HomeMy WebLinkAbout838 Ridge Runner Dr - Disclosures/Mechanical - 08/02/201361 Zo-i13�
City of Fort Collins
Residential Mechanical Systems Performance Report
This form Is a record of testing targets and results, with PasalFall outcomes. For Information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; duck the Building Services web site for the current version.
This form must be completed and signed by an `Approved Agency,' and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measinedvatuelo=
�Tergelaimit
compare vdth target or
Pass
�F ,r
`Caution -
Other data
limit
1011`1
Address �3 8 �i L u Testing dates) d' Z
Builder D. 2. ;c>r n o
�. HVAC contractor FQ r S ex, s on : nr
2 )Local Exhaust (Spot), Ventilation
Bath exhaust
Airflow measurement method Flow box _ Flow odlar
Passive flow hood _ Pilot tube Iraverae
I
Temperature of air throug Indicated flax to Volumetric flow mulliplie
F
7),
measurement tool Qo 5000', air lemperature 9
Measured Exhaust Airflow
Operation
Minimum
Design
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Airflow
Flow
Volumetric Flow
Page
Fail
Continuous
Requirement
(CFM
(CFM)
(CFM 5,000')
(CFM 6000')
SOgO)
X Intermit _ Conlin..
ntermil
. 5 ..
......
G 7
7
i
_ _Conlin
_Intermit _Conlin
..
❑
®:�`^`.'
_5:�. i
_Intermit Conlin
❑
�^V�j]�_
_Intermit Conlin
Intermit
❑
Inlartnit Conlin
..
❑
Intermit ConlinEPA
Intermit _Conlin
❑
w,
Kitchen exhaust
Oven fuel
I Qr N/A — Kitchen hood does not vent outside
Exhaust aim"
Operation _ Intermittent _Continuous Minimum exhaust airflow requirementCFM 5000'
1 Measured airflow
Alrllow measurement method — Fbw box _ Flax collar
_ Passive gow hood _ Pilot tube traverse
Temperature of air through F Indicated flow to Volumetric flow mullipile
1 measurement tool @ 5000', air temperature
[I gidj
t'f Indicated flow CFM Volumetric flow CFM SOWPass Fail
I{z�
R'
.
zip Testing notes (fan speed, masking,
lirju flowoutol range....
Mechamrcal Systems Performance Tesep Submittal Form V20120808 f at a
i3Z`20_7G3el
3. Whole-Dwelli ig-Unit Ventilation
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement'""_? . . ;= CFM 5009
Indicated to Measured Alrnow
Totes exhaust alrfbw
Total supply airflow,
Design Alrflow
(CFM 5000')
Measurement
Method
Measurement Location +
Air Temperature (F)
Volumetric
Flow
Multiplier
Indicated Flow
(CFM)
Volumetric
Flow
(CFM 60001
Pass/Fall
—Flow box
P owd Gr
r }
=Passive
wcoll vwhood
Flowedler
by
��
99
®
-_ -
_ Plot tube traverse
—Flow collar
N/4
—Plot it" traverse
Flow box
❑
= Passive flow hood
systems in whirls supply airflow Is circulated by the air handler fen, fen speed for measurement — Heal Coding — Continuous fen
SBalanced atrflowIn balanced systems
Average of measured supply Target flow range
and exhaust flows CFM 6000' 77.
(average +/- 15Y.) ...lo..� CFM 5000'
Pass Feil
Sub -structural floor exhaust NIA — noaub•structural floor exhaust system
'f Design airflow CFM SOOD'
!Measured airflow
Flowbox Flow collar
Airflow measurement method — passive flow hood — Pilot tube traverse
Temperature of air through Indicated flow to Volumetric lbw multiplier
P measurement tool �F C 50D0', air temperature��
Indicated flowCFM Volumetric flowCFM 6000' ❑ Pass Fail
Ff NIA— no ductwork or no ductwork outside conditioned apace Temperature of air throug�F
measurement tool
House conditioned floor area sf Indicated flow to Volumetric flow multiplier
Z loZ I ® 5000'. air temperalull I
Maximum Allowed Duct Leakage I Measured Duct Leakage
Test Parameter and Conditions
Normaltxed Leakage
(CFM26/100af)
Absolute
Leakage
(CFM26)
Indicated Flow
(CFM26)
Volumetric
Flow
(CFM266000')
Measurement
Timing
Air Handier
PasslFeil
Total leakage
Rougfl•In
Excluded
4
❑❑(
g
Total leakage
Rough -In
Included
6
(]
RE
Total leakage
Complete
Included
12
❑
ah
Leakage to outdoors
Complete
Included
8
_
❑�
Muharical SYMMS Prdom Telling Sub"111 Flom V20120600 2018
.. ing
Fliter type
R Brand i�rJrl.Mp � Type Ieye PI }-6 Thickness Inches MERV(optional)®
Static pressures (OPTIONAL)
Cooling tail installed _ Y
_ N
Mode: _ Heeling
Cooling
_ Continuous Fan
Fan speed top
Humidifier bypass _ Open
_Closed
�¢
_All registers open
P=_
DP filter =
P=+
Ps+
AP AC coil =
DP Total ESP =
Cooling: Measured Sir flow through Indoor toll using flow grid N/A— no AC system Instelied
i Design coding elr0ow CFM 500V Target airflow limits (design+1. 159%) to CFM 5000'
Measured airflow
-`•t j Coding fan speed top Flow grid plate size
Temperature of air through F Indicated Row to Volumetric flow multiplier
measurement tool @ 5000', air temperature=
NSOP Pa TFSOPPa Flow Resistance Correction Facto'L�i
Measured elAow, no adjustments or corecton CFM Adjusted (Indicated) eirflo%v CFM
Volumetrc flowCFM 500V ❑ Pass (� a ❑ y"'.-' Fail
Heating: Gas manifold pressure
OEM manifold
tipressure
,600V IWC Ta et manifold ressurelimits s ec+1-5%
specification, 5000� 3. 3 � D (p ) 3.Z� 3,y Iwc
f Measured manifold pressure 3 , y IWC Pass Fail
Heating: Temperature rise
,.
I^� OEM temperature rise limits ,_,('�J?;.to.:�,'�.�7 F
Measured temperature rise
A
j Return air ®F Supply air 1 6 F
a
Temp rice F Pass r iS+ � Fail ❑ Caution: Tamp rise within
#. �� 10 F of top of range
Mer rkbl Systems Prrformena Tefllt0 Submktal Fwrn V20120905 3010
Bizo-�i 3q
(This section under development, not yet being enforced)
T. Room Air. Flow and Pressure Balance
r
Register air Flows
iolflx
��'� All registers are cut through finish materials and moving air . Pass ii[D.1 Fell
(Remainder of section underdevelopment, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core $ to +3 Pa
Room
Measured pressure
Pass
Fall
drop (Pal
►� �F
7
�
� A
a s w � .-��.
2.
t
� RAi:1�na
❑
r�1 a7�, id.
��w
'
❑
� ^TG' �1^� lRrY�%
❑
OWN`
X'n.ss i�tii��''a'a
�2v sssxj�"
❑
'"�P
aao-❑yamM
Measr6cal Systems Perromwwe Using Submilel Form V$et2e5e6 4015
�1-Z 0-7) 3y
8. 60mbustionety
N/A— no natural draft combustionappllances Outdoor temperature F
Worst -case depressurization testing
K. House setup
Tea led appliances
k at bath fans on These doors are dosed:
—Vented range hood on
_ Clothes dryer on
Air handler on
Other tens on
Appllarxx
Typi
Loceeoi
�+ri CAZ pressure
BPI depressurization limit
Pa vat outside
Measured net CAZ depressurization
Pa vvrl cutelde
OK (less negative) I Caution (more negative)
I Spillage
BPI maximum limit
seconds
Measured spillage duration
seconds
Pass=duration not exceeding limit
�,.:. ' Draft pressure
1 BPI limit
Pe wrt CAZ
Measured
Pa wrt CAZ
Peas . pressure more negative then limit
?( CO concentration In undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass - CO level not exceeding limit
. Caution • CO level 25 to 100 ppm
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
❑ OK ❑ Caution ❑ 1 OK ❑ Caution ❑ OK ❑ Caution
60
BO
tt0
❑
Pass
0!,
Fail
❑
Pess;❑
Fall
❑
Pass
II FeII
❑ 1 Pass 0' FeII ❑ Pass Q Faii I ❑ Pass Il Fail
100
10D
100
❑
Pess IMIFell
❑
1 Pass
Fail
❑
jPass
Q,
Fail
❑
1 Caution
❑
I Caution
❑
Ceuuon
Merhmicd System. Padormence TeMha Submittal Fora V20120SUS 6 of 5
'01207 ) 3-q
System controls operating per design Intent
FA
�a it
f
System
Pass
Fall
Local exhaust
. (..
Whole -house ventilation
Sub -structural floor exhaust
Heatingi
Cooling.
e a
Approved Agency (technician performing Inspection and testing documented on this form)
?a
=; Name (pdnt)
Title
Company
Signature and Date
Qrd
HVAC contractor (Fort Collins license holder)
Name (print) »sti
Tilla e ♦r
Company
Signature end Dale
IAedheNw systems Permmenee resrry Subakul Form V2012080e 8cts