Loading...
HomeMy WebLinkAbout5627 Cardinal Flower Ct - Special Inspections/Engineering - 02/20/2014IP February 20, 2014 KEM Homes, Inc. 7352 Greenridge Road, Unit A-6 Windsor, Colorado 80550 Attn: Ms. Cindy O'Neal Re: Foundation Bearing Observation 5627 Cardinal Flower Court Lot 4 — Casey's Garden Fort Collins, Colorado EEC Project No. 13-01-081 Ms. O'Neal: ,EEC. EARTH ENGINEERING COMPANY, INC. As you requested, on August 5, 2013, Earth Engineering Company, Inc. (EEC) personnel visited the referenced site to evaluate the proposed foundation bearing materials at the referenced address. The results of the site observations completed by EEC personnel are included with this report. On August 5, 2013, EEC personnel observed foundation bearing materials for the foundation footings for the referenced residence. We understand the residence will be a lightly loaded wood frame structure constructed on a full basement. At the time of our field observations, the building area had been excavated to approximate foundation - bearing elevation and the foundation footings were already in place. The garage foundation bearing level was at a depth of approximately 3 feet below present site grades. Brown sandy clay soils were encountered at that location. The materials encountered at the basement foundation bearing level consisted of light brown sandy clay soils. A hand auger boring was excavated to a depth of approximately 3 feet below the basement foundation bearing level which revealed like materials to the depths explored. Dynamic cone tests indicated the in -sandy clay soils were medium stiff to stiff in consistency. A relatively undisturbed sample was obtained at the approximate garage foundation bearing level for swell/consolidation testing. The laboratory swell/consolidation testing indicated the sandy clay soils at the garage foundation bearing level had low potential for swelling with increase in moisture content at current moisture/density conditions. P.O'. Box 271428 P.O. Box-49322 ,FORT. COLLINS COLORADO 8052.7- 1 428 COLORADO SPRINGS'. COLORADO 80949�9322 (970) 2 24-1 522 (FAX) 563-0282: (7.19) 442:-5813 (FAX) 447-9635 EEC Project No. 13-01-081 February 20, 2014 Page 2 Earth, Engineering Company,, Inc, The materials observed in the excavation were generally consistent with those outlined in the soils report prepared by Earth Engineering Company, Inc., dated April 23, 2013. Based on the results of the outlined field testing and observation, it is our opinion the in -situ materials could be used for support of the footing foundations using a design maximum net allowable total load soil bearing pressure of 1,500 psf. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this letter, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. Michael J. Coley,'P.E. Principal Engineer MJC/dla SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Sandy Clay Sample Location: S-1 @ 3' (Garage Foundation Bearing Level Liquid Limit: -- IPlasticity Index: -- I % Passing #200: -- Beginning Moisture: 19.4% JDry Density: 101.1 pcf JEnding Moisture: 24.2% Swell Pressure: 1000 psf % Swell @ 500 sf: 0.4% 10 8 3 6 U) 4 c 2 0 E m ° 0 c a e dded a -2 c -4 0 m v 0 c -6 0 U -8 -10 0.01 0.1 1 10 Load (TSF) Project: Lot 4 - Casey's Garden Fort Collins, Colorado Project No.: 13-01-081 Date: August 2013 40 fJ 302s� E; February 20, 2014 KEM Homes, Inc. 7352 Greenridge Road, Unit A-6 Windsor, Colorado 80550 Attn: Ms. Cindy O'Neal Re: Foundation Drain and Damp Proofing Observation 5627 Cardinal Flower Court Lot 4 — Casey's Garden Fort. Collins; ,Colorado EEC Project No. 13-01-081 Ms. O'Neal: EARTH ENGINEERING. COMPANY, INC. As requested, Earth Engineering Company, Inc. (EEC) personnel have completed the construction observation services you requested for the referenced project. Those services included observations of the foundation drain placement and damp proofing at the referenced address.. The results.of those observations are included with this report. On August 30, 2013, EEC personnel observed the foundation drain for the referenced project. The foundation drain consisted of 4-inch flexible perforated pipe placed around the below grade exterior perimeter of the structure and was connected to a basement sump pit. The drain line was covered with a filter sock and was bedded in gravel. The gravel bedded was also covered with .filter fabric.. The damp proofing consisted of grey spray -on coating that appeared to cover all exterior below, grade areas of the baseriienf walls. We appreciate the opportunity to be of service to you on this.project. If you have any questions regarding this report, or if we can be of further service to you in any way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc: �Pp0 REt/sr oti0; •�'ci, cF, iO3 j:y o:o 57 . ON. Michael J. Coley, .E., Principal Engineer P.Q. BOX, 271428 FORT COLLINS, COLORADO 60527-1428 (970) 224-1522 (FAX) 663-0282 P.O. BOX 49322 COLORADO. SPRINGS, COLORADO 80949.9322 (719). 442-6813 (FAX) 447-9635' KEM Homes Cbnstruction, Inc. Mir T MES Pride in OLIality - Sike 1974 - NvNvxv. KEM homes.com