Re: Construction Materials Testing and Observation Services Report
Kaufman & Robinson Addition
1330 Blue Spruce
Fort Collins, Colorado J
Soilogic Project #13-2032 i G C 1 A
r -f- w2�� /
Mr. Burch:
o �
foun��� �oH
During the period November 20, 2013 through December 13, 2013, Soilogic Inc.
(Soilogic) provided construction materials testing and observation services for the
referenced project. Our services were provided on a part-time basis and included
structural steel observations;_ reinforcing- steel observations and the observation and
testing of cast in place concrete delivered to the site for placement.
During the referenced period, Soilogic subcontracted personnel completed structural steel
erection observations for the referenced project. A copy of the observation report is
attached. Based on the provided information, the structural steel erection observed for
the referenced project appears to have been completed in substantial compliance with the
project plans and specifications for those areas observed.
During the referenced period, a Soilogic field engineer observed the reinforcing steel
placed for the retaining wall for the site prior to concrete placement. At the time of our
observations, the- reinforcing- steel- observed' appeared to have been placed in general
accordance with the provided construction plans (TT) Structural Engineering, Inc., project
# 13-039, 7/9/2013).
During the referenced period, Soilogic personnel observed and tested cast -in -place
concrete delivered to the site for construction of the site retaining wall. The testing
completed in the field included slump, air content, unit weight, concrete temperature, and
Soilogic, Inc.
3050 67t' Avenue, Suite 200 • Greeley, CO 80634 • (970) 535-6144
P.O. Box 1121 . Hayden, CO 81639 • (970) 276-2087
KAUFMAN & ROBINSON
Fort Collins, Colorado
Soilogic Project #13-2032
Summary of Cast -In -Place Concrete Test
General
Set #
6
Application
Retaining Wait
Placement Date
12/13/13
Supplier
Aggregate Industries
Location
Retaining Wall
Mix Code
6406150
Placement Type
Chute
Ticket #
60319244
Batch Time
12:35 PM
Truck #
674
Sample Time
1:35 PM
Water Added On Site
None
Sampled At (yards)
0 of 0
Field Personnel
MJL
Project Specifications and Test Results
Test
Specifications
Results
Slump (in) ASTM C-143
Air Content (%) ASTM C-231
Unit Weight (pcf) Field
Concrete Temperature ASTM C-1064
Air Temperature @ Time of Placement
28-day Compressive Strength (min)
4" Max
61/4"
5%-7%
6.0*
-
139.0
90' Max
51 OF
-
45 OF
4000
See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Specimen
Age
(days)
Maximum Applied
Load (lbs)
Failure Type
Compressive Strength
(psi)
Rounded Avg.
(psi)
1.3a
4
-
Cone
-
1.3b
4
-
-
-
1.7a
7
37700
Cone
3000
1.7b
7
39180
Cone
3118
3060
1.14a
14
-
-
-
1.14b
14
-
-
-
1.28a
28
56620
Cone
4506
1.28b
28
49520
Cone
3941
4220
1.56a
56
-
-
-
1.56b
56
-
-
-
Specimen Diameter = 4 in Specimen Cross -Sectional Area = 12.57 sq in
*Contractor informed of high slump.
So'
LOGIC
e
v
SORLOGIC
November 13, 2013
Brinkman Construction
3003 East Harmony Road, Suite 300
Fort Collins, Colorado 80528
Attn: Mr. Andy Burch
Re: Construction Materials Testing and Observation Services Report
Kaufman & Robinson Addition
1330 Blue Spruce
Fort Collins, Colorado
Soilogic Project #13-2032
Mr. Burch:
During the period October 26 through November 8, 2013, Soilogic Inc. (Soilogic)
provided construction materials testing and observation services for the referenced
project. Our services were provided on a part-time basis and included the observation
and testing of cast in place- concrete delivered- to the- site for placement. Results of the
observation and testing services completed during the referenced period are included with
this report. Results of laboratory concrete compressive strength tests completed during
the referenced period are also included and will be provided as they become available.
During the referenced period, Soilogic personnel observed and tested cast -in -place
concrete delivered to the site for construction of interior- floor slabs. The testing
completed in the field included slump, air content, unit weight, concrete temperature, and
ambient air temperature at the time of placement. Test cylinders were molded from
representative samples of the plastic concrete for laboratory curing and compressive
strength testing. Results of the field and laboratory tests performed during the referenced
period are included with this report. Results of laboratory concrete compressive strength
tests completed during the referenced period are also included and will be provided as
they become available.
Soilogic, Inc.
4350 State Highway 66 a Longmont, CO 80504 • (970) 535-61"
P.O. Box 1121 • Hayden, CO 81639 • (970) 276-2087
Construction Materials Testing and Observation Services
Kaufman & Robinson (1330 Blue Spruce)
Fort Collins, Colorado
Soilogic # 13-2032
2
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc.
Jason Horner, E.I.
Project Engineer
Reviewed by:
Wolf von Carlowitz, P.E.
Principal Engineer
No Text
No Text
No Text
No Text
No Text
No Text
Construction Materials Testing and Observation Services
Kaufman&Robinson(I 330 Blue Spruce)
Fort Collins,Colorado
Soilogic# 13-2032
3
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the included information or if we can provide any additional
information that you may require, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
��G� P
: N• •
O�
v - ; �,•;
.
.,.,� ,v C
��. :���
coss'oN.. �N��
Jason Homer, E.I. Wolfvon Carlowitz, P.E.
Project Engineer Principal Engineer
Construction Materials Testing and Observation Services
Kaufman&Robinson(1330 Blue Spruce)
Fort Collins,Colorado
Soilogic# 13-2032
2
ambient air temperature at the time of placement. Test cylinders were molded from
representative samples of the plastic concrete for laboratory curing and compressive
strength testing. Results of the field and laboratory tests performed during the referenced
period are included with this report. Results of laboratory concrete compressive strength
tests completed during the referenced period are also included and will be provided as
they become available.
We appreciate the opporiunity to be of service.to you on this project. If you have any
questions conceming the enclosed information or if we can be of further assistance to you '
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
OREGjr
:' . cc
. .
• o •
. v
.. � N�
, �h� �•
� ���
�• \�
�`S+S:��N...•aC9
Jason Horner, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
KAUFMANN 8� ROBINSON
� Fort Collins, Colorado
Project# 13-2032
October 2013
Field Moisture/Density Testing Summary
�
m a _ o
Projec[ Date DaTy Depth Field Res�Ats � n m` m
� Material Tested and Location m m P a
Test Test Proctor Mdshae Dry � m a o (Pass/Fail)
Number Number ID Density � U Mdshue Campactian
1 10/10 1 '1' �qcfip-Footirg-3'N by 30'E of SV11 Comer A 18.9% 1042 247. 9696 F� Pazs
2 10/10 2 Grade pVpfex�}ipyga�id'�'Fpp�uy'14'N by 2 E of SW Corrwr A 7g1% 105.8 1.6% �96 Pass Pass
3 10I10 3 -1' pV��m�ayga�l-Footing-7 N by 17 W of SE Camer A 18.9% 105.4 2.4% 98% Pass Pass
4 10/11 7 Grade p�,��yyyry'«ygack(a-Foatirg-40'S by 12 W oF NE Camer A 16.19G 104.6 -0.4% 97% Pass Pass
5 10/11 2 -1' pv¢rexcava}ionlByGdii I-Foo4irrc�-17 S by 2 W oF NE Camer A 17.25: 1025 0.7% 95% Pass Pass
6 10111 3 -1' pv¢rexpvatiaJBadfiO-Footiru�-G S by S E of NW Comer A 16.3% 101.9 -02% 94% Pass Paa
ProctarlD: A B
Ma�dmum Dry Dersi[y(pc� 108.0 0.0
OpUmum MoisMe Carterrt(%) 76.5% 0.0% "
Moishae Conterp Req�ri2merLL -1 tn+3% SO�LOGIC
Compac0an RequQertieM 9a98% �
Procediae D-698 D-698
Kaufman 8� Robinson
Fort Collins, CO
13-2032
Summary of Cast-In-Place Concrete Test
General
Set# 1 Application Column Pads
Placement Date 10/18/13 Supplier Aggregate Industries
Location Fa.zs Mix Code 6406150
Placement Type Pump Ticket# 60317757
Batch Time 138 PM Truck# 621
Sample Time 2:30 PM Water Added On Site 5 Gallons
Sampled At(yards) 2 of 25 Field Personnel MJL
Project Spec�cations and Test Results
Test Specifications Results
Slump(in) ASTM C-143 5"Max 51/2'"`
Air Content(%) ASTM C-231 5%-7% 5.6
Unit Weight(pc� Field - 143.2
Concrete Temperature ASTM C-1064 90' Max 59"F
Air Temperature @ Time of Placement - 35"F
28-day Compressive SVength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 3 - - -
1.3b 3 - - -
1.7a 7 48750 Cone 3879
1.7b 7 47500 Cone 3780 3830
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 - - -
1.28b 28 - - - -
1.56a 56 - - -
1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
*Contractor informed of high slump.
SOYLOGIC
�
a(aufman � Robinson
Fort Collins, CO
')3-2032
Summary of Cast-In-Place Concrete Test
General
S@t# 2 ApPIICaUO►1 Column PadslFoundatiomWalls
Placement Date 10/23l13 Suppiier Aggregate Industries
LOC3tlOn NW Cmr Fnd Wall,30'E of N Wall AAIX COdB 6406150
Placement Type Pump Ticket# 60317832
Batch Time 6:48 AM Truck# 202
Sample Time 7:40 AM Water Added On Site 5 Gallons
Sampled At(yards) 2 of 33 Field Personnel MJL
Project Spec�cations and Test Resuits
Test Specifications Results.
Slump(in) ASTM C-143 5"Max 5"
Air Content(%) ASTM C-231 5%-7% 5.3
Unit Weight(pc� Field - 142.1
Concrete Temperature ASTM G1064 90' Max 5fi°F
Air Temperature @ Time of Placement - 48 "F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 3 - - -
1.3b 3 - - -
1.7a 7 46860 Cone 3729
3790
1.7b 7 48330 Cone/Split 3846
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 - - -
1.28b 28 - - -
1.56a 56 - - -
1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
50�LOGIC
a
�ov�ta�n te ?965 South tihoshooe St.
' �� tPr, F:n�kwood.('dnrado lNII 10
� � INSPECTION REPORT ��;j���
* , �* ta:3oa-�bt-o�;s
cOni a�
Page 1 of 2
Customer Soitopic Inc. Customer PO#
Job# Repori# 9 SpeciCode AWS D1.1 /RCSC
Date November 20. 2013. Day of Week WednesdaV
Hours of Shift 5:00 AM to 11:30 PM Total Hours Today 6.5
Mileage fo 72 Mileage From 72 Total Mileage �32 1 y
Operator Nathan Campbell Assistant none
Per Diem Yes No X Customer Representative
Soilogic tnc.
4350 Hwy 66
Longmont Co. 970-535-6144 �
Job site: Kaufman & Robinson Shop Addtion
Subcontractor: Brinkman Construction
1)Traveled to 1330 8lue Spruce Drive. Fort Collins Co, as requested.
2) Conducted visual inspection on the structural components.
3) Reviewed all inspection with Andy of Bnnkman Const.
4) See attched Structural Steel Erection Report and for additional /specific information.
ICC Special Inspector#8213444
��lf�Uw't'C�b�
AWS
QC t
Signature Nathan Cam bell CWI #07Q90131 q N AMPBELL
VT-1 Rev.B 11-1-2010 CWI Ofi90737
CWI
. �o�ntain�� �e;soo�n sn�eo�st.
Eagievcuod.Coloradu B(I110
w '�� STRUCTURAL STEEL ���j-���
�* , ( � ERECTION INSPECTION REPORT Fai303761-065R
�°�h ar
Page 2 ot 2
Customer Soiloaic Inc Customer PO#
JobiReport# Reaort# 1 SpeGCode AWS D1.1 /RCSC
Date November 20. 2013. Day of Week Wednesdav
Hours of Shift aa-1 AM to pq-1 AM Totai Hours Today pq-1
Mileage to aa-1 Mileage From pq-1 Total Mileage pq-1
Operator Nathan Campbell Assistant none
Per Oiem Yes No X Customer Representative
�tem Descriptian/Remarks Dis osition
Accept Reject O.D.
No. Y!N
1) Reviewed Welder Qualification Test Record (WQTR)for structural steel for
� Pro Steel welder Arturo Marquez. X
2) Reviewed Welding Procedure Specification(WP5), PSI 001. x
3) Conducted visual inspection on the frnai:wetd:pass;on;ttiefolfowing:sVuctural
components:
a) Reworked column base plates, foundation level 2 locations. Areas rejected for
undercut. 2ea
4) Conducted visual inspection-on-A325 High Strertgth-Bblted_connecUons:
except at pipe chase, and mezzanine-foundation thru roof level framing.
Numerous loose botts throughout, these areas were reworked and
reinspected. Wiih the exception of the solid bar diagonal bracing, pipe chase,
and meuaine, where work is incomplete at this time. x
The above items have been checked against erection or engineering drawings and are acceptable except where noted.
� All high strength fasteners were installed per applicable ASTM specification unless athervvise noted.
A1I welding was performed by qual�ed welders using acceptable procedures and electrodes unfess otherwise noted.
Welds inspecied by Visual and: Radiography Magnetic PaRicle Liquid Penetrant Uftrasonics
Under"Remarks° indicate the increment of inspection ie. Fit-up, Root pass, Intermediate layer(s)or Final Examination.
Mill test reports have been submitted. Yes No x Not Required 1?t
Items marked as rejected are to be corrected, replaced, or reworked, unless otherwise dispositioned by the engineer.
Repair must be approved by the Engineer Repair is when an item cannot be returned to engineering plan configuration.
`Repair items must be documented on an Outstanding Discrepancy form (O.D.)and the O.D. column marked"yes".
This report represents: Partial x ; Complete Inspectian of the fabrication for ihis project.
��IYn�t't_.(A�
AWS
{nspector Nathan Cam bell CWI #07090131 ��
(C W I 1 Q C-1} 07o9u131
VT-2 Rev B 11-1-2010
CWI
KAUFMAN & ROBINSON
Fort Collins, Colorado
Soilogic Project#13-2032
Summary of Cast-In-Place Concrete Test
General
Set# 1 Application Column Pads
Placement Date 10/18l13 Supplier Aggregate Industries
Location Faz5 Mix Code 6406150
Placement Type Pump Ticket# 60317757
Batch Time 1:38 PM Truck# 621
Sample Time 230 PM Water Added On Site 5 Gallons
Sampled At(yards) 2 of 25 Field Personnel MJL
Project Speciflcations and Test Results
Test Specifications Results
Slump(in) ASTM C-143 5"Max 51/2"*
Air Content(%) ASTM C-231 5%-7% 5.6
Unit Weight(pc� Field - 143.2
Concrete Temperature ASTM C-1064 90' Max 59'F
Air Temperature @ Time of Placement - 35°F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load(Ibs) Failure Type (psi) (psi)
1.3a 3 - - -
1.3b 3 - - -
1.7a 7 48750 Cone 3879
3830
1.7b 7 47500 Cone 3780
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 69570 Cone 5536 �80
1.28b 28 68080 Cone 5418
1.56a 56 - - -
1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
*Contractor informed of high slump.
SO�LOGIC
KAUFMAN 8� ROBINSON
Fort Collins, Colorado
Soilogic Project#13-2032
Summary of Cast-In-Place Concrete Test
General
S6t# 2 APPIICetiO� Column Pads/Foundation Walls
Placement Date 10/23/13 Supplier Aggregate Industries
LOCatlOfl NW Cmr Fnd Wall,30'E of N Wall MIX COd2 6406150
Placement Type Pump Ticket# 60317832
Batch Time 6:48 AM Truck# 202
Sample Time 7:40 AM Water Added On Site 5 Gallons
Sampled At(yards) 2 of 33 Field Personnel MJ�
Project Specifications and Test Results
Test Spec�cations Results
Slump(in) ASTM G143 5"Max 5"
Air Content(%) ASTM C-231 5%-7% 5.3
Unit Weight(pc� Field - 142.1
Concrete Temperature ASTM C-1064 90' Max 56`F
Air Temperature @ Time of Placement - 48°F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 3 - - -
1.3b 3 - - -
1.7a 7 46860 - Cone 3729
3790
1.7b 7 48330 Cone/Split 3846
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 65450 Cone 5208
1.28b 28 65840 Cone 5239 5220
1.56a 56 - - -
- 1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
g
50�LOGIC
KAUFMAN 8� ROBINSON
Fort Collins, Colorado
Soilogic Project#13-2032
Summary of Cast-In-Place Concrete Test
General
Set# 3 Application IMerior Floor Slab
Placement Date 11/7/13 Supplier Aggregate Industries
Location �a'N by 8�w ot sE comer Mix Code 6401103
Placement Type Pump Ticket# 60318397
Batch Time 6:24 AM Truck# 640
Sample Time 7:10 AM Water Added On Site 15 Gallons
Sampled At(yards) 2 of 110 Field Personnel MJL
Project Specrtcations and Test Results
Test Spec�cations Results
Slump(in) ASTM C-143 4"Ma�c 3 1/2'
Air Content(%) ASTM C-231 1%-3% 2.5
Unit Weight(pc� Field - 143.4
Concrete Temperature ASTM C-1064 90' Max 58'F
Air Temperature @ Time of Placement - 30"F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 4 54460 Cone 4334
1.3b 4 _ _ _ 4330
1.7a 7 61110 Cone 4863
4900
1.7b 7 61970 Cone 4931
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 78120 Cone 6217
1.28b 28 75400 Cone 6000 6110
1.56a 56 - - -
1.S6b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
SO�LOGIC
�
KAUFMAN 8� ROBINSON
fort Collins, Colorado
Soilogic Project#13-2032
Summary of Cast-In-Place Concrete Test
General
Set# 4 Application Interior Floor Slab
Placement Date 11/7/13 Supplier Aggregate Industries
Location ss'N by 30'E of SW Comer Mix Code 6401103
Placement Type Pump Ticket# 60318408
Batch Time 8:05 AM Truck# 430
Sample Time 8:45 AM Water Added On Site 6 Gallons
Sampled At(yards) 65 of 110 Field Personnel MJL
Project Spec�cations and Test Results
Test Specifica6ons Results
Slump(in) ASTM C-143 4"Max 61/2"*
Air Content(%) ASTM C-231 1%-3% 1.6
Unit Weight(pc� Field - 144.2
Concrete Temperature ASTM G1064 90' Max 58"F
Air Temperature @ Time of Placement - 30"F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 4 54700 Cone 4353
4350
1.3b 4 - - -
1.7a 7 63400 Cone/Shear 5045
4990
1.7b 7 62120 Cone 4943
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 71520 Cone 5691
1.28b 28 73700 Cone 5865 5780
1.56a 56 - - -
1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
*Contractor informed of high slump.
0
50�LOGIC
�(AUFMAN 8� ROBINSON
Fort Collins, Colorado
Soilogic Project#13-2032
Summary of Cast-In-Place Concrete Test
General
`
S2t# 5 Application Retaing Wall Footing
Placement Date 12/11/13 Supplier Aggregate Industries
LOC2t10� 30'S by 10'E of NE Comer MIX COdO 6406150
Placement Type Chute Ticket# 60319155
Batch Time 1:21 PM Truck# 430
Sample Time 2:15 PM Water Added On Site None
Sampled At(yards) 3 of 22 Field Personnel MJL
Project Specifications and Test Results
Test Specfications Results
Slump(in) ASTM C-143 4'Max 6 3/4"'
Air Content(%) ASTM C-231 5%-7% 7.5'
Unit Weight(pc� Field - 139.6
Concrete Temperature ASTM C-1064 90' Max 58 "F
Air Temperature @ Time of Placement - 30 °F
28-day Compressive Strength (min) 4000 See Below
Compressive Strength Test Results (ASTM C-39/C-31)
Age Maximum Applied Compressive Strength Rounded Avg.
Specimen (days) Load (Ibs) Failure Type (psi) (psi)
1.3a 4 - Cone -
1.3b 4 - - -
1.7a 7 38320 Cone 3049
3110
1.7b 7 39900 Cone 3175
1.14a 14 - - -
1.14b 14 - - -
1.28a 28 55640 Cone 4d28
1.28b 28 58200 Cone 4631 4530
1.S6a 56 - - -
1.56b 56 - - -
Specimen Diameter=4 in Specimen Cross-Sectional Area= 12.57 sq in
*Contractor informed of high slump and high air content.
SO�LOGIC