Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this forth may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency;' and submitted to Building Services as a requirement for receiving a C.O.
Color key
r
Measured value to
-Target or fins
compare with target o
Passe'
Other data
Addres 2315Sunbu
�- Builde
HVAC contractoi IMS Heating and Air
exhaust
Testing date(s)
Airflow measurement metho w box _ —Flow collar "
— Passive flow hood" — Pitot tube traverse
Temperature of air throug 81 - F Indicated flow to Volumetric flow multipli
measurement too @ 6000', air temperature
Measured Exhaust Airflow
Minimum
Exhaust Pickup Location
Operation
Intermittent or
Airflow
Indicated
Flow
Volumetric Flow
PassFail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 6000')
Master Bath
nterrnfl _Conlin
.50 cfm�.J
77
85.393�`.,
U.L.Bath
mtertnit _Contin
`SQcftri, ,
76'
84.284"
Powder Bath
llotertnfl__Contin
'SO,cfrri
69" "
76521
-
'
Intermit — Conlin
r � ' � �
_.
__ _ ❑ ...�_..
'
Intermit Conlin Contin
El
Intermit-.. Conlin
;� ®, .^.
",. ." "-
❑.. _.....
-
—Intermit --Contin
r,c ae _,
.__
❑_ _
_ -
—Intermit _Contin
d,,,_ ,. ..
.'..
--" ❑
Kitchen exhaust
Oven fuel
Electric
Exhaust airflow
Operation - Intermittent Continuous'
airflow
Minimum exhaust airflow requirementCFM 6000'
F-�:,,
Airflow measurement method — Flow box - — Flow collar
Passive flow hood- Pitot tube traverse
Temperature of air through - -
measurement tool F Indicated flow to Volumetric flow multiplier Q
@ 5000', air temperature
licated flow FM Volumetric flowCFM 5000' - 13 Pass 13 Fail
sting notes (fan speed, masking - - _-
Flow out of range....
Mechanical Systems Performance Testing Submittal FonmV20120321 lots
other than sub -structural floor exhaust
n exhaust airflow, requirement 55 '.r:r� xai�:. �,' FM 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow Measurement Measurement Location +
Flow
Indicated Flow
Volumetric
(CFM 5000') Method Air Temperature (F)
Multiplier
(CFM)
Flow
Pass/Fail
(CFM 5000')
-
lowbox
Total exhaust airflow
-
Passive flow hood
"'. -
=
-
_III�FVi
.Flow collar
Pitot tube traverse
U.L.Bath
1.109
69
76.521, -
Flow collar
OU
- Total supply airflow
— Pkottubetraverse
_ Flow box
-
_Passive flow hood
'For in is handler fan, fan Heat Cooling Continuous fan
systems which supply airflow circulatedththe air speed for measuremen _ _ _
'.Balanced airflow, in balanced systems
.,
Average of measured suppl Target flow rang w-�t h;? 5,^`=
to°'`
and exhaust flo CFM 5000' CFM 5000'
(average +/. 15%)
,_ __.,❑ __.Pass �'.❑{'s-•Fail
Sub -structural floor exhaust
_Design airflow ^°tw a CFM 5000'
«_-Measured airflow
Airflow measurement metho —Flow box „ _ Flow collar
Passive flow hood —Pitot tube traverse
Temperature of air hrough F Indicated flow to Volumetric flow multiplier Q
measurement tool @ 5000', air temperature
Indicated flow QCFM Volumetric flow CFM 5000' Pass Fall
Temperature of air throug measurement too 81, F
House conditioned floor area 2246 sf
Indicated flow to Volumetric flow multiplier 1 • 1 09 @ 5000% air temperature 7
Maximum Allowed Duct Leakage
Measured Duct Leakage
9 Test Parameter and Conditions
Normalized Leakage
Absolute
Indicated FlowT(C
olumetric
Leakage
Flow
Measurement
Timing
Air Handler
(CFM25 / 100 sf)
(CFM25)
(CFM25
M25 5000')
PasslFail
Total leakage
Rough -in
Excluded
4
Total leakage
Rough -in
Included
6
0
0�
,1 Total leakage
Complete
Included
12
_ _
-
;-
e
0,'
' Leakage to outdoorsC
mplete
Included
8
',-
180=,
27 -_
30 '"
QT
Mechanical Systems Performance Testing SubmittWo V20120321 2 of 6
Filter type
11 Bran SCUtt1e,
pressures (OPTIONAL)
Mode: _ Heating
_ Cooling
Continuous Fan
Fan speed tap
Humidifier bypass _ Open _Closed
All registers open
_ Zone dampers open
8P filter =
Type/stye Disposable Thicknes 3 Inches MERV(optional)
P=-
P=+
LP AC coil = _
1
P=+
. LP Total ESP =
Cooling: Measured air flow through indoor coil using flow grid
Design cooling airflo 1 020 CFM 6000' Target airflow limits (design g6`�.� .y w to 1 173�;' a CFM 5000,
Measured airflow
Cooling fan speed tap Med-High
Temperature of air throug
t1Jr 6v measurement too 82 F
NSOP 33 • Pa TFSOP 32 - Pa
Measured airflow, no adjustments or correction QCFM
Volumetric 111A 1005.863 - 1CFM 5000' 1-' Pass
Flow grid plate siz20-
Indicated flow to Volumetric flow multipli rl 109 @ 5000', air temperature
Flow Resistance Correction Facto DG 000 -`
Adjusted (indicated) airflo 907 FM
, j�❑.. ilk", Fail
Heating: Gas manifold pressure
OEM manifold pressur - 7'� '.�9
- Iwc Target manifold pressure limits (spec +/. 5%) 3 / to 3�s'! IWC
specification, 60001 3.3
e (�
Measured manifold pressur .3 .4 , IWC Pass ' K 1�l Fail
4'
Heating: Temperature rise
OEM temperature rise limi to°_";, ?` F
V'Measured temperature rise
Return air '82 -- F Supply air 140 F
} �.e
Temp rise 58' F Pass Fail ❑ �' -Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing Submittaafo V20120321 3 of 6
6 Refrigerant<C4 rg
(This section under development, not yet being enforced)
Supply air flows (This section under development, not yet being enforced)
a balance
re difference limit, room -to -core Pa
Room
Measured pressure
drop (Pa)
Pass
Fail
Master Bedroom
Bedroom # 2
-0.9;
�-
Bedroom.#3
+0.7
�.,((°
-
.
::'� ❑.� _.
gym.,.
Mechanical Systems Performance Testing SubmittakFo V20120321 4 or 6
Outdoor temperature QF
Worst -case depressurization testing
House setup
appliances
1;It!e- -/r, e, 0414- l�e�,�c,►—
Z pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressurizationPa wrt outside
OK (less negative) I Caution (more negative)
BPI maximum limit
seconds
Measured spillage duration
seconds
Pass = duration not exceeding limit
ft pressure
BPI limit
Pa wrt CAZ
Measured
Pa wrt CAZ
Pass = pressure more negative than limit
concentration in undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
Draft -hood _ Draft -hood _Draft -hood -
Induced -draft 'Induced draft Induced -draft
❑'
OK
:❑;
Caution
❑ dK
I war on
,❑_
K
❑
Caution
60
'60 ='
60
❑
Pass
0 Lail
❑-
Pass
it
❑;_ ass
I ❑. ail
.,r Y l+✓$'�4'4 #� .W�
�' spry` w k q {"§ "rt <ff-& SscA
\ �.5`.t .yy �r ^t-. EG . �+£ '`h v
❑
Pass
0. ail
❑:.
Pass
it❑`
ass
❑
ail
{p00�:
100 �e
n 100 a
❑
Pass
ail
❑
Pass
11LAil
4E]�
ail
"%E]
Caution
:❑v
Caution
ution
Mechanical Systems Performance Testing SubmidaWo V20120321 5 of 6
System controls operating per design intent
Approved Agency
, Name (print)
r Title
Company
rSlgnature and Date
HVAC contractor
,Name (print)
tlTitle
Company
Signature and Date
SvRtPrn
Pass
Fail
Local exhaust
❑
Whole -house ventilation
Sub -structural floor exhaust
❑
�Pkr
Heating
Cooling
mod."o
tecnnician perrorminq inspection aci testinq documented on this form
Paul Higman
Field Services Manager
GS Services
Mechanical Systems Performance Testing SubmittakFo V20120321 6 of 6