Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency;' and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measuredvalue to
Target or limit •
compare with target o
'; Pass
y Fail
Caution
Other data
Address N N :Thoreau Dr
I
Builder H
HVAC contractor
Temperature of air throug 68 F
measurement too
Kitchen exhaust
Ovenfuel —Gas:
JgUectri
Testing date(s)l 11 /09/201:
Indicated flow to Volumetric flow multipli rl .(79g
@ 5000', air temperature
Exhaust airflow Minimum exhaust airflow requirementCFM 6000'
Operation ' - Intermittent, Continuous
:sting notes (fan speed, maskim
flow out of range....
Mechanical Systems Performance Testing Submittal FornV20120321 1 of 6
other than sub -structural floor exhaust
n exhaust airflow requirement 59 FM 5000'
Design Airflow
Measurement
Measurement Location +
(CFM 5000')
Method
Air Temperature (F)
...
lowbox
Passive flow hood
Total exhaust airflow
Flow collar
Pitot tube traverse
Bathad
_ Flow collar
Pilot tube traverse
Total supply airflow
_
Flow box
Passive flow hood
ndicated to
Measured Airflow
Volumetric
Volumetric
Flow
Indicated Flow
Flow
Multiplier
(CFM)
(CFM 5000'1
1098
67
73.566:
�
r
Pass/Fail
systems in which supply airflow is circulated ttthe air handler fan, fan speed for measuremen Heat, Cooling Continuous fan
danced airflow in balanced systems
Average of measured suppl Target flow rang
k
CFM 6000' to CFM 6000'
and exhaust flow (average +/-15%),;�
❑ ..._. Pass Fail
Sub -structural floor exhaust
Design airflow
;Measured airflow
..�. CFM 6000'
Temperature of air throug F Indicated flow to Volumetric flow multiplier
measurement too @ 6000', air temperature
House conditioned floor area
`
Isf A lk ` G
��
�" n �
`Y\-
Maximum Allowed Duct Leakage
Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
Absolute
Indicated Flow
Volumetric
Leakage
Flow
Measurement
Timing
Air Handler
(CFM26 1100 sf)
(CFM25)
(CFM25)
(CFM25 5000')
Pass/Fail
d leakage
Rough -in
Excluded
4
�z,:
❑
,
d leakage
Rough -in
Included
6
jr,
d leakage
Complete
Included
12
Syr
❑ <
C
kaye to outdoorsC
mplete
Included
8ro
;
❑ .
'C
Mechanical Systems Performance Testing Submittsifo V20120321 2 of 6
Filter type
Brand skuttle
Static pressures (OPTIONAL)
Mode: Heating
Cooling
Continuous Fan
Fan speed tap
Humidifier bypass _ Open _Closed -
All registers open
_ Zone dampers open
P, �
AP fliter =
Type / sty[ ,D1Sp0$1b)e Thicknes 3�� inches MERV (optional)
P=-
■ L1P Total ESP =
Cooling: Measured air flow through indoor coil usirg flow grid
Design cooling airno 1.320' CFM 5000' Target airflow limit; (design +/_ 15%) 22 k ' ,.tolS— "CFM 5000'
Heating: Gas manifold pressure
00EM manifold pressur IWC Target manifold pressure limits (spec +/- b°/) to IWC
specification, 5003.3 .,•
Measured manifold pressur 3' 32 11wc Pass Fail
KMJ
Heating: Temperature rise
OEM temperature rise limi \ fo r F
Measured temperature rise
Return air C9 F Supply air ] 2`l F
- >: Caution T
Temp rise 52 F Pass Fail Y ❑ Temp rise within
ry 10 F of top of range
(This section under development, not yet being enforced)
Supply air flows (This section underdevelopment not yet being enforced)
ure balance
isure difference limit, room -to -core ,3 t0 +3Pa
Room Measured pressure Pass Fail
drop (Pa)
master
Bedroom
Bedroom 2 Middle
+27����`;
Bedroom 3 Front • „
'
��',�,
=0.2
❑ram
,
", �S •
hr, ❑
❑
E
Or��
"
f
_
'lam >
_ ❑ -
❑ 4� ,
EMU 12
�'.i1
iaEE
Mechanical Systems Performance Testing Submittalfo V20120321 4 of 6
Outdoor temperature F
Worst -case depressurization testing
,,`;House setup
appliances
:pressure
BPI depressurization limit
Pa wrt outside
Measured net CAZ depressurizationPa wrt outside
OK (less negative) I Caution (more negative)
BPI maximum limit
Measured spillage duration
Pass = duration not exceeding limit
ft pressure
seconds
seconds
BPI limit
Pa Wrt CAZ
Measured
Pa wrt CAZ
Pass = pressure more negative than limit
concentration in undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
Draft -hood Draft -hood Draft -hood
Induced -draft:! Induced -draft induced -draft
Ert.
ti K �
JD
OK
❑;,
Caution
❑,
K
on
❑"
K
0',
Caution
❑,
Pass
❑' ail
El !,
Pass
II
�. ❑ ass
❑ all
IVE
Pass
ail*
"❑;
Pass
it
❑
ass
Q! all
PassTe,
ail
]
Pass
' it
❑,:, ass
0' ail
❑:
aution
❑
Caution
❑_ aution
Mechanical Systems Performance Testing Submittr*Fo V20120321 6 of 6