HomeMy WebLinkAbout5832 Big Canyon Dr - Disclosures/Mechanical - 08/13/2013w
e13
City offort Collins
Residentlal Mechanical. Systems Performance Report
This form Is a record of testing targets and results, Win PoselFail outcomes. For information on measurement tools and testing techniques, see the *Residential New
Construction Mechanical Systems Testing Guide.' The guide and this form maybe periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by,an °Approved Agency," and submitted to Building Services as a requirement forreceiving a C.O.
Color key
exhaust
Measured value to
NoetorrgmRg
compareyAlhlergeCor
Peas?
r
t Caubari>,�
other do
Airflow measurement method Flowbox _ Flow cd lar
_ Passive flow Hood _ Pilot tube traverse
Temperature uair through .� Indicated floe to @ 6000'dc lbw temperature
measurement tool F' (� 5000'; air temperature
Measured Exhaust Airflow
Operation
Minimum
Design
Indicated
Exhaust Location
Intermittent or
Airflow
Alrtlow
Flow
Volumetric Flow
Pass
Fail
Continuous
Requlremeitt
(CFM
(CFM)
(CFM 5,09o)
(CFM 5000')
500trj
Uj Ci Q'C
Intermit Conlin
\I��
Conln
'., � Q �a
�,
�
_Intermit _
,
-
intermit, Conlin:
_
r
Intermit. Conlin
.'
0
r i°
_ _
Vh
Intermit- _ Conlin
❑
AT .7'
Conlin
d Y e:
g
-
.�.. �i..r -
❑
Y rry EY
_Intermit
; y®
Intermit- Conlin
ti -
-
❑
�� " n sr ;'t
_
- _ --
Intermit Conlin
❑
i',.k®'$3a
4"
? Da
Kitchen exhaust,
Oven fuel — Gas
Electric
Exhaust eirflow
} Operation Intermittent _Contiriuoue�
aMeasured airflow
❑ NIA :Kitchen hood does not vant outside
Minimum exhaust alAlowrequlrement ¢ 60M 5000'
Artlowmeasurementmethod Fbwbox _Flow. collar
r n _Passive flow flood _ Pilot tube'traverse
�s,l{
',I
Temperature of air through
measurement tbol
'I
/ 5V
-p•;
Jd
Indicatedfluty ',��
CFM
l4
Testing notes (fercspeed, masking.
-flowoutofrange,.....)
Indicated flow to Volumetric now temperature
(dy 5000', air temperature
Volumetric flow ; CFM 5gU0'. Pass ill Fall
Manancat Systems Peaainikalesihp SubrnNW Fwm V20120608 al B
Systems other than sub -structural floor exhaust
- Minimum exhaust eMlowrequirement
ii � a aTr` CFM6000'
Indicated lc
Volumetric
Design Alrllow
Measurement
Measurement Location+
Flow
„�. (CFM 5000')
Method
Alf Temperature (F)
Multiplier
_Flow box
Total exhaust airflow
_ Passive flaw hood
_ Flowcollar
v C-
x
_ Pilot tube traverse
Flow collar
Total supply airflow
_ Pilot tube traverse
_Flow box
Passive flaw hood
Measured Alrflow
Indicated Flow Volumetric
(CFM) Flow Page/Fall
(CFM 6000')
in which supply airflow is circulated by the air handler fan, fen speed for measurement[_ Heat Cooling Continuous fen
airflow In balanced systems
Average of measured CFM5000' Target Dow range -
and exhaust flows (average +/• 7545) : , to .. ' { CFM 6000'
PO Pass # ; nQ Fail
Sub -structural floor exhaust A N/A — no sub -structural floor exhaust system
Design airflow CFM 5D00'
-' jMeasured Willow
{
ram' Airflow measurement meow Flow box _ Flow collar
LA Passive flow hood _ Pilot tube traverse
_ Temperature ofuelrthrough
nttool��P SOW,IndifatedflowtoVolumetricflowmulfiplie
�
measurement tool @ 60, air lemperatur u
Indicated fkrw�CFM Volumetric flow {`
CFM 5000' ❑Pass ILL�� Fail
s NIA — no ductwork or no ductwork outside condi0onej Iarg Temperature of air throuph�`1F
/AI measuuement tooluu
Y
House conditioned floor area
at IV r Indicated flow to Volumetric flow
atr
(815000', air temperature
ti
Maximum Allowed Duct Leakage
Measured Duct Leakage
"r
Test Parameter and Conditions
Normalized LeakageA
clots
Indicated Flow
VolumaMe
:.:
(CFM26 / 100 sq
Leakage
(CFM26)
(CFM2b )
Flow
(CFM26 6000)
Measurement
Timing
Ali Handler
Pass/Fall
k
Total leakage
Rough -in
Excluded
4
❑
❑
s-
Total leakage
Rough -in
included
6
❑
6i
Total leakage
Complete
Included
12
❑
Leakage to outdoors
Complele
Included
8
owl
❑
Off,
Machxrtcal SysteM Pfff m we TacOne 80"W Fomr
V20120M
2of6
W
Static,preasures,(OPTIONAL).,
Cooling coil'installed _Y _'N
Mods: Heating
coofing
Continuous Fan
Fin speed too_
Humidifier lips ss_pper�_Closed
.AJI registers open
AP' --filter =
.Thickness Inches
P=+
AP AC coil =
PC+
AP Total,ESP
airflow tbirdtigo indoor Call Usinig flow.grld O N/A— no AC systerninstalled
v CFM SOO(Y Target alftwilmils (design tl- 161A)
log' CFM 5000'
Cooling fan speed tap Flow grid plate sizaF1 14 2�0
Temperature of air throug F Indicated flow to Voluinetric flow multiplier
measurement toof, U a 5000. air temperature
NSOP Pis TFSOP Pe Flow Resistance Correction factof As
'Measured Wril6w, 66 adjuilmienls orcorriicu6n CFM Adjusted- (Indicated) alrili 5-57CFM
volum6tric flow CFM 6DW pass F-17 QI] Fall
Heating: ,G6s manifold pressure!
OEM manifold pressure -4 W NO
I C Target manifold pressure limits (spec 5%)
ardfold pressure••IWC Pass Measured m JFall
Hosting; Temperature rise
OEM temperature rise Omits F
'J. Measured temperature rise.
Return air F' Supply air F
Caution: Temp risewithin:
Pais Fall F
F-5 10'Fof top of range.
Matharkel systems PNICanshoo T06tho StNrJU1 Faw v2nizosaa 7dG
(This section under development, not yet being enforced)
Register air flows
and moving air
All registers are cut through finish materials
(Remainder of section under development, not yet being enforced)
Pressure balance
Pressure difference limit, room-lo-core F7- tg +8 Ps
Pass Hqufii Fall IN
Room
Measured pressure
Pass
Fall
drop (Pa)
S S��C
/I
MIA, AMMIN".1 VON!'
EVE.,
ME - oW
MecholVA Syttemi Porto ru Terikiq SubmlW Form V20120603 4016
8. Coinbustion Safety
WA — no natural draft combustion appliances Outdoor temperature F
Womt-20depressuitzation testing
raHouse setup
appliances
of both fens on These doom are closed:
—Vented range hood on
Clothes dryer on
Alt handler on
Other fens on
A,ppliano
Typi
Locatio,
K pressure
BPI depressurization limit Pa wyt outside
Measured net CAZ depressurization Pa virt outside
OK (less negative) I Caution (more negative)
BPI mrudmum limit
seconds
Measured spillage duration
seconds
Pass - duration not exceeding limit
It pressure
BPI limit
Pe wt CAZ
Measured
Pa vAl CAZ
Pass - pressure more negative than limit
concentration in undiluted flue gas
BPI maximum limit
Ppm
Measured CO
PPM
Pass - CO level not exceeding limit
Caution - CO level 25 to 100 pprn
Draff-hood
Induced -draft
Draft -hood
Indured-direft
Draft -hood
Induoti"reft
❑ JOK j0:jCau6;n ❑I OK 10 1 CauFlonCaution
Y
lid
El
Pass
z
Fail
Fail
0
1Pass
JFGR
...... .... .
.......
..... . ..
Cl
I pass
15511
Fell
0
1 Pass
jjUqj'jj
Fall
Pass
"'MT",Fail
lob
lov
0
1 Pass
0
Pass
1
!
PNJ
it
E
0
IPass
Fail
[:3
In
1 Caution
0
1 Caution
❑
Caution
MVJM" SyMorns Parfewrnarn,,, Totting SubmUd Form V20120806 5 ore
9. System Controls
System controls operating per design Intent
rsaa
Approved Agency (t
Name (print)
; <Tdle
�x3
K,,jCompany
:.
� K
. VSignalure and Dale
:
System
Pass
Fall
Local exhaust
❑
Whole -house ventilation
❑ ..
Suh structural floor exhaust
❑
r
Heating
❑
CooI g
❑
echnician performing Inspection and testing documented on this form)
—dui` m S
HVAC contractor (Fort Collins license holder)
Name (print)
:Title
Company
-Signature end DF
h1o0ankd Systems Peaarmaw; Testing Submittal Fawn V20120605 safe