HomeMy WebLinkAbout2543 Lynnhaven Ln - Disclosures/Mechanical - 08/21/2013-bl-60 «�
City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured value to
Target or limit
compare with target o
Pass
Fail
Caution
I Other data
,1. House Data
Address 2543 L nnhavcn Ln Testing date(s) 0 /21 /2013
Builder ) lirile r 11O111e
HVAC contractor IMS Healins-,
Bath exhaust
Airflow measurement metho L-7Nw box _ Flow collar
Passive flow hood _ Pilot tube traverse 1
Temperature of air thr0ugl Indicated flow to Volumetric flow multipli�
measurement too 67 IF @ 5000', air temperature 1.098
Measured Exhaust Airflow
MinimumOperation
Airflow
Indicated
Volumetric Flow
Exhaust Pickup Location
Intermittent or
Flow
PassFail
Continuous
Requirement
(CFtd)
(CFM 5,000')
(CFM 5000')
master Bath
termit Conlin
50 efin
80
87.84
❑
U.L. Bath
Nteffnit _Conlin
50 cthl
68
74.664
oRL—
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Intermit Conlin
❑
❑
Kitchen exhaust
Exhaust airflow
Oven
fuel — Gas
eclric
Minimum exhaust airflow requirementCH.1 5000'
Operation Intermittent Continuous
Measured airflow
Airflow measurement method = Flow box = Flow collar
Passive flow hood Pitot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool I @ 5000', air temperature
Indicated flow FM Volumetric flowCFM 5000'1 ::1 ❑ Pass ❑ Fail
Testing notes (fan speed, maski
flow out of range, .
Mechanical Systems Performance Testing Submittal FormV20120321 1 of 6
(LG� ZZ I IS
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
59
CI'M 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Localion +
Flow
Indicated Flow V°IllnletriC
(CFM 5000')
Method
Air Temperature (F)
Multiplier
(CFM) Flow
Pass/Fail
(CFM 5000')
View box
Total exhaust airflow
_ Passive flow hood
Flow collar
Pilot tube traverse
Bath
1.098
68
74.664
_ Flow collar
_ Pitot tube traverse
ram,M
I
Total supply airflow
_ Flow box
LW
4 1
Passive flow hood
For systems in which supply airflow is circulated"he air handler fan, fan speed for measuremen Heal Cooling Continuous fan
Balanced airflow in balanced systems
Average of measured suppl
and exhaust flow CFM 5000'
i 1,
Sub -structural floor exhaust
Design airflow
❑ Pass
CFM 5000'
Target flow rangr�
(average +!- 15%) tO CFM 5000'
❑ Fall
Measured airflow
Airflow measurement metho — Flow box _ Flow collar
Passive flow hood _ Pilot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool 1 7 @ 5000', air temperature
Indicated flow CFM Volumetric flow CFM 5000' 0 Pass 0 Fall
Temperature of air througl
measurement too C7 F
House conditioned floor area I "2,&�L —) sf
Indicated flow to Volumetric flow multiplier
@ 5000', air temperature
Maximum Allowed Duct Leakage pleasured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM251100 sf)
Absolute
Leakage
(CFM25)
Indicated Flow
(CFM25)
Volumetric
Flow
(CFp125 5000')
Measurement
Timing
Air Handier
Pass/Fall
Total leakage
Rough -in
Excluded
4
Total leakage
Rough -in
Included
6
El
L1
Total leakage
Complete
Included
12
❑
❑
Leakage tooutdoorsC
mplete
Included
8
230
32
35
Mechanical Systems Performance Testing Submitlalfo V20120321 2 or 6
Filter type
Bran Skuttle
Static pressures (OPTIONAL)
Mode: r^ Healing
&&Cooling
_ Continuous Fan
Fan speed lap
Humidifier bypass _ Open _Closed
All registers open
Zone dampers open
LP filter =
Type/style DISj)OS(1b1e Thicknes 3't Inches MERV(optional)�
P=-
P = +
OP AC coil =
P = +
LAP Total ESP
Cooling: Measured air flow through indoor coil using flow grid
Design cooling airflow 1 320 CF1.1 5000' Target airflow limit (design +1. 15%) 1122 to 1 5 1 s CFM 5000'
Measured airtlow
Cooling fan speed tap 111�11
Temperature of air lhrougi measurement too 67 F
NSOP 27 IPa TFSOP 25 Pa
Measured airflow, no adjustments or correction CFM
Volumetric floe 1396.656 CFM 5000' fAEr
n— Pass
Heating: Gas manifold pressure
Flow grid plate siu 14 _ 20
Indicated flow to Volumetric flow multipli r
@ 5000', air temperature .09�
Flow Resistance Correction Factol DG 700
Adjusted (indicated) airitot l 272 CFM
❑ Fail
OEM manifold pressur 33
IWC Target manifold pressure limits (spec +1- 5%) 1 to IWC
specification, 5000
Measured manifold pressur 3 3 IWC hl Pass ❑ Fail
Heating: Temperature rise
OEM temperature rise limit L\(�:) to � F
Measured temperature rise
Return air 69 F Supply air 127 F
Temp rise ir
58 F V Pass Fall ❑
Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing Submllt4Fo V20120321 3 of 6
(This section under development, not yet being enforced)
�7. Room Air Flow and Pressure Balance
Supply air flows (This section under development, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core -3 to +3 Pa
[loom
pleasured pressure
drop (Pa)
Pass
Fail
master Bedroom
-0• l
�
❑
Bedroom 2 Middle
+2.5
❑
Bedroom 3 Front
-0.2
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Mechanical Systems Performance Testing Suhmittrifo V20120321 4.16
Outdoor temperature F
Worst -case depressurization testing (I ,'�C�f•��-�1n cl,,-j{ftJ`
House setup
_ N of bath fans on
_ Vented range hood on
_ Clothes dryer on
Air handler on
Other fans on
Tesler) appliances
Applianc
Typ
Locatio
CAZ pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressurization Pa wrt outside
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit seconds
pleasured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wrl CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
Measured CO ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
These doors are closed:
Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
60
60
60
❑
Pass
❑
ail
❑
Pass
I EAil
❑
ass
❑
ail
100
100
100
❑
Pass
❑
ail
❑
Pass
l
❑
ass
❑ ail
❑
aution
❑
Caution
❑
aution
Mechanical Systems Performance Testing Suhmlttr*Fo V20120321 5 or 6
System controls operating per design intent
system
Fall
Local exhaust
❑
Whole house ventilation
❑
Sub -structural floor exhaust
❑
❑
Heating
❑
Cooling
❑
ApprovedAgency(techniciarr .,r rrr,r,r - -
Name (print) Paul Hignlan
Energy Rater
Thermal Concepts/ Allied
22 �3
Title
Company
Signature and Dale
HVAC contractor (F(
Name (print)
Title
Company
Signature and Date
rt Collins If
IM S' Heatm' g & ,fir, Inc.
Mechanical Systems Performance Testing Submiunkfo V20120321 6 of 6