Loading...
HomeMy WebLinkAbout832 Ridge Runner Dr - Disclosures/Mechanical - 07/29/2013City of Fort Collins Residential Mechanical Systems Performance Report This forth Is a record of testing targets and results, with PasslFail outcomes. For Information on measurement tools and les5ng techniques, see the 'Residential New Construction Mechanical Systems Testing Guide.' The guide and this form may be periodically updated: check tho Building Services web site for the current version. This form must be completed and signed by en'Approved Agency; and Submitted to Building Services as a requirement for receiving a C.O. Color key Measured value to '��- r i Ta,{ga(ar�mA;g comparewithtargetor i Pau a 1 Ceubme; Olherdale limit y, Address Testing date(s) c '. BBuilderI `4 b irJ ry tg. HVAC contractor 2c:Local Eichaust (Spot) Ventilation , " �" ' , Beth exhaust ="t Airllow.measurement me0lod —Flow x —Flow collar f` Passiveboflow hood _ Pilot tube traverse Temperature of air through p roughF Indicated Dow to Volumetric Dow peratmultipfler:FT - _ measurementtool / � (� 5000', air lemperelure Q J Measured Exhaust Airflow Operation Minimum Design Indicated Exhaust Pickup Location Intermittent or Airflow Airflow Flow Volumetric Flow pace Fall Continuous Requirement Requirement (CFM (CFM 5,000'y (CFM 5000) 5000') _Intermit —Cowin "� ❑ A( § (SA 1 _ Intermit _ Comm JC 6 intermit —Conlin Q ❑ = r 8A7H 2 Intermit Cowin S Q� ❑ ```�I]^^', _ _ Intermit —Conlin ❑Q. ❑❑` _Intermit _Conlin ., Intermit Conlin ❑ Intermit Conlin 0 Kitchen exhaust Oven fuel Electric Exhaust oldlow Operation x intermigenl ConNnuoue — Ia<y Measured airflow ❑ NIA— Kitchen hoed does not vent outside Minimum exhaust sirflow requirement CFM 50ow k.':?`�• Airflow measurement method — Flow box — Flow collar Passive flow hood Pilot tube traverse _ y2 Temperature of air through p F Indicated flow to Volumetric flow mulliplie o measurement W 5000', air temptralure ' l Indicated flow 1 CFM Volumatrkflow / CFM6000' 0 pass Fell Testing notes (fan speed, masking, flow out of range, ... ) r Mechantce15ysi ms Padormana Teaaq Suammsl Farm V20120ODS01 1 era 1 3.:Whole-Mvelling-U nit Ventilation' Systems other than sub -structural floor exhaust +'Minimum exhaustairflow requirement - y 'ytCFM600V Indicated to Measured Alrflow = • Design Alrflow Measurement Measurement Location. Volumetric Flow Volumetrle Indicated Flow '- (CFM 5000') Method Air Temperature (F) Multiplier (CFM) Flow Pass/Fall (CFM 5000') _ Flow box ('� Pow ' ITotal exhaust airflow —]!t _ Passive floe hood _Flow collar P@ot tuba traverse _ Flow collar I ro Total supply airflow Pilot tube box traverseFlaw ❑ • k Passive flow hood ,rc° In which supply airflow Is circulated by the air handier fan, fen speed for measurement _ Heat X Cooling Continuous fan r 'g=l Balanced airflow In balanced systems .;: Average of measured supply Target flow range '* ,�?' + = N I CFM 5000' to I; CFM 5000 tq� and exhaust flows (average +/• _t tom; PeasFall Sub -structural floor exhaust WA —no sub -structural floor exhaust system Design eirllow CFM 6000' '•: Measured alrllow i'. 1 (:C .:...i Flow box _ Flow culler Airflow measurement method —_ Passive flow hood _ Pilot tube traverse Temperature of air through F Indicated flaw to Volumetric flow multidnr���I measurement tool C 5000', air temparetur f J 192 Indicated flow CFM Volumetric flowCFM 6000' ❑ Pass v'pE Fail Temperature of air through N/A — no dhvcA or no ductwork outside conditioned space F uc ,,..., measurement tool �s ;--„ Indicated now to Volumetric flow multiplier r, House conditioned floor area of Q SOW. air temperature P,.r9' Maximum Allowed Duct Leakage Measured Duct Leakage it»- (, Teal Parameter end Condillone Normalized Leakage Absolute Indicated Flow Volumetric Leakage Flow �z Measurement Timing Air Handler (CFM25 / 100 of) (CFM26) (CFM26) (CFM25 5000') PasslFall I'M C1 Total leakage Rough -in Excluded 4 ❑ rr� !;%� Total leakage Rough -in Included 6 ��r.. Total leakage Complete Included 12 ❑ rig 1z4 Leakage to outdoors � Complete Included 8 �.•, WmAnNuS eytlems Ped� T•rep aubmald Form V20IMS 2 of 6 � 1 -2-0 uz(-0-60 Filter type ME Brand Static pressures (OPTIONAL) Cooling coil installed _ Y _ N Mode: — Heating — Cooling — Continuous Fan Fan speed top Humidifier bypass _ Open __Closed _All registers open 7— A-- -.— P.. AP filter Typelavey Thickness Inches P=- P=+ P.+ MERV AP AC coil - AP Total ESP= Cooling: Measured air flow through Indoor coil using flow grid ❑ NIA- no AC system installed Design cooling airflow F/+ sqCFM 6000' Target airtlow limits (design 16-A) CFM sooty] sii Measured aldlow, Cooling fan speed tap Flow grid plate size Temperature of air through Indicated flow to Volumetric Dow multiplier 1 7 measurement to F 5000', air temperature NSOP[7 Pa TFSOP Pa Flow Resistance Correction Factor' 77 Measured eirnDw. no adjustments or correction CFM Adjusted (indicated) Willow CFM '.N - Volumetric flow CFM 600V 0 Pass vi� Fail rX� Heating: Gas manifold pressure OEM manifold pressure specification, 600 lWC Target manifold pressure limits (epee +1- 5%) IWC V RIP Measured manifold pressure lvvC ❑ Pass a FallFT*3 Heating: Temperature rise v7 OEM temperature die Omits Yl F Measured temperature rise Return elf [F Supply air F Temp rise F 13 Pass Fall ❑Caution: M Temp rise within 10 F top of of range Medharkel Systems 1`01rice Testno submittal Foes V2012un 3 Of 6 (This section under development; not yet being enforced) Register air flows Al registers are cut through finish materials and moving air Pass �ffl Fail W rl (Remainder of section under development, not yet being enforced) balance difference limit. row -to -core F77:5.tO, 3 ``' Pa Room Measured pressure Pass Fall drop (Pa) I_U VN' 0 1.0 . . . . . . . . . . MO 41 0 RE 0 LI III` M Medwwei Systems Pedomanc• Tesibe SttmW Fors WOUNDS 4 of 6 System controls operating per design Intent r Signatures Approved Agency Name (ptini) IM, <y1 Company sql h Signature and Dale system Pass Fall Local exhaust lNhote•houso ventilation Sub.structuralfloor exhaust Heating . Cooling HVAC contractor (Fort Collins license holder) Name (print) Title i Company 1i Signature and Date ff ww"MM. biedumcd Splama Performance 7eaaW Submitlel Fails V20120303 a of 6