Loading...
HomeMy WebLinkAbout2245 Nancy Gray Ave - Special Inspections/Engineering - 09/27/2013September 27, 2013 i' EARTH ENGINEERING Bellisimo, Inc. CONSULTANTS, LLC 3702 Manhattan Ave Suite 201 Fort Collins, Colorado 80526 Attn: Mr. Gino Campana (gcampana@bellisimoinc.com) Re: Construction Observation and Testing — Final Compliance Summary Letter Bucking Horse Filing One — Community Pool and Clubhouse Structure Median Area within Nancy Gray Roadway Alignment Fort Collins, Colorado EEC Project No. 1124098 Mr. Campana: As you are aware, during various construction phases for the referenced community pool and clubhouse structure located within the "football shaped median" along Nancy Gray, Earth Engineering Consultants (EEC) personnel, provided construction observation and testing services of requested items on a part-time/periodic, as-needed/on-call basis as scheduled by the project's contraction manager, Bellisimo, Inc., as per the project specifications. Bi-monthly construction materials testing (CMT)/quality control (QC) reports concerning the services provided by EEC personnel were submitted to the developer and to the project design team members' attention during the appropriate time period(s) as the test results became available. We have recently been asked by Mr. Nico Campana, the project's construction manager with Bellisimo, Inc., to provide a summary and/or compliance letter addressing the services performed by EEC personnel regarding the foundation construction for the clubhouse building. During the foundation construction phase for the referenced project, EEC personnel provided site observations including a foundation-excavationP'open-hole observation" along with field density testing of on -site subsoils/replaced as engineered fill material within the foundation alignments, interior floor slab areas, and backfill adjacent to foundation walls, as recommended in the project - specific subsurface exploration report, (please refer to EEC's "Surface Exploration Report" dated January 29, 2013, Project No. 1122025). EEC personnel provided reinforcement observations of the foundation system including the conventional spread footings placed on either native subsoils and/or approved engineered/controlled fill material, the cast -in -place concrete foundation walls, and of the interior floor slab. EEC personnel also provided testing of all cast -in -place concrete for the foundation system, the interior floor slab, the "shot-crete" cementitious material used to create the pool liner, along with the exterior concrete flatwork areas. 4396 GREENFIELD DRIVE WINDSOR, COLORADO 60550 (970) 545-3908 FAX (970) 663.0282 www.earth-engineering.com Earth Engineering Consultants, LLC EEC Project No. 1124098 Compliance Summary CMT/QC Report Bucldng Horse — Community Pool and Clubhouse September 27, 2013 Page 2 Based on our review of the outlined testing, as directed and/or scheduled by the construction management agency, and completed by EEC personnel on an as -needed basis, the final field density test results within the building footprint, and associated exterior flatwork, along with associated site utilities, met the project compaction requirements for fill materials placed and compacted to redevelop the foundation bearing strata, interior floor slab elevations, backfill placed adjacent to foundation walls and within on -site utility trenches. Laboratory compressive strength tests completed on the cast -in -place concrete for all foundation elements and floor slabs, along with the "shot-crete" for the pool, all conformed to the project specified minimum 28-day compressive strengths requirements. Observations of reinforcement within the clubhouse and swimming pool structure's foundation systems and/or liner portion for the project, (i.e., the cast -in -place conventional spread footings, cast -in -place foundation walls, and shot-crete liner), were completed by EEC personnel and reports were submitted to your attention during the appropriate periods as the results became available. Based on our review of the outlined observations, we believe the reinforcement within the foundation system and structural relative elements were placed and constructed in general compliance with the project plans and specifications for the project. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, LLC —27 12, David A. Richer, P.E. Senior Geotechnical Engineer cc: Bellisimo, Inc. —Mr. Nico Campana: ncampana(@bellisimoinc.com Bellisimo, Inc. — Ms. Elissa Palmer: eyalmer(a)bellisimoinc.com, Mr. Tony Campana: tony(a,thel00octane.com City of Fort Collins —Mr. Steve Cicione: scicione0fcgov.com