Loading...
HomeMy WebLinkAbout243 N College Ave - CO/LOC/Tenant Finish - 08/09/2013of City Collins Community Development & Neighborhood Services 281 N. College Ave Fort Collins, CO 8o522 970.221.676o 970.224.6134 -fax Temporary Certuicate of Occupancy Permit #: B1301686 Work Description: TENANT FINISH OF 9882 SQUARE FEET CHANGE OF USE FROM CAR WASH TO OFFICE SPACE FOR "SPIRAE, INC", TO INCLUDE, OFFICES, MEETING ROOMS, BRAKE ROOM, STORAGE AND MECHANICAL ROOM. OWNER AFFIDAVIT ON FILE. This is to certify that the building, structure, or land located at 243 N COLLEGE AVE Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 08/09/2013 and conditional upon the following requirements being completed and approved upon final inspection. Engineering Final Requirements to be Completed By: 01%M13 TCO will be issued for 30 days until completion of sidewalk chase construction work at which time will provide full CO upon acceptance of work, Escrow money has been received for the other sidewalk tams (drive approach and additional chase). Zoning Fina -Requirements to be Completed By: 713 Ok for TCO with following conditi no ss 1. install raised handicap p rara Cnng stall s 2. move e handicap parking spacesouth tc 3. install bike rack 4. complete pal tic"el ndosure' per plan or If,such work is not completed within the time set forth above and -approved on final inspection, or -unless the time for completion is' extended by the Building and Zoning Office,.an order to vacate the p er mises or; a violation notice for occupying the building, structure, or Iand-without a Certificate of Occupancy will be issued. Such violation is subject to_a.maximum fine-of"$1000,00 per day for every day of violation. Date Date of Issuancle NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owners name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 08%/2013 01:08:15 PM Page 1 of 1