HomeMy WebLinkAbout2536 Lynnhaven Ln - Disclosures/Mechanical - 07/27/2013City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form Is a record of tasting targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, seethe "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
ME
Measured value to
' 't s • i �`
r `';` »b
Target or limit_
compare with target o
Paaa•
FaIla
Caution.��`
Other data
Addrest 2536 Lyimhaven LAI Testing date(s) 07/27/,2013
Buildej JourneylHonies_
�. HVAC contracto
r 411 EX au �a` 0� k �xiCttl
Bath exhaust
p11
t
Airflow measurement melho Flow box _ Flow collar .
_ Passiv�F Pilot tube traverse
€ Temperature of Ihrougt Indicated flow to Volumetric now multipli r1
( 7�
s
measurement too @ 5000%air temperature .�QB:°
k
Measured Exhaust Airflow
( '
Operation
Minimum.
Indicated
Exhaust Pickup location
Intermlltentor
At rflow,
-
Flow
Volumetric Flow
Pass Fall
iv,
k�res
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 5000)
s
t]laS1CC Bath
Intermit
+�
�.�.
79.0$6��
—Contla
c x
2
I
U.L. Bath"
termit Conlin50
67
73.566
-�
'Intsnolt' ConU_o-'�
.,
,N
Intermit _Conlle
Interrmit Conlin
Intermit
—intermit _Conlin
N
Intermit
rm — Conlin
.,;
,„
—Intermit—Conlin
O
Kitchen exhaust
Oven fuel Gas
ctric
Exhaust elrflow
Minimum exhaust airflow requlremenlCFM 5000'
Operalionj L Intermittent _Continuous
airflow
Airflow measurement method — Flow box — Flow collar
— Passive flow hood — Pilot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool � @5000', air temperature
licated flow FM .Volumetric floWCFM 5000' Pass Fall
,sling notes (fan speed, masking
flow out ofraage, ...
Mechanical Systems Performance Testing Submittal FotMV20120721 1 of 6
`1 �3t 13
gc3or 9 31'
4 Vllh064DUteillrrg,.0Oft�,Vefill latlDim
ther than sub -structural floor exhaust
exhaust Willow requirement
CO -
FM 5000'
Indicated to
Measured Airflow
Volumetric
Volumetric
Design Airflow
Measurement
Measurement Localian ♦
Flow
Indicated Flow Flow
PassfFall
- (CFM 5000')
Method
Air Temperature (F)
Multiplier
(CFM) CFM 5000')
�iw box
1 �
Passive (low hood'
iaust airflow
—
collar
_Flow
_ Pilot tube traverse
Bath
11.098
167 ,.
73.566
—Flow.collar
— Pilot tube traverse
LO
ipply airflow
Flow box
Passive flaw hood„
sin which supply airflow Is circulatedtblhe air handler fan, fan speed for messuremen — Hea! Cooling.. _Continuous tan
airflow In balanced systems fi
Average o1 measured supplt flow .. sCFM 5000'
and exhaust Row
f❑ Pass
t.
Sub -structural floor exhaust
•Designairflow
Measured airflow.
CFM 5000'
Target - rang to CFM SOoO'
(average +1-15b) F70FIFall
Airflow measurement metho — Flow box — Flow collar
- I1 Passive flow' hood 11f— Pilot tube traverse 11�'IIf
Temperature a air through QF Indicated Row to Volumetric flow multiplier r i
measurement tool @ BODO', air temperature
1III
Indicated flow {---eCFM Volumetric flow CFM 5000' I ❑ i Pass 1 -+(Fall
I
• s • s a
^� Temperature of
u-air ent took
Indicated Row to Volumetric flow multiplier
measuiemenitoo 74 @5000',air temperature I.098
-� House conditioned floor area 3080 of
Maximum Allowed Duct Leakage
Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM251 100 sQ
Absolute
Leakage
(CFM25
Indicated flowFlow
CFM25M25
lumetric
T(C5000'
Measurement
Timing
Air Handler
PasslFail
Total leakage
Rough -In
Excluded
4
❑
r❑.,
Total leakage
Rough -in
Included
8
❑
❑°.
Total leakage.
Complete
Included
12
1-
-❑
9
❑s.
Leakana to outdooreC
mulete
Included
1 8
1,246
39
Z8-
Mechanical Systems Performance Testing SubmlttoWo V20120221 2 of $
Iaol i 3 q
Filter type
^J Bran SkllttlC
pressures (OPTIONAL)
Mode: —Heating
-Cooling
_ Continuous Fan
Fan speed tap
Humidifier bypass _ Open _Closed
All registers open
Zone dampers open
AP filter as
Type/style DIS osable Thlcknes 3n Inchos MERV(optional)�
P=+
AP AC coil =
P-+
1'•'faly?:i{i{7i.{i{li�ilii{{Tf i"
�IR43'gt:l.u{r"KU:' h';J
.......... Ri:F:iGi:}SHd�?Li.:1
1 ! un{i xu.ilna nn n
�xui9p!}.eilxy!u:i S'ci: !: Hix47
�piix•. }ai�'r' x1:SSris6S'iy9
'•IILS.I1l i.LLfAt :�(...�.nN«1.1x1
® AP Total ESP =
P=
Cooling: Measured airflow throu It ndoor coil usitg flow grid
Uu
r
Design cooling alrgo 1(722 CFM 5000' Target alAlow, IImIB (design +(-15%) 869 to, (176 . CFM 5000'
Measuredalrtlow
I Cooling fan speed top High Flow grid plate siz
Temperature of air lhroug Indicated Row to Volumetric Row multipll r
F
measurement too 74 @5000',alrtemperatt 1..098'
NSOP 19.7 Pa TFSOP io.2 Pa Flow Resistance Correction FacIoJ BIG 700
Measured airflow, no adjustments or correction �J CFM Adjusted (Indicated) aldlo I Q 1 1. CFM
•I Volumetric Ro 1 1 10,078 CFM 5000' ; ..e`J+ pass '" Fall
Heating: Gas manifold pressure
OEM manifold pressur IWC Target manifold pressure limits spec+!•sYa) ��i to .2r Iwe
specification, 5000 33
i
Measured manifold pressur 3.35 IWC l � Pass -------- - ` Feil
Heating: Temperature. rise
�•�� OEM temperature rise limit �'d - 103'V' F
--.,iMeasured temperature rise
((( Return air F .Supply air 126 F
I i Caution: Tam rise wilhln
III Temp rise 56 Fp(.�� Pass Q Fail 10 F of lop of range
Mechanical Systems Performance Testing SuemlllaWo V20120321. 3of6
(This section under development, not yet being enforced)
Supply air (lows (This section under development, not yet being enforced)
balance
difference limit, room•lo•core + 3`t0.+3'. Pa
Room
Measured pressure
drop (Pal
Past
Fall
master Bedrooffi
+1,2
31e,
Bedroom 2
-0.8
Bcdrotim3 %Den
-0.4k
W:r
o
u � e
hlechanleal Systems Performanu Testing Submiltdfo V20120321 4016
Outdoor temperature �P i- '
Worsltase depressurization testing lerA 1 C Wier �OA v'
lHouse setup
g of bath fans on 'These doota are closed: _
Vented range. hood on Clothes dryer dryer on
Air handler on,
r fans on
appliances
Applianc
Typ
Locallo
Issurs
depressurization limit Pa wrt outside.
sured net CAZ depressurizationPa wrt outside
less negative) I Caution (more negative)
BPI maximum limit
seconds'
Measured spillage duration
seconds
Pass o duration not exceeding limit
ift pressure
BPI limit
Pa wrt CAZ
Measured
Pa wrt CAZ
Pass o pressure more negative than limit
concentration In undiluted flue gas.
BPI maximum limit
ppm
Measured CO
ppm
Pass = CO level not exceeding limit
Caution - CO level 25 to 100 ppm
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft -
_ Draft -hood
Induced -draft
60. ,
g0
60
❑
ass,
all
❑
Pass
it
❑ aea
❑ ail
MMJ
IMW
WTI
100°
100
100
❑..
ass
I ❑ all
❑.
Pass
� ii
❑_. ass
❑ ail
❑.
autlon.
❑
Caution
❑ sullen
4
Mechanical Systems Performance Testing SubmlttafFo V2012032/ 5 at a
613-0/1b4
System controls operating per design Intent
Approved Agency
(Name (print)
•Title.
Company
.331gnaturs and Date
H_ VAC contractor
,Name (print)
fiTitle
company
signature and Dale
quAlana
Pass
Fall
Localexhaust
'may
❑�
Whole -house ventilation
A'
Substructural floor exhaust }v
❑
_,,,. .k
Heating
❑.)
Cooling%��..
..
ecnmcian performing 1115 UUUVJ1 UU ICDa1n uva un rouacw
Paul Higman
Energy. Ratcr
Thennal Concepts/ Allied
. r4.13.
. ---0 �� � �a�4 i►1V•
.Mechanical Systems Performance Testing 8ubmittdfo WOU0721 6 of 6