Loading...
HomeMy WebLinkAbout2286 Trestle Rd - Special Inspections/Engineering - 04/08/2013April 8, 2013 H&O Homes 1105 Valley Drive Windsor, Colorado 80550 Attn: Wayne Hupp Re: Foundation Excavation Observation 2286 Trestle Road. Fort Collins, Colorado Northern Colorado Geotech Project No. 194-12 Northern Colorado Geotech 2956 29th Street, Unit 21 Greeley, Colorado 80631 Phone: (970) 506-9244 Fax: (970) 506-9242 On April 3, 2013 a representative of Northern Colorado Geotech performed an excavation observation for a residence under construction at the above referenced site in Fort Collins, Colorado. The soil exposed at the upper and lower footing level consisted of sandy lean clay. These materials are similar to those encountered by Northern Colorado Geotech during our subsurface exploration at the site (Project No. 194-12, dated December 14, 2012). Based on our observations and the recommendations of the geotechnical engineering report, it is our opinion that the proposed residence may- be supported by a spread footing foundation system.. The foundation should be designed in accordance with the recommendations and specifications provided- in the geotechnical engineering report. Groundwater or bedrock was not encountered within two feet of the lower footing. level. However, as a precaution, we recommend the installation of an exterior perimeter drain around the lower level of the structure. The dewatering system should be constructed in accordance with recommendations of the geotechnical engineering report. If you have any to contact us at Sincerely, NORTH N C1 Doug L gren, President .��,•, C.VvF 'ccN o� 25012 ks; P. E. �LCr Ito". •',4 G Addres this letter or if we may be of further assistance, please do not hesitate �,«o ii�� � WLLFiS � Gl55OC2GlTL�S S T�R U C T U R A L E N G I N E E R S April 30, 2013 , Hupp Construction 3926 Sunstone Way � Fort Collins, Colorado 80525 Re: Footing and Foundation Wall Steel 2286 Trestle Lot 2, Block 22 - Sidehill Fort Collins, Colorado Project No. 213033 Gentlemen: On April 26 and 30, 2013, a representative of Weeks & Associates observed footings and foundation wall steel at the referenced site. Observations indicate the footing sizes and foundation steel reinforcement are in substantial accordance with the engineered foundation plan for the project by Weeks & Associates. In addition, the electrode had been placed in accordance with the recommendations by NEC. , If we can be of further assistance please contact us. Sincerely, :hy v0 REG��� ^ We 8. Associates;iric:'•. fiC 7�O`,•`Q,`1 U' `��<''ra�.�U ;U�' "'�`i,�', �O�•1<; Lw: � : �'. .��L' ary G. Weeks, P�^EC;�� ' �- 1 tructural Enginee�a��"S/�t�,,, -�z��;� ���L,:�S'�� 4700 South College Ave, Suite 1, Fort Coliins, CO 80525 Phone {970) 225.2422 - Fax(970) 225.2622 Northern Colorado Geotech May 21, 2013 2956 29th Street, Unit 21 Greeley, Colorado 80631 Phone: (970)506-9244 , fax: (970)506-9242 , H & O Homes 1105 Valley Drive 1Nindsor, Colorado 80550 Attn: Wayne Hupp Re: Perimeter Drain Observation 2286 Trestle Road Fort Collins, Colorado Northern Colorado Geotech Project No. 194-12 On May 20, 2013 a representative of Northem Colorado Geotech performed a perimeter drain observation at the above referenced address in Fort Collins, Colorado. The perimeter drain consists of 4-inch perforated PVC placed around the exterior perimeter of the basement. It is our understanding that the drain will be connected to the subdivision underdrain. The pipe was surrounded by pea gravel. Filter fabric had been placed over the gravel. The installation of the perimeter drain appeared to be in general accordance with project plans and specifications. We also observed that damp proofing had been applied to the below grade foundation. . If you have any questions about this letter or if we may be of further assistance, please do not hesitate to contact us at (970) 506-9244. Since�ely, :�����co�v��oA�s�;,, . NORTHER COLORA O:�EC�TE�H'�' �r p�'�kyg,f;�"'� / �L • �A �� pG ° °' i N Doug Leafgr�n, P.G. �oa°, `� .•,:.� P(esident ".��!`�........�����;*� , '��"a.��aFG�` R wed by: �,P�O REC;;��,��:Ss�a;ati�E�l' ,��•d •'s G. ��.•;,;.fi,�>.� � :��i,, ��� c�,�� ' :C? %n . . . . . . . Weeks�, P.E�?�0?� ��j ce President ' . � '�-`�:� � �; . ,••f�c. , l r�;i c : Addressee�('2) � , ���� � _ , '��. ���,f a� . '��;,s. � , . . `�*�;..�:w��. � :