HomeMy WebLinkAbout920 Campfire Dr - Disclosures/Mechanical - 12/20/2013Ceved� �IULk 0:52,A �o-ZS��
City of Fort Collins
Residential Mechanical Systems Performance Report
This form Is a record of testing targets and results; with PasslFail outcomes, For information on measurement tools and testing techniques, see the "Residenval New.
Construction. Mechanical Systems Testing Guide," The guide and this. form may be periodically updated;. check. the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," andsubmitted to Building Services as a. requirement for receiving a C.O.
Color key
"�'�`"
Measured value -to
�
n.� '�'"�
�* �,� •
"—'
Ei7ttortll
compare.rnthlargetor�Pess
Fail�rCapi?
Other dale
Address
Builder
HVAC contractor
Testing date(s) i ,7, / ZJ
Bath exhaust
Airtlo-w measurement method 2'Flow box • Firm cnliar
_ Passiveflow hood _ Pilot tube traverse
Temperature of air lhrougf IndiMted flow to Volumetric flow multiplier
measurement tool / F @ 5000', air temperature
} Measured Exhaust Airflow
Operation
Mhtlnrum
Design
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Requirement
Airflow
(CFM
.Flow
Volumetric Flow
5,000')
Pass
Fail
Continuous
(CFM S000')
5000')
(CFM)
(CFM
o
;Zilntermit _ConlinG
�•...::
lintermit _ CongnbZ
�s
6iK''
�.
r?-
_intermit Cdnlln.
❑
O,4s
Intermi I Conlin
_ intermit _Conlin
_intermit _Contin.
t
O
aC
Intermit Co tin.
_ _
u ,, _
xi
Q
A
Intermit
Kitchen exhaust
Oven fuel _Gas
Eledtric
Exhaust airflow,
Y' Operation _ Intamiieent _Continuous �.
Measured airflow
N1A — Kitbherthood does not vent outside
Minimum oxhaust sirffowrequirement CFM 5000'
Airflow measurement method
Flow box
_Flaw collar
-
'._Passive
flow iwa!
Pitottubo traverse
'a
Tom ocaturn of air through
p
Indicated flow to Volumetric now multiplia;q,rI----'--���
measurement tool
�JF
@ 5000', air temperalur�
___LLL..���J
Indicated DowCFM
VolumetriC fl0w1,
IGFM 5000'. ED Pass ' Fail
Testing notes (fan speed, masking,
flow out of range, .. , J
Macho m; Systems Panarmanw Testae SuCmitmi Form u201206011 5 of ll
t SGC � J '� ' �ka's s n-
S •Wfiole Dwelling Unit'Vendlatton�.;"�'
floorSystems other than sub -structural
Minimum exhaust eirflow requirement
CFM 500c'
Indicated to
Measured Airflow
i
'"n_il
Volumetric
Indicated Flow
Volumetric
Flow
Design Airflow Measurement Measurement Location +
Flow
(CFM 5000'} Method Air Temperature (F)
Multiplier
(CFM)
PosslFail
(CFM 5000')
r "
Flow box
Si
Total exhaust airflow
f" ri
— Passive flow hood
_Flow ratter
(� Ai
t" tC'
nil
)
[p
-
_ Pilot tube traverse
J
v :
S`
�
_Flow collar
-
+z
Total supply airflow,
I /t
!r
NIA
Pilot traverse
—Flow
>~
�Fnd7
4.
lL.,
Passive flow hood
is,FF r systems in which supply airfow, is crculated by the air handier fan: fan speed for measurement) — Heat cooling Continuous fan
Balanced airflow in balanced systems --t
Average of measured supply ICFR9-SODO' Target flow range %;
_ and exhaust flows I {average ±i- t fi°�,) ,r f, o CFM SOgD'
Pass ❑Fail
Sub -structural floor exhaust N/A-- no suo-structural floor exhaust systrm
:-. Design airflow ]CFM $000'
i� Measured airflow
ar Flow box Flow collar
Airflow measurement method — passive flow hood Pilot tube traverse
Tnmperature of air through F Indicated flwV to VOIrlmetriC flow MultiplierllTj��''�—IIII
measurement too! Q 5000'. air temperatuml�J
Indicated tbw�CFM Volumetric flowGFM Pass
�Fail
N/A - no duchvork or no ductwork outsidn conditioned space Temperature of air through�F
' measurement toot
House conditioned Boor area ---_—Is(
Indicated now to Vclurretric now multiplier
5000', air temperature
1
r Maximum Allowed Duct Leakage Measured Duct Leakage
Test Parameter and Conditions
Normalized
Indicated Flow
volumetric
7TAbsolute
(CFfd2511(CFM25}
Leakage
(CFM25)
Flow
(CFM25 5000')
Measurement
Timing
qir Handler
Pass/Fail
Total leakage
Rough -in
Excluded
4
-
—`
Total leakage
Rough -in
Included
6
y '
❑
Total leakage
Complete
Included
123'
❑
A
Leakage to outdoors
Complete
included
NCrdlaNcal Sya+eM Panarmence Tas+ne Suhrrhtol Form V`202acea 2018
Filter type
Brand Type / style
Thickness inches MERV (optional) I
Static pressures (OPTIONAL)
Coding coil installed _ Y —N
Mode: _ Hosting
_ Cooling
Continuous Fan
Fan speed tap_
Humidifier bypass _ Open _Closed
All registers open
P=-
AP filter =
�`_` 1 — --
P=♦
P= «
LP AC coil =
i
_ AP Total ESP =
Cooling: Measured air flow through Indoor coil using flow grid ❑ WA —no AC system installed
>z
Design cooling airflow CFM 5000' 'target al;ilow limits (design 0- 15°A) to ^v— CFM 5000'
im, Measured airflow
.' Cooling ion speed hp Flow grid plate size
-� Temperature of
ore tnttoo�Indicated flow to Volumetric now multiplier
measurement too! F fdr 5000', air ;emperature
NSOP�_—Pa TFSOPrI Pa Flow Resistance Conxtirm FactorC��—t
Measured airflow, no odjuslments or correction I _.1 CFM Adjusted (indicated) airflow l ICFM
?� Volumetric flowCFM 5000, ❑ Pass
Heating: Gas manifold pressure
°F1 OF1Ji manifold pressure
r.. sspecification, 5000'- ,j ItWC Target manifold pressure limits {spe;.+! 5%)
� -.Z;o3- y IWC
Measured ma (..-� INC �-a
% ' t24.. Pass
Heating: Temperature rise
i OEM temperature rise Bin its
Measured :emperature rise
Return air : F Supply airJp
r :r
•i Temp rise J� - F [, Caution: Temp rise within
�- Pass t,[] Fall J 10 F of top of range
rAarJranirsi S)roma Pcdsrmonce taamO swminal F, V2e12e608 S•` 3 of
(This section under development, not yet being enforced)
Register air flows
Pill registers are cut through finish materials and moving air 94 pass i' Fail D�
(Remainder of section under development not yet being enforced)
Pressure balance
0
Pressure differeoce, limit. room -le -core
I .- -3 lio 11
tk, " I Pe
Room
Measured pressure
P ass
Fall
drop (Pa)
in q 4-e-,-
rig
pp
we
h-
Metmimical Systems Perfulmanvi Testing SUbinmis! For, V20120608 A of 6
WIN R-M!''i q; MIMI
NIA -- M natural draft combustion applianous Outdoor temparaturel� F
Worst -case depress urizatlo n testing
I House setup
1
Y.
# of bath fans on These doors are closed:
—Vented range hood on
Clothes dryer on
Air handler on
Other fans on
��q
I estedl appliances
Appliance
Type
Location
,CAZ pressure
BPI depressurization omit Pa wri outside
Measured net CAZ depressurization Pa cartcartoutside
OK (loss negative) I Cauticn (more negative)
BPI Maximum limit
Measured spillage duration
Pass = duration not exceeding limit
Draft, pressure
BPI limit
Measured
— Draft -hood
— I nduced-draft
Draft -hood
Indiced-draft
Draft -hood
Induced -draft
❑ OK 1,0'1 Caution
::IO�KE� Caution
[] OK Caution
seconds
60
seconds
0 1 Pass rail 0 1P.. -i Fail
Pe wit CAZ
Pa wn CAZ
Pass = pressure more negative then limit
CO concentration in undiluted flue gas
BPI maximum limit porn
Measured CO porn
Pass = CO level nal exceeding limit
Caution = CO level 25 to 100 ppm
�Pa Pass fFail
Pass
Fail
...... j...
i;all
Fail
Fail Fail
I �Parl �EV �Fwl =Pas51,1D
Caution
clutioe
Meen010ra1 SYMOMI Porflarn.nee Towula Submitral Fem V20120605 - Ufa
System controls operating per design intent
�j
S ntem
pass
— all
Local e�haust
_
Wholo-house ventiWirn
Sub -structural floor exhaust;
s fl
Heetino
Cooling��:j
Approved Agency (technician performing inspection and testing documented on this form)
Name(print)
Title
t. Ccm an
S P Y
Signature and Date„
6
HVAC contractor (F
.� Name (pint(
Title
. Company
Signature and Date
1.18 ncal symms Fffm Om 7estne Su0m11a1 Fm V=70608 00e