Loading...
HomeMy WebLinkAbout5832 Big Canyon Dr - Disclosures/Mechanical - 08/13/2013w e13 City offort Collins Residentlal Mechanical. Systems Performance Report This form Is a record of testing targets and results, Win PoselFail outcomes. For information on measurement tools and testing techniques, see the *Residential New Construction Mechanical Systems Testing Guide.' The guide and this form maybe periodically updated; check the Building Services web site for the current version. This form must be completed and signed by,an °Approved Agency," and submitted to Building Services as a requirement forreceiving a C.O. Color key exhaust Measured value to NoetorrgmRg compareyAlhlergeCor Peas? r t Caubari>,� other do Airflow measurement method Flowbox _ Flow cd lar _ Passive flow Hood _ Pilot tube traverse Temperature uair through .� Indicated floe to @ 6000'dc lbw temperature measurement tool F' (� 5000'; air temperature Measured Exhaust Airflow Operation Minimum Design Indicated Exhaust Location Intermittent or Airflow Alrtlow Flow Volumetric Flow Pass Fail Continuous Requlremeitt (CFM (CFM) (CFM 5,09o) (CFM 5000') 500trj Uj Ci Q'C Intermit Conlin \I�� Conln '., � Q �a �, � _Intermit _ , - intermit, Conlin: _ r Intermit. Conlin .' 0 r i° _ _ Vh Intermit- _ Conlin ❑ AT .7' Conlin d Y e: g - .�.. �i..r - ❑ Y rry EY _Intermit ; y® Intermit- Conlin ti - - ❑ �� " n sr ;'t _ - _ -- Intermit Conlin ❑ i',.k®'$3a 4" ? Da Kitchen exhaust, Oven fuel — Gas Electric Exhaust eirflow } Operation Intermittent _Contiriuoue� aMeasured airflow ❑ NIA :Kitchen hood does not vant outside Minimum exhaust alAlowrequlrement ¢ 60M 5000' Artlowmeasurementmethod Fbwbox _Flow. collar r n _Passive flow flood _ Pilot tube'traverse �s,l{ ',I Temperature of air through measurement tbol 'I / 5V -p•; Jd Indicatedfluty ',�� CFM l4 Testing notes (fercspeed, masking. -flowoutofrange,.....) Indicated flow to Volumetric now temperature (dy 5000', air temperature Volumetric flow ; CFM 5gU0'. Pass ill Fall Manancat Systems Peaainikalesihp SubrnNW Fwm V20120608 al B Systems other than sub -structural floor exhaust - Minimum exhaust eMlowrequirement ii � a aTr` CFM6000' Indicated lc Volumetric Design Alrllow Measurement Measurement Location+ Flow „�. (CFM 5000') Method Alf Temperature (F) Multiplier _Flow box Total exhaust airflow _ Passive flaw hood _ Flowcollar v C- x _ Pilot tube traverse Flow collar Total supply airflow _ Pilot tube traverse _Flow box Passive flaw hood Measured Alrflow Indicated Flow Volumetric (CFM) Flow Page/Fall (CFM 6000') in which supply airflow is circulated by the air handler fan, fen speed for measurement[_ Heat Cooling Continuous fen airflow In balanced systems Average of measured CFM5000' Target Dow range - and exhaust flows (average +/• 7545) : , to .. ' { CFM 6000' PO Pass # ; nQ Fail Sub -structural floor exhaust A N/A — no sub -structural floor exhaust system Design airflow CFM 5D00' -' jMeasured Willow { ram' Airflow measurement meow Flow box _ Flow collar LA Passive flow hood _ Pilot tube traverse _ Temperature ofuelrthrough nttool��P SOW,IndifatedflowtoVolumetricflowmulfiplie � measurement tool @ 60, air lemperatur u Indicated fkrw�CFM Volumetric flow {` CFM 5000' ❑Pass ILL�� Fail s NIA — no ductwork or no ductwork outside condi0onej Iarg Temperature of air throuph�`1F /AI measuuement tooluu Y House conditioned floor area at IV r Indicated flow to Volumetric flow atr (815000', air temperature ti Maximum Allowed Duct Leakage Measured Duct Leakage "r Test Parameter and Conditions Normalized LeakageA clots Indicated Flow VolumaMe :.: (CFM26 / 100 sq Leakage (CFM26) (CFM2b ) Flow (CFM26 6000) Measurement Timing Ali Handler Pass/Fall k Total leakage Rough -in Excluded 4 ❑ ❑ s- Total leakage Rough -in included 6 ❑ 6i Total leakage Complete Included 12 ❑ Leakage to outdoors Complele Included 8 owl ❑ Off, Machxrtcal SysteM Pfff m we TacOne 80"W Fomr V20120M 2of6 W Static,preasures,(OPTIONAL)., Cooling coil'installed _Y _'N Mods: Heating coofing Continuous Fan Fin speed too_ Humidifier lips ss_pper�_Closed .AJI registers open AP' --filter = .Thickness Inches P=+ AP AC coil = PC+ AP Total,ESP airflow tbirdtigo indoor Call Usinig flow.grld O N/A— no AC systerninstalled v CFM SOO(Y Target alftwilmils (design tl- 161A) log' CFM 5000' Cooling fan speed tap Flow grid plate sizaF1 14 2�0 Temperature of air throug F Indicated flow to Voluinetric flow multiplier measurement toof, U a 5000. air temperature NSOP Pis TFSOP Pe Flow Resistance Correction factof As 'Measured Wril6w, 66 adjuilmienls orcorriicu6n CFM Adjusted- (Indicated) alrili 5-57CFM volum6tric flow CFM 6DW pass F-17 QI] Fall Heating: ,G6s manifold pressure! OEM manifold pressure -4 W NO I C Target manifold pressure limits (spec 5%) ardfold pressure••IWC Pass Measured m JFall Hosting; Temperature rise OEM temperature rise Omits F 'J. Measured temperature rise. Return air F' Supply air F Caution: Temp risewithin: Pais Fall F F-5 10'Fof top of range. Matharkel systems PNICanshoo T06tho StNrJU1 Faw v2nizosaa 7dG (This section under development, not yet being enforced) Register air flows and moving air All registers are cut through finish materials (Remainder of section under development, not yet being enforced) Pressure balance Pressure difference limit, room-lo-core F7- tg +8 Ps Pass Hqufii Fall IN Room Measured pressure Pass Fall drop (Pa) S S��C /I MIA, AMMIN".1 VON!' EVE., ME - oW MecholVA Syttemi Porto ru Terikiq SubmlW Form V20120603 4016 8. Coinbustion Safety WA — no natural draft combustion appliances Outdoor temperature F Womt-20depressuitzation testing raHouse setup appliances of both fens on These doom are closed: —Vented range hood on Clothes dryer on Alt handler on Other fens on A,ppliano Typi Locatio, K pressure BPI depressurization limit Pa wyt outside Measured net CAZ depressurization Pa virt outside OK (less negative) I Caution (more negative) BPI mrudmum limit seconds Measured spillage duration seconds Pass - duration not exceeding limit It pressure BPI limit Pe wt CAZ Measured Pa vAl CAZ Pass - pressure more negative than limit concentration in undiluted flue gas BPI maximum limit Ppm Measured CO PPM Pass - CO level not exceeding limit Caution - CO level 25 to 100 pprn Draff-hood Induced -draft Draft -hood Indured-direft Draft -hood Induoti"reft ❑ JOK j0:jCau6;n ❑I OK 10 1 CauFlonCaution Y lid El Pass z Fail Fail 0 1Pass JFGR ...... .... . ....... ..... . .. Cl I pass 15511 Fell 0 1 Pass jjUqj'jj Fall Pass "'MT",Fail lob lov 0 1 Pass 0 Pass 1 ! PNJ it E 0 IPass Fail [:3 In 1 Caution 0 1 Caution ❑ Caution MVJM" SyMorns Parfewrnarn,,, Totting SubmUd Form V20120806 5 ore 9. System Controls System controls operating per design Intent rsaa Approved Agency (t Name (print) ; <Tdle �x3 K,,jCompany :. � K . VSignalure and Dale : System Pass Fall Local exhaust ❑ Whole -house ventilation ❑ .. Suh structural floor exhaust ❑ r Heating ❑ CooI g ❑ echnician performing Inspection and testing documented on this form) —dui` m S HVAC contractor (Fort Collins license holder) Name (print) :Title Company -Signature end DF h1o0ankd Systems Peaarmaw; Testing Submittal Fawn V20120605 safe