow _ Flow box _ Pilot tube duct traverse Air temp
tool [ Passive flow hood _ Other (note below) through tool (F) 71 ADCF 1.098
"a" Minimum Airflow Requirement Indicated Volumetric
Exhaust Pickup Location AlCFM (CFM 5000') Flow Flow Pass Fail
snarl,[ +Type of Operation (CFM) I (CFM 50001
Bath 2
50
., 50 Intermittent ._ 20 Continuous'
80
88
u. ,.
Laundry
50
,L50Intermittent 20Conbnuous,
82
91
Master W/C
50
u[ so Intermttent 20 Continuous S:
71
79
10'
Master Bath
50
(501ntermittent ' 20 Continuous;,
80
88
❑
C'
501nlermittenl i520 ?plInuous!:
❑
[,�;.
10Intermittent `= 20 Continuous?`
❑
�
M
50 Intermittent _ 20 Conpnuous.;'
❑
Testing
notes
Kitchen exhaust N/A - hood does not vent to outside ❑✓ Testing tech (initials) EP
Oven fuel _ Ges _Electric Minimum airflow requirement (CFM 5009) + operation L 100 In(ermtttent <25 Conhnuaug.
Measured eirflow
Flow box _ Pilot tube traverse Interior rills Air temp
fi Flo —_ Passive Dow [rood _Flow grid Tool - Exhaust through ❑ ADCF
�
tool _ Powered pow hood _ Other (note below) location tExterbr terriih—on not OK)) tool (F)
Indicated flo CFM Volumetric Howl lICFM 5000' ❑ PassWIff
Fail
Testing ...
notes
Residential Mechanical Design Submittal V20140101 Page 1
• 1 • on
Systems other than substructural floor exhaust Testing tech (initials)
Code -minimum ventilation airflow Design ventilation
Chased on CFA and # of BR)�CFM 5000' airflow�CFM 50oD' Exhaust -only
System —Supply-Doty
-: Target ventilation airflo
ow range
tCFM 500V type Balanced
(coda mWmem) (720%afdes(gO Now)-::�:
Measurement Method ) Tool Location
Air Temp
Through I ADCF I Inflow cated I VolFlowtric IPassl Fail
Tool IFl tCFMI ICFM 50004
Total
— WA _ Passive flow hood
'? exhaust
_ Flow box - - Prot tube traverse
with other system" -
" "
❑
airflow
_Flowcollar _Other (note below)
Total
_ N/A Passive flow hood
supply
_
_ Flow box _ Pitot tube traverse
❑
nx n
airflow
_ Flow collar —Other (note below)
When supply airflow Is circulated by air handler fan, tan speed for measurement Heating �( Cooling Continuous fan
ilanoed airflow In balanced systems
Average of measured CFM Target flow range
supply+exhauslflows 5000' (average t° = 5000' Pass 0.;Fail
Substructural floor exhaust m WA -- no sub -structural floor exhaust system Testing tech (initials)=
Design exhaust airflow (based on CFM 5000' Target alrtlow limits to CFM 5DOD'
approved design) (design
Measured airfow
Flo —Flow box _ Pilot tube traverse Tool Airtemp
Passive flow hood Flow cellar through ADCF
to — — location F_ Powered flow hood _ Other (note below) toot (F)❑
�r
£ Indicated 0o CFM Volumetric flow CFM 5000' ❑ Pass r Fall
GT
Testing
notes
Heating4. + Cooling Duct Leakage
NIA —No ductwork Testing notes
V No ductwork outside conditioned space (Ind mwbpie Sys)
Duct leakage "'9Y er ;'"name,
data source �com rat
company, testing date):
Ztg
House conditioned floor area �/ 2
Air temp
of
ADCF
�
(include full basement)
through tool (F)
Maximum Allowed Duct Leaka a
Measured Duct Leakage
System #1
System #2
Test Parameter and Conditions
Normalized
(CFM25 5000' /100 st)
Absolute
(CFM25 5000')
Indicated
(CFM25)
Volumetric
(CFM25 5000')
Leakage Type
Timing
Air Handier
Pass
Fall
Pass
Fail
Total leakage
Rough -in
Excluded
4
❑
�e
❑
QS
Total leakage
Rough -in
Included
6
��f
t
Total leakage
Complete
Included
12
`
❑
❑
11
+fig
ea age
to out
Complete
Included
8
❑
tt_
❑
X�s
a -
Residential Mechanical Design Submittal V20140101 Page 2
0 eating t(Cooling Equipment',,', ,
For multiple systems, attach one page per system
System #F2__j Which parts of house does it serve?l Upstairs
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials)FEP
i
Furnace or Boller
AC or Heat Pump Condenser
AC or Heat Pump Coll
Manufacturer
Goodman
No A/C
Model#
GKS90453BX
�1 Filter Basic fiberglass Electrostatic Thickness MERVF
7, brand Type V Basic pleated Other.
(Inches) (optional) 8
Hig"Iffic pleated
Static pressures
setup
Speed: Heating Cooling Cont. fan
High -stage for multi -stage equipment
Blower speed tap:
Humidifier damper: N/A
—Open (Heating)
Closed (Cooling)
ZAII registers open
Zone dampers open
SPI
AP Filter (SPI _ SP2)
Cooling: Measured air flow through Indoor coil
Design cooling airflow 593 CFM 5000'
(high stage)
Measured alrflow
SP2 65
91 NIA -- no AC Installed
Tesfing tech (initials)FE—P1
(Same Iccallon
SP4 64.6 for NSOP,
TFSOP)
AP Coll
(SP3SPQ
SP3
Testing tech (initials)FEP
Target airflow limits (design +/- 15%)150S.*.'�MffikA7FCFM 50W9
Z 20 P
':
Flow grid 14 through 71 ADCF NSOP
Ar temp
tool (F)
F
Measured airflow, no Indicated airflow
It 20 CFM CFM
adjustmenticorreci on Measured AF x FRCF
Testing
notes
Heating: Gas manifold pressure
Manifold pressure
OEM Spec @ 5000' 3.5 IWC
Heating: Temperature rise
TFSOPE Flow Resistance
Correction Factor
Volumetric aIrfi 681 CFM Pass
h'JUWAFxAD1jCFE:]05D00' FFell
(high stage)
Target manifold P
3.3
limits (Spec +/- 5%) ; . ..... IWC
OEM temperature rlselimits j25-:
(high stage).. F
I
Temp 52
air air rise
Measured temps fl: supply F12 7 turn F FPass Re75
Testing tech (Initials)FEP
Measured 3.3 IWC Pass
pressure Fall
Testing tech llirfltials)=
5W Fall ffCautfon: within 10F
I,.,j,,iof top of range
Residential Mechanical Design Submittal V20140101 Page 3
Testing tech (initials) EP
Testing approach and targets
❑ N/A: No complete AC system ❑ N(A: House completed November • April pnstallrtg mntractar repo Ue rnr testlrg in warm weather)
.':; ❑ TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (timumentaeon requited)
Temperatures Condenser Novmt-bu Return Target Target Target
(F): entering air temp airwet-bulb temp superheat subcooling approach
Subcooling
Discharge❑ Condenser Liquid❑ Actual❑ ❑ TXV Pass: Actual SC in +/-
" pressure saturation T F line F subcooling F 3 F of target SC, 2 F min
(PSI) (soar man) temp (CoMT-IigFnaT) LQTXV FaiI
Superheat
Suction Evaporetor Suction Actual ❑ Non-TXV Pass: Actual SH
pressure saturationrt)F—IF IIne�F superheat❑F within+/•5FoftargetSH
(PSI) (slwo man) temp (Suct fine T-evep 7) i,[Non•TXV Fait
z' TXV checks: ❑ Pass: Field -Installed TXV Installed in accordance with OEM Instructions 0 Caution: Actual SH outside mfgr range
Approach
1 �F El Approach Pass: Actual approach within+/• 1 F of target approach
tam (tq line T- condenser EAT)
Liquid line F Actual approach�Q.Approach Fail
Testing
n�r„a
Room Air Flow + Pressure Balance
Register air flows Testing tech (initials) EP
All registers are cut through finish materials and moving air ❑ Pass j[ Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance Testing tech (initials) EP
Room
Room -to -Core
Measured
(match names on plans, Include
Pressure Drop
Pressure
Pass
Fall
basement if there is a door)
Target Range (Pa)
Drop (Pal
Master Bedroom
r0 ;
Bedroom 2
3 to+3
1.3
Bedroom 3
3 to +3
2.319
❑
.
3 tq +3
El
ycrmn�
Ito+3
El01ytL
'
3 to +3
❑
ri^MAS
r0m;
MA
Jto+3
❑MIR
4 to +3
❑®
3 to +3
❑]
-3 to +3
❑
�❑:
Residential Mechanical Design Submittal V20140101 Page 4
4
Combustion safety testing N/A — no natural -draft combustion appliances
10 (Appliance Types table must be completed for every home)
Appliance types
Applia
Furnace #1
Fumaoe#2
r.
Soller#1
#2
#1
heater #2
Fireplace #1
#2
Testing tech (initials) 7EP]
nce
Combustion
pe
NW/A
Draft -hood
T(Na't'u'ftral-draft)
Induoed-draft
(NaturalW-draft)
Power-
vent
Direct
vent'
Powered sealed.
I combustion
Electric
01
0
0
1 El
D
1 11
0
El
11
11
11
0
0
0
Worst -case depressurization performance
are
# of bath fans on
—Vented range hood on
Clothes dryer on
Air handler on
Other fans on: Other setup notes:
Outdoor temperature F
CAZ pressure
BPI depressurization limit (Pa min outside)
Measured net CAZ depressurization (Pa wrl outside)
OK (less negative) i Caution (more negative)
Spillage
BPI maximum limit (seconds
Measured spillage duration (seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit (Pa val CAZ
d:
Measured (Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration In undiluted flue gas
F4 :L
El JOK JM- I Caution D JOK 1�-Jffij Caution 0 JOK _13,j Caution
60
0
60
❑ Pass 1;�'W lFail
_r
7ff Pass IMIFail
I El jPass ,"QJ.fFaiI
IIj 0 IPass j14Qj'jFaiI ❑ Pass _@Fall ❑ jPass jjfflFall
I.: BPI maximum limit (ppm)
0 10 06
0..
Measured CO (ppm)
Pass = CO level not exceeding limit ❑ IPass 1�. Fall lFaFl ❑ jPass IMIFell
Caution = CO level 25 to 100 pipm ]Caution �,,Qy!Jcaulion 'y lCaution
Testing
notes
i
Residential Mechanical Design Submittal
V20140101
Page 5
9. System Controls . ..
Testing tech (Initials) EP
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
WA
is
Pass
Fail
Whole -house ventilation
❑
WA
[
Pass
Fail
Sub -structural floor exhaust
❑
WA
❑
Pass
flS
Fail
z �rw
Heating (all systems)
❑
WA
❑.
Pass
f,,
Fall
Cooling (all systems)
®
N/A
❑
Pass
FBIri
Fail
Signatures
Technician 01 performing Inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
^3.City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print) Ernesto Pineda
Title Air Flow Tech/ Service Tech
= Company Four Seasons Heating Inc.
Signature and Date Ernesto Pineda
F"
Technician 02 performing inspection and testing documented on this report (Approved Agency)
t:aY
;£ I certify that the tests referenced above, In sections bearing my initials, were performed In accordance with protocols specified by the
00ty of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Na
t'
5 Signature
H_VAC Contrac
I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the Installed mechanical
5<+;systems.
Name (print)
r.>;I
s>13
Title
Fz
?
Company
`'
!.'
Signature and Date
Lynn Cobb
Project Manager
Four Seasons Heating Inc.
Lynn Cobb 412114
Residential Mechanical Design Submittal V20140101 Page 6