Loading...
HomeMy WebLinkAbout5115 Cinquefoil Ln - Disclosures/Mechanical - 11/05/2013City of. Fort Collins Residential Mechanical Systems: Performance Report This form isa record of testing targets and results,.with Pass/Fail outcomes. For information on measurement tools and testing techniques,. see the "Residential New Construction Mechanical Systems Testing^Guide." The guide and this form. maybe periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an "Approved. Agency," and. submitted to Building Services as a requirement for receiving'a CD. xrag-m. Ma A7teasurei aitfe�t0 Color key Ga vyith �ifiQt Pass y ft 43t,, data �, B HVACcont Bath exhaust - �i ix fez ft `may 4w`'",y-"" .s Airflow:measurement method �� Temperature of air through '' k- R�y m ^�" Indicated flow to Volumetric flow miiltipDe ', t . * F measurement tool 3�ri„`may @ 5000'; yr temperature r" , g t �, ski M Measured Exhaust Airflow. Minimum Design Indicated Exhaust, Pickup Location Intermittent or Airflow Airflow Flow Volumetric Flow Pass Fail :Continuous Requirement (CFM -(CFM 5,000) . .... (CFM) <. (CFM 5000, Kitchen exhaust aes rf x Oven fuel Elec(nc .atir t, WA -.Kitchen hood does not vent outside Exhaust.aidlow Operation�``"�'� Minimum exhaust airflow requirement :#r`� r:drt" CFM 5000' 1..'. 41, Measured airflow Airflow measurement method �t�ssiVe�flou�.l?9rxk f�[tQt tuk��yers� Temperature of air through measurement tool Indicated flow to Volumetric flow multiplier F@ 50001, air temperature ; Indicated flow m CFM Volumetric flow :' a CFM 5000 R` `Pass Fail . r+ Testing notes (fan speed, masking t h flow out of range... ) .. ... .... ' Mechanical Systems Performance Testing Submittal Form V20120608 i of a Systems other than. sub -structural floor. exhaust Minimumexhaust airflow requirement v CFM 500V Indicated to Measured' Airflow Volumetric Volumetric Design Airflow Measurement Measurement Location + Flow Indicated Flow' . (CFM. 50001 Method Air Temperature (F) Multiplier (CFM) Flow Pass/Fail .. (CFM 50001 ' LQYKb@K Total exhaust airflows Y 1 € r+; jltrayer�e f r { t Total supply airflow , r v x s >' u r Fx sisFeIdwitlrOadY r a , h r systems in which supply airflow is circulated by the air handler fan, fan speed for measurement Balanced airflow in balanced systems Average of measured suppl`�x 4 _ l Target: flow range CFM5000; CFM5000' and exhaust flows 111 . y '; h (average+/-.15'k) ��a �W w r Pass Fail xu„ tea''. Sub -structural floor exhaust WA — no sub -structural floor exhaust system Design airflow CFM 5000' Measured airflow > 1t4G4y Q1N" Airflow measurement method '�-y"y1te6d, pip Temperature of air. through s °{;i' Indicated flow to' Volumetric flow multiplie measurement tool b Tur F �. 5000', air temperature Indicated flow g� CFM Volumetric flow `q CFM 5000 - - ti Pass Fail UD Heating4. + Cooling Duct Leakage +z [ NtA no space_ Temperature of air through ' no ductwork or ductwork outside conditioned measuret tool men F f.. a House conditioned floor area zkr ; Indicated flow to Volumet[i0 flow Multiplier sf } ," 5600% alr temperature Maximum Allowed Duct Leakage Measured Duct Leakage Absolute Volumetric Test Parameter and Conditions Normalized Leakage (CFM25 / 100 90 Leakage (CMS) indicated Flow (CFM25) Flow. (CFM25 5000') Measurement Timing Air Handler Pass/Fall Total leakage 9 Rough -in Excluded 4 e P .0 Total leakage Rough in Included 6 , v M >r Total leakage Complete Included 12 . i t r r K m Leakage to outdoors eakag,;.; Complete Included 8 77 ... C, , Mechanical Systems Performance Testing Submittal Form V20120608 2 of 6 Filter type Brand , ;+ -: Static pressures (OPTIONAL) Type style Thickness inches MERV,(optional) Cooling coil installed _ Y ; N Mode: _ Heating _ Cooling P + _ Continuous Fan Fan speed tap \ Humidifier bypass _ Open _eased ; AP AG colt All,registers open P=-. V AP filter =x r„ ... P =; AP Tofa1. ESP = . Goolin Measured air flow throu h,indoor coil.using flow g rid, NA - no AC system: instaled Design cooling airflow i ' CFM 5000 Target airflow limits (design +/-1.53'°) � s CFM 5000' Measured. airflow s Cooling fpeedtap - - mg � . size' plae Ffogrid Temperature of air throttgtt �s d F Indicated flow to Volumetric flow multipUe lig 1 r�M measurement toot „ .r @ 5000', air temperatu; NSOPF. Pa TFSOP Pa. Flow Resistance Correction Factor ,--,,`-, ^: Measured airflow, no adjustments or correction r CFM 4"W Adjusted (indicated) airflow ., � k CFM, . .:-" Volumetric flow { , "x, j FM'5000' ' + +y PassElm .. . . Fail Heating: Gas manifold pressure OEM manifold pressure ' specification. 5000 r WC Target manifold pressure limits (spec +/ 5%) m IWC' Measured manifold pressure IWC � y , ;Pass Fail Heating: Temperature rise OEM temperature rise limits Measured:temperature rise Retum air F -Supply air (l F , Temp rise F .. Pass Fail . Caution:.Temp rise within 10 F of top of range Mechanical Systems Periormance Testing Submittal Form V20120608 3 of B II (This section under development, not yet being enforced) 17. Room Register air flows -- ; All registers are cut.through finish materials and moving air 5 ;; Pass Fail. (Remainder of section under development,. not yet being enforced) Pressure balance Pressure difference limit, room -to core Pa Measured pressure Room. Pass ., Fail drop (Pa) = B � y ,�.., �l yyy� � v-t �--r3.- �, x •.......i, _. ..,. ... _.'f�:... ... .. .,., i..... .� ,'. . � . .^. `.: � ., .. ..a... L n._..... ..: .xi1. � J. wY " � 1 M1�4Y. Y!�+gib S 1 " � Mechanical Systems Performance Testing Submittal Form V20120606 4 of 6 Tested aonliances y; -: Y iltkr -. TC A �e`�a1�vy]n�r{{�I.i3'rA7 ' '.,h.y'S 4 I' b. �C • = .:� "y,ReE M Sa tt i ,f �.: • ✓1 3�Yetn1 V vY.� M +;fA y�W. O F �,,.,.4:....a."r:.:..3^��kfa�..�::�•5. _..51 »��Nt>,.0 �i :..uX:. - .. • F.:I .v kY., v...^... ,_'.,:��vc.,w..�,-,g. ......�si����,n� NT"'� s �5� S:. d ru,aw_.":r'1 �3'_tZ3rt-",naF�3u`k y irzr�na�Y�i"..',°a'1.,-�ix wr 3�r aW��„l.:u.:F�isx.{�$,'�5.::..�azrtu�+-�..�'SF 'J9 ' 9. System Controls System controls operating per design intent Signatures Approved. Agency.(teohniclan performing inspection and testing: documented on this form) Name (print) r v Title ..� 7 t`'"%�F a rAti § �.. Ipi 42 r ! - '4 .,]C:� ."i' � V., ri� Q p. (" P:I'k C.?' 1'4 5 (. �^: Company. n:A ♦hs :Ow we�� •l�An k f y 1 (1v�i 1W hiJ. A� rJ It 'IC i `n.4 Signature arid, Date ! 6 P /.v(S{ HVAC contractor (Ft Mechanical Systems Performance Testing Submittal Form V20120608 6of6