Loading...
HomeMy WebLinkAbout920 Campfire Dr - Disclosures/Mechanical - 12/20/2013Ceved� �IULk 0:52,A �o-ZS�� City of Fort Collins Residential Mechanical Systems Performance Report This form Is a record of testing targets and results; with PasslFail outcomes, For information on measurement tools and testing techniques, see the "Residenval New. Construction. Mechanical Systems Testing Guide," The guide and this. form may be periodically updated;. check. the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency," andsubmitted to Building Services as a. requirement for receiving a C.O. Color key "�'�`" Measured value -to � n.� '�'"� �* �,� • "—' Ei7ttortll compare.rnthlargetor�Pess Fail�rCapi? Other dale Address Builder HVAC contractor Testing date(s) i ,7, / ZJ Bath exhaust Airtlo-w measurement method 2'Flow box • Firm cnliar _ Passiveflow hood _ Pilot tube traverse Temperature of air lhrougf IndiMted flow to Volumetric flow multiplier measurement tool / F @ 5000', air temperature } Measured Exhaust Airflow Operation Mhtlnrum Design Indicated Exhaust Pickup Location Intermittent or Airflow Requirement Airflow (CFM .Flow Volumetric Flow 5,000') Pass Fail Continuous (CFM S000') 5000') (CFM) (CFM o ;Zilntermit _ConlinG �•...:: lintermit _ CongnbZ �s 6iK'' �. r?- _intermit Cdnlln. ❑ O,4s Intermi I Conlin _ intermit _Conlin _intermit _Contin. t O aC Intermit Co tin. _ _ u ,, _ xi Q A Intermit Kitchen exhaust Oven fuel _Gas Eledtric Exhaust airflow, Y' Operation _ Intamiieent _Continuous �. Measured airflow N1A — Kitbherthood does not vent outside Minimum oxhaust sirffowrequirement CFM 5000' Airflow measurement method Flow box _Flaw collar - '._Passive flow iwa! Pitottubo traverse 'a Tom ocaturn of air through p Indicated flow to Volumetric now multiplia;q,rI----'--��� measurement tool �JF @ 5000', air temperalur� ___LLL..���J Indicated DowCFM VolumetriC fl0w1, IGFM 5000'. ED Pass ' Fail Testing notes (fan speed, masking, flow out of range, .. , J Macho m; Systems Panarmanw Testae SuCmitmi Form u201206011 5 of ll t SGC � J '� ' �ka's s n- S •Wfiole Dwelling Unit'Vendlatton�.;"�' floorSystems other than sub -structural Minimum exhaust eirflow requirement CFM 500c' Indicated to Measured Airflow i '"n_il Volumetric Indicated Flow Volumetric Flow Design Airflow Measurement Measurement Location + Flow (CFM 5000'} Method Air Temperature (F) Multiplier (CFM) PosslFail (CFM 5000') r " Flow box Si Total exhaust airflow f" ri — Passive flow hood _Flow ratter (� Ai t" tC' nil ) [p - _ Pilot tube traverse J v : S` � _Flow collar - +z Total supply airflow, I /t !r NIA Pilot traverse —Flow >~ �Fnd7 4. lL., Passive flow hood is,FF r systems in which supply airfow, is crculated by the air handier fan: fan speed for measurement) — Heat cooling Continuous fan Balanced airflow in balanced systems --t Average of measured supply ICFR9-SODO' Target flow range %; _ and exhaust flows I {average ±i- t fi°�,) ,r f, o CFM SOgD' Pass ❑Fail Sub -structural floor exhaust N/A-- no suo-structural floor exhaust systrm :-. Design airflow ]CFM $000' i� Measured airflow ar Flow box Flow collar Airflow measurement method — passive flow hood Pilot tube traverse Tnmperature of air through F Indicated flwV to VOIrlmetriC flow MultiplierllTj��''�—IIII measurement too! Q 5000'. air temperatuml�J Indicated tbw�CFM Volumetric flowGFM Pass �Fail N/A - no duchvork or no ductwork outsidn conditioned space Temperature of air through�F ' measurement toot House conditioned Boor area ---_—Is( Indicated now to Vclurretric now multiplier 5000', air temperature 1 r Maximum Allowed Duct Leakage Measured Duct Leakage Test Parameter and Conditions Normalized Indicated Flow volumetric 7TAbsolute (CFfd2511(CFM25} Leakage (CFM25) Flow (CFM25 5000') Measurement Timing qir Handler Pass/Fail Total leakage Rough -in Excluded 4 - —` Total leakage Rough -in Included 6 y ' ❑ Total leakage Complete Included 123' ❑ A Leakage to outdoors Complete included NCrdlaNcal Sya+eM Panarmence Tas+ne Suhrrhtol Form V`202acea 2018 Filter type Brand Type / style Thickness inches MERV (optional) I Static pressures (OPTIONAL) Coding coil installed _ Y —N Mode: _ Hosting _ Cooling Continuous Fan Fan speed tap_ Humidifier bypass _ Open _Closed All registers open P=- AP filter = �`_` 1 — -- P=♦ P= « LP AC coil = i _ AP Total ESP = Cooling: Measured air flow through Indoor coil using flow grid ❑ WA —no AC system installed >z Design cooling airflow CFM 5000' 'target al;ilow limits (design 0- 15°A) to ^v— CFM 5000' im, Measured airflow .' Cooling ion speed hp Flow grid plate size -� Temperature of ore tnttoo�Indicated flow to Volumetric now multiplier measurement too! F fdr 5000', air ;emperature NSOP�_—Pa TFSOPrI Pa Flow Resistance Conxtirm FactorC��—t Measured airflow, no odjuslments or correction I _.1 CFM Adjusted (indicated) airflow l ICFM ?� Volumetric flowCFM 5000, ❑ Pass Heating: Gas manifold pressure °F1 OF1Ji manifold pressure r.. sspecification, 5000'- ,j ItWC Target manifold pressure limits {spe;.+! 5%) � -.Z;o3- y IWC Measured ma (..-� INC �-a % ' t24.. Pass Heating: Temperature rise i OEM temperature rise Bin its Measured :emperature rise Return air : F Supply airJp r :r •i Temp rise J� - F [, Caution: Temp rise within �- Pass t,[] Fall J 10 F of top of range rAarJranirsi S)roma Pcdsrmonce taamO swminal F, V2e12e608 S•` 3 of (This section under development, not yet being enforced) Register air flows Pill registers are cut through finish materials and moving air 94 pass i' Fail D� (Remainder of section under development not yet being enforced) Pressure balance 0 Pressure differeoce, limit. room -le -core I .- -3 lio 11 tk, " I Pe Room Measured pressure P ass Fall drop (Pa) in q 4-e-,- rig pp we h- Metmimical Systems Perfulmanvi Testing SUbinmis! For, V20120608 A of 6 WIN R-M!''i q; MIMI NIA -- M natural draft combustion applianous Outdoor temparaturel� F Worst -case depress urizatlo n testing I House setup 1 Y. # of bath fans on These doors are closed: —Vented range hood on Clothes dryer on Air handler on Other fans on ��q I estedl appliances Appliance Type Location ,CAZ pressure BPI depressurization omit Pa wri outside Measured net CAZ depressurization Pa cartcartoutside OK (loss negative) I Cauticn (more negative) BPI Maximum limit Measured spillage duration Pass = duration not exceeding limit Draft, pressure BPI limit Measured — Draft -hood — I nduced-draft Draft -hood Indiced-draft Draft -hood Induced -draft ❑ OK 1,0'1 Caution ::IO�KE� Caution [] OK Caution seconds 60 seconds 0 1 Pass rail 0 1P.. -i Fail Pe wit CAZ Pa wn CAZ Pass = pressure more negative then limit CO concentration in undiluted flue gas BPI maximum limit porn Measured CO porn Pass = CO level nal exceeding limit Caution = CO level 25 to 100 ppm �Pa Pass fFail Pass Fail ...... j... i;all Fail Fail Fail I �Parl �EV �Fwl =Pas51,1D Caution clutioe Meen010ra1 SYMOMI Porflarn.nee Towula Submitral Fem V20120605 - Ufa System controls operating per design intent �j S ntem pass — all Local e�haust _ Wholo-house ventiWirn Sub -structural floor exhaust; s fl Heetino Cooling��:j Approved Agency (technician performing inspection and testing documented on this form) Name(print) Title t. Ccm an S P Y Signature and Date„ 6 HVAC contractor (F .� Name (pint( Title . Company Signature and Date 1.18 ncal symms Fffm Om 7estne Su0m11a1 Fm V=70608 00e