Loading...
HomeMy WebLinkAbout386 Cajetan St - Disclosures/Blower Door Test - 03/14/2014BUILDING LEAKAGE TEST Date of Test: 3/14/2014 Customer: FR Development Fort Collins, CO Test Results 1. Airflow at 50 Pascals: (50 Pa = 0.2 w.c.) 2. Leakage Area: 3. Building Leakage Curve: 4. Test Settings: 5. Accuracy Level Test File: FIR Dev 386 Cajetan St BD Technician: Paul Higman Project Number: Building Address: 386 Cajetan St Fort Collins, CO 80524 1047 CFM50 (+/- 5.8 %) 2.94 ACH50 57.6 in2 LBL ELA @ 4 Pa Flow Coefficient (C) = 74.0 (+/- 26.1 %) Exponent (n) = 0.677 ( +/- 0.078 ) Correlation Coefficient = 0.99338 Test Standard: RESNET Multi -Point Test Test Mode: Depressurization Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 59.1 CFM 0.17ACH 2. Estimated Design Infiltration Rate: Winter: 95.3 CFM Summer: 63.3 CFM 0.27 ACH 0.18 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: Paul Digitally signed by: Paul Higman %DN: CN = Paul lHig anC=US HigmCan D e. 2014.03.17 0, :40:50-06'00' BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 3/14/2014 Test File: FIR Dev 386 Cajetan St BD Building Information Location Climate Information Volume 21330 Surface Area Floor Area 2370 Height 18 # of Bedrooms 3 # of Occupants Year of Construction 2014 Wind Shield M Heating and Cooling Cost and Efficiency Information Heating Fuel Gas Heating Fuel Cost Heating Efficiency % Cooling Fuel Cost Cooling SEER Ventilation Weather Factor 0.87 Energy Climate Factor 17.00 Heating Degree Days 6128 Cooling Degree Days 297 Design Winter Wind Speed 7.3 mph Design Summer Wind Speed 9.4 mph Design Winter Temp Diff 73 deg F Design Summer Temp Diff 15 deg F Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) Default Micromanometer Energy Conservatory DG700 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 3/14/2014 Test File: FIR Dev 386 Cajetan St BD Depressurization Test: Environmental Data Indoor Temperature (A°F) Outdoor Temperature (A°F) Altitude (ft) 52.0 1 72.0 4980.0 Data Points - Data Entered Manually Nominal Baseline Adjusted Fan Building Pressure Building Pressure Pressure (Pa) (Pa) (Pa) -6.0 n/a n/a -55.9 -48.2 262.7 -49.8 -42.1 220.4 -45.0 -37.3 190.6 -40.0 -32.3 150.6 -34.0 -26.3 120.6 -30.4 -22.7 91.0 -24.8 -17.1 75.2 -20.5 -12.8 39.5 -9.4 n/a n/a Time Averaging Period: 5 Nominal Adjusted Flow Flow Fan (cfm) (cfm) % Error Configuration 959 1013 -0.8 Ring B 879 928 -0.4 Ring B 818 864 0.7 Ring B 728 769 -1.2 Ring B 652 689 1.6 Ring B 567 599 -2.3 Ring B 516 545 7.7 Ring B 375 396 -4.8 Ring B Deviations from Standard RESNET Multi -Point Test - Test Parameters - The Time Averaging Period is less than 10 seconds. BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 3/14/2014 Test File: FIR Dev 386 Cajetan St BD Comments House WRT Garage = 45.3pa