HomeMy WebLinkAbout2238 Milton Ln - Disclosures/Mechanical - 12/07/2013City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form Is a record of testing targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured valueAto,
-
Target or limit
compare with tar
Pass
` Fait=;
' Caution
Other data
Address 2238 Milton
Builde
HVAC contractoi IMS Heating
Bath exhaust
Testing date(s)
Airflow measurement metho
f-PIQw box.
_ Flow collar
Passive flow hood
_ Pitot tube traverse
I
Temperature of air throug
-
66
F
Indicated flow to Volumetric flow multipli
measurementtoo
t
�5000', air temperature
Measured Exhaust Airflow
Operation
Minimum
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Flow
_ Volumetric Flow
Continuous
Requirement
(CFM)
(CFM 5,000')
passFall
(CFM 5000')
master Bath
termlt _ Contin`
,_
cf
...
7
`:. .,.
84.546
.
U.L. Bath
tertnit — cemm
�50 cfm
78
n
— Intermit
— Contin
'.Intermit
_ Contin
_intermit
- Contin
.Intermit
Contin
intermit
Contin
Intermit
_ Contin
■
■
■
Kitchen exhaust
Oven fuel — Gas
-WJectdc
Exhaust airflow Minimum exhaust airflow requirementCFM 5000.
Operation _ Intermittent — Continuous
Measured airflow
Airflow measurement method —Flow box. Flow collar
Passive flow. hood Pitot tube traverse
Temperature of air through Indicated flow to Volumetric flow multiplier
measurementtool ` F
' @ 5000', air temperature
Indicated flow FM Volumetric flowCFM 5000' y 0 ! Pass 0 Fall
_l
Testing notes (fan speed, masking - -"
flow out of range....
Mechanical Systems Performance Testing Submittal FOMV20120321
1 Of
other than sub -structural floor exhaust
n exhaust airflow requirement 59 JCFM 5000'
Indicated to
Volumetric
Design Airflow Measurement Measurement Location + Flow
(CFM 5000') Method I Air Temperature (F) Multiplier
Measured Airflow
Indicated Flow Volumetric
(CFM) ^'Flow ^ Pass/Fall
low box.
_
Total exhaust airflow Passive flow hood
_ Flow collar : -
Pitot tube traverse Bath Grill 1.098 178 85.644
Flow collar 3
Total supply airflow
_ Pitot tube traverse
• - _Flow box ,x�.,
_ Passive flow hood - Q°: 0:.
For systems In which supply airflow is circulatedybthe air handler fan, fan speed for measuremen Heat _ Cooling : Continuous fan,,
(Balanced airflow in balanced systems
-�--*-
Average of measured suppl Target flow rang,. `
and exhaust flo CFM 5000' (average +/. 16% to CFM 5000'
�r, evi �
❑ 'Pass ,.j. Fall
Sub -structural floor exhaust
Design airflow w CFM 5000-
Measured airflow
.L-„ Airflow measurement metho —Flow box Flow collar
_ Passive flow hood _ Pitot tube traverse.
.n
Temperature of air through F Indicated flow to Volumetric flow multiplier Q
a measurement tool @ 5000', air temperature
I
Indicated flow CFM Volumetric flow - , s - CFM 5000' O'.'Pass Fail
i19
Temperature of air throug
F Indicated flow to Volumetric flow multiplier
, measurement too
@ 5000% air temperature
House conditioned floor area
sf'N 1 �
VL
3
Maximum Allowed Duct Leakage Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
Absolute
Indicated Flow
Volumetric
Leakage
Flow
Measurement
Timing
Air Handier
(CFM25 / 100 sf)
(CFM25)
(CFM25)
(CFM25 5000')
Pass/Fail
Total leakage
Rough -in
Excluded
4
Ela'C
Total leakage
Rough -in
Included
6
....0
Total leakage
Complete
Included
12
Z
Leakage to outdoorsC
mplete
Included
$
-
C'E",
Mechanical Systems Performance Testing SubmittskFo V20120021 _ 2 of 6
Filter type
Ed Bran S1CUlt1P
pressures (OPTIONAL)
Mode: Heating
(Cooling
_ Continuous Fan
Fan speed tap
Humidifier bypass _ Open
All registers open
_ Zone dampers open
hP filter =
Type I styl Ds osable Thlcknes 3 Inches MERV (optional)
Measured air flow throu h indoor coil
cooling alrflo 1320 CFM 5000'
ad airflow
P=+
OP AC coil =
P=+
_ aP Total ESP =
r = .
usirg flow grid
Target airflow limits (design +/_ 75%) ri1122 °", �� to CFM s Qaa • °�x CFM 5000'
Cooling fan speed tap High
Temperature of air throug
measurement too 67 F
(�yrp�y/lII NSOP 32 , , Pa TFSOP 33 Pa
i Measured airflow, no adjustments or correction
J CFM
Volumetric flo 1-328:58_' CFM 5000' 5...__ ,�„ JPass
Heating: Gas manifold pressure
Flow grid plate siz 14 _ 20
Indicated flow to Volumetric flow multipli r1.098 , @ 5000', air temperature
Flow Resistance Correction Factoil DIG 700
Adjusted (indicated) airflo �CFM
q'q+.❑ "��" Fail
OEM manifold pressu IWC Target manifold l
specification, 5000133.3 r9 pressure limits (spec +/. 5%) I5 to IWC
Measured manifold presaur 3,[1 - IWC "'6A ,. Pass ,� � 91, Fail
Heating: Temperature rise
IOEM temperature rise Iimi %-\ D to F
,Measured temperature rise
Return air C9 F Supply air 121 - F
' Caution: Temp rise within
Temp rise 52 ° F Pass' Fail ❑>�
^�_;:10 F of top of range
Mechanical Systems Performance Testing SubmitWFo V20120321 3 of 6
(This section under development, not yet being enforced)
Supply air flows (This section underdevelopment, not yet being enforced)
Pressure balance
51Pressure difference limit, room4ocore -31to +3 Pa
Room
Measured pressure
drop (Pa)
Pass
Fail
Mechanical Systems Performance Testing SubmitteW, V20120321 4 of 6
Outdoor temperature
Worst -case depressurization testing
House setup
_ # of bath fans on These doorsare closed:
_ Vented rangehood on -
Clothesdryeron -•
Air handler on
Other fans on - -
appliances
pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressudzationPa wrt outside
OK (less negative) ( Caution (more negative)
BPI maximum limit
seconds
Measured spillage duration
seconds
Pass - duration not exceeding limit
ft pressure
BPI limit
Pa wrt CAZ
Measured
Pa wrt CAZ
Pass = pressure more negative than limit
concentration In undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass - CO level not exceeding limit
Caution = CO level 25 to 100 ppm
Draft -hood Draft -hood ;: - Draft -hood
Induced -draft Induced -draft induced -draft
❑ OK I ❑Cautlon ❑ K I yam on ❑ K I ❑ Caution
60,
,
11
Pass
I ❑,
ail
❑,.
Pass
II
;,❑
IPass,
❑, an
`100,
a 100 `.:
s
a 100 •
❑
Pass
I ❑. ail
❑
ass
❑ ail
❑
Cautlon
HPassII
Caution
'❑
aution
Mechanical Systems Performance Testing Submltt*Fo V20120321 5 of 6
System controls operating per design Intent
Approved Agency
Name (print)
iTitle
Company
Signature and Date
HVAC contractor
Name (print)
Title
Company
, jSlgnature and Date
Localexhaust
❑
Whole -house ventilation
�,
❑ "
Sub -structural floor exhaust
❑ _
❑
Heating
Cooling
❑__❑�
ecnrnaan performing inspection ad testing documented on this form
Paul Higman
Energy Rater
)rt Collins license holder
Dwayne Shawver
Owner
IMS Heating& Air, Inc.
uwayneby Dwayne
ShaWVe"`7\.,,.,...
2013:12f] 0
08:58:32-07'00'
G
Mechanical Systems Performance Testing SubmittakFo V20120321 6 of 6