As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation
formwork and reinforcing steel for the above referenced single family residential property and
found them to be in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed
in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical
Code (NEC). The footings were observed on November 27, 2013 and the foundation walls were
observed on November 29, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
REG�/11
s
12/3/13
24995
Thomas M. Cope TONAL
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
Job No. 141172
December 16, 2013
J & J Construction of N
7251 W. 20th St, L-200
Greeley, CO 80634
Colorado
Structural s Geotechnicel: R atio
eg
RMG .�;� CQF72172LIditly
Blaekrme,Uirc Nwovzry fkevvrm:
ENGINEERS
www.rmgengincers.com
Re: Foundation Subsurface Drain Observation
2326 Thoreau Dr
Lot 12, Block 21, Maple Hill, Final Plat
Fort Collins, Colorado
Dear Larry:
As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface
drainage pipe and sump pit perimeter drain system on December 16, 2013. RMG found it to be
complete and in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure at the date of this observation.
Should you have questions, please feel free to contact our office.
Cordially,
p RE-�S
~fir 12/18/13`�'
24995
Thomas M. Cope ss�ONpl .�
Professional Engineer
11
Nouthern URice: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
Job No. 141172
December 3, 2013
J & J Construction of N
7251 W. 20th St, L-200
Greeley, CO 80634
r/ tructural Geotechcncal
,-RMG..
ENGINEERS'
Colorado
Re: Foundation Damp Proofing
2326 Thoreau Dr
Lot 12, Block 21, Maple Hill, Final Plat
Fort Collins, Colorado
Dear Larry:
�t%ttd.F72±d+ttd
&�uiki •Fur Setans,y Reawrces
As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp
proofing and found it to be complete and in substantial compliance with the design drawings
prepared by High Plains Engineering & Design, LLC for this structure at the date of the
inspection. The damp proof was observed on December 3, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
-uctural • GeotechnicaO luildi4
.atyNG 7RMGINEERS
www.rmgcngincers.com
Job No. 141172
November 26, 2013
J & J Construction of N. Colorado
7251 W. 20th St, L-200
Greeley, CO 80634
Re: Open Excavation Observation
2326 Thoreau Dr
Lot 12, Block 21, Maple Hill, Final Plat
Fort Collins, Colorado
Dear Larry:
RMG Engineers Group (RMG) conducted a foundation excavation review for a single-family
residence under construction at the above -referenced site located in Fort Collins, Colorado on
November 26, 2013.
The footings were excavated to the clayey silty sand, which is similar to those soils described in
the Subsurface Soil Investigation — Maple Hill Subdivision — Final Geotech, Fort Collins,
Colorado, prepared by RMG Engineers Group, RMG Job No. 139242 and dated September 30,
2013.
RMG did not encounter groundwater within three feet of the proposed footing elevation. The
soils supporting the footings will be a low expansive material. Based on the soil conditions
encountered within three feet of the footing level, a continuous spread footing may be designed
and constructed in accordance to the above mentioned Subsurface Soil Investigation.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
��bpS,p REG/
&�4 11/27/13k'
y2�4�y9y/95 m
Southern Office:
Central Office:
Northern Office:
Colorado Springs, CO
Englewood, CO 80112
Evans, CO 80620
719.548.0600
303.688,9475
970.330.1071
Monument: 719.488.2145
Pueblo: 719.544.7750
Woodland Park: 719.687.6077