HomeMy WebLinkAbout926 Ridge Runner Dr - Disclosures/Mechanical - 10/02/2013City of Fort Collins
Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, Yitn Pass/Fail outcomes, For information on measurement tools end testing techniques, we the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may, be periodically updated: check the Building Services web Site for the current version.
This form must be completed and signed by an "Approved Agency." and submitted to Building Services as a requirement for recervIng a C.O.
Color key
Measured value to,i
comp" with target or
pass
IN
'14"Fe:
Other data
Both exhaust
,I]Flow box Flow co l8f
measurement method
Passive flow hood Pilot tube inverse
Nrflow v
Pilot l2oh0811-a—lelac
Temperature of air through indicated flow to Vulunictr c flow MU
measurement toot F TD SOUCY, a:?lempPr t
'X
Measured Exhaust Anflow
Operation
Minimum
Design
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Requirement
Airflow
(CFM
Flow
Volumetric Flow
(CFM 5,00')
Pass
Fail
Continuous
(CFNI 5000')
5000')
(CFMI
YIntemrs! Contin
-&Intermit Con In
M ks�- ee
_&ntenrif _Can in
51,
Q%k,
01 4e,
intermitcritin
I
,v
'A tt
Intermit Contra
"A'
Intermit Conlin
intermit Conlin
Intermit —Conlin
Kitchen exhaust
Oven futtl
Exhaust airflow
Operation irtemittent Continuous,
M� NIA - Kitchen hood does not vont outside
Minimum Oxnaust Airflow rbnUrreW6raF-7---7---' -'7CFM50oV
Measured willow
Airflow measurement methodi —Flow box Flow mliar
Passive flow hoad Not Woo traverse
indicated liow to Volumesic filovi mullipile Temperature of air through F
measurement tool 500U, sit to
Indicated flow CFM Volumetric flow SCFM 5000' pa"
Testing notes (fan speed. masking,
flow out of range,
Wixsar,loot Syssinrs Perfo.miame Ttstmij SublinriUl Fa-rs V20=Aaa 1 rle
11
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement '-� rr r J_ CFM SOOTY
r3 �}.
Indicated to
Measured Airflow
'
{{
Volumetric
Design Airflow i Measuramentt Measurement Location *
Flow
Indicated Flow
Volumetric
.(CFM 5000') Method } Air Tam aratura F
P O
Multiplier
(CFM)
)
Flow
r Pass/Fail
(CFM 50001
YY�
xr-low hex
t , U tN/Gt �-
t'
..
...
���.
? - Total exhaust airflow
� ,
— Pa951vB flow hood
collar
'^7
•
� :
an
_.Flow
Pilot tube tmvorse
r
_Flow collar.
._
(, -7
s Total suppiy airflow
��
_ Pilot tube traverse
❑`
Flow box
(
—_ Passive flaw hood
For systems in which suppiy airflow is circulated by the air handier fan, fan speed for measurement —Heat Cooling Continuous tan
A; Balanced airflow in balanced systems
.a Average of measured supp''y Target flow range "ems
and exhaust flowsCF11A5000' (average I15°5):r_', r. to `; CFM 5000'
PASS
Sub -structural floor exhaust ( NIA- no sub -structural nocr exhaust system
A Design airflow, cr-M song•
I ;r Measured airflow
—Flow. box —_Flow collar
` - Airticw measurement method l--P—assive flow ho-odd-� Not tuba traverse
7emperemeature u air measurement
thrtoo!
F Indicated flrnv to Volumetric flow rnuitip!iar�
measurement tcc. @ 5000% air tempamture
Indicated flow CFM Volumetricnow r
CFM �000' (�- Pas 't.J Fail
NIP. -- no duchvork or no ductwork outsideoamdltioned space
House conditioned floor areaat
Temperature of air through r
meaailroment tool
Indicated now to Volumetricrow multiplier.
@ 5000',air temperature
Maximum Allowed Duct Leakage
Measured Duct Leakage i
f-_
Test Parameter and Conditions
Normalized Leakage
g
Abeolute
Leakage
Indicated Fiow
-
Volumetric
Flow '
n
Measure mant
Timing
Air Handler
(CFM25 i 100 all
(CFM25)
(CFM25)
(CFM25 5000) Pass/Fail
;".
To
Rough-in
�Exdudeo
q
I-�
�
_
k
.
Total'eakage
Rough -in
included
Total leakage
Complete
1!!ciuded
12
'? { J.-^_,
-'�
Leakage to outdoors
Complete
Included
&
�.'�
❑ Gv.
Wi h,tnir) systems Parlomanw lent»a suhmktal Fcnn 1410120e 8 2 tl, 6
Filter type
i Grand (� ` V Type Ystylo P) .(.. Thickness�t linches MERV(optional)i
Static pressures (OPTIONAL)
ms
Cooling coil installed _ Y _ N
,i
� a Mode: _Heating
_Cooling
Continuous Fan
Fan speed tap
i
Humidifier bypass Open _Closed
_ All registers open
yd
i P=
AP filter =
.,k
il?rz
Z-.
P = Y ��
P=+
P=i
�l
dP AC coil =
Cooling: Measured air flow through Indoor coil using flow grid
( N)A- no AC system installer
Design cooling airflow
CFPA 5000'
Target airflow limits
(design +i 15°h)
to
CFM 5000'
Measured airflow
4
s Cooling ton speed top—�—,
Flow grid plate size
Temperature o`: air through
1F
InniCated flow to Vvl t multiplier�
mea
- measurement tool
_. JI
1)00' r to
�q SWO', air temperature
NSOP= Pa
TFSOP[ Pa
Flmv Resistance Correction Factor--•-1
Measured airflow, no adjustments or correct
�CFM
Adjusted (indicated) airflau CFM
} Volumetric flow 5000'
❑ Pass
i;�t Fail
J,
Heating: Gas manifold pressure
OEM manifold pressure
'S
-
;', specification, 5000'
3
IWC Target manifold pressure Lmfts (spec tl• 5%)
�� Zm .IWC
- Measured manifold pressure IWC
Pass t�.❑ «,,,et�,Fail
,�t
Heating: Temperature rise
OEM :emperture rise limits
+(� fo .:��`>`F
`Measured temperature rise
>``'• Return air
f.=qf
F
Supply air
(,r jF .
t Tamrise/
F
Caution: Temp rise within
{ 10 F of tap at range
Vn nlcml Systems Penermanca Tnw,p suemet9l =am
V2012e608
a m a
(This section under development, not yet being enforced)
Register air flows
All registers are cut throughfinish materials and air
(Remainder of section under development, not yet being enforced)
Pressure balance
`' Pressure difference limit. room-to-cofe to +3- ""° Pa
n�
Pass ', t:7 a Fail
Room
Measured pressure
Pass
Fail
drop (Pa)
rn�s+w
n t
y
B i
t.(�
9
'
;tee
❑
f
n
C'LIT
Mx t
r
❑
rs.z;
h
Cljj4 �' Y !T
Metl�arua! iyS10411 neaformanw Tew.ne subwho Form V2012000e 4 orS
,N NIA - natural draft comoustion app rams
Worst -case depressurization testing
Housa setup
i
( 1
1:
p1r
)
Outdoor temperature F
_ # of both fans on These 8adrs are closed: —Vented range hood on —Clothes dryer on -
Air handler on - -
Other fans. on
I
fiA
Tested appliances
Appliance
(
i
.1.
Type
Location
CAZ pressure
BPI depressurization limit
Pa wn outside
Measured net CAZ depressurization
Pa wrt outside
;i
OK (less negative) I Caution imore negative)
I , o.Spillage
{.Att
P?
BPI maximum limit
seconds
Measured spillage duration
seconds
i
-
Piss = duration not exceeding limit
Draf: pressure'i
BPI limit
Pa wn CAZ
Measured
Pa wn CAZ
Pass - pressure more negative than limit
-'
CO concentration in undiluted Sue gas
BPI maximum limit
pom
'-'
Measured CO
pom
Pass - CO level not exceeding limit
Caution = CO level 25 to 100 ppm
_ Drak-hood
Induced-drok
Draft-t»cd
Induced -draft
_ Drak-hood
Induoed-draft
epee
;w •r= _.,
" "Tip=,
Q OK 1 Q'
Caution
Q OK I Qy Caufan
.Q. 10K [n]Caution
❑-
Pas 3Q} Foil
Fab
Q Pas., yQ}
Pail
❑ -FP;SS
sQ!
Foil
Q
Pass
3Qf
Foil
Q
PasB
;Q
Fair
Q Pass
`QI
Fail
Pass -EJ
Fail
Q
Pass
iQr
Fail
Q ' Caution
Q.
Caution
Q:.
Caution
W hanrcN Stotems Podarmenee Testing S�bm&le: Fern V2020 $0a 6 ore
System ou-91rols operating per design intent
5ystom
Pass
—yet,—
Local exhaust
TZF% --I.
Ifibota-house venNiaticr,
IBM
Sub -structural Hour exhaust
Healing
VV-
Cooling
Approved Agency (technician Performing inspection and testing documented on this form)
Name (print) I 13Gr tic, r-,, A qr-c!
Title 'Te ch
S 14c
Girmature and Daw
HVAC contractor (F
Name (poet)
Company
Slqnaturo and Dale
v2r.r2wh act C,