HomeMy WebLinkAbout2531 Banbury Ln - Disclosures/Mechanical - 08/24/2013City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For Information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency,' and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured value toL�'
'
Target or limit, ;
compare with target o
Pass :�
Faft ;
Caution
Other data
Minimum
Operation
Airflow
Indicated
Volumetric Flow
Exhaust Pickup Location
Intermittent or
Flow
PassFail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 6000')
master Bath
termit _Contin
50.efm
84
92:232 ;
U.L.Bath -
mermit _Conlin
DSO cfm;n .
77 -
84.546
Pwdr Bath
Vntemnit _Conlin
50 cfm �
53 -
58.194 ="
_Intermit _ContinEl-
r
Intermit Contin`
..
❑ ....
- Intermit _ Contin
" `"` t!` .
:_.. "..' . �:
_- ❑
_. Intermit. Contin
n x' m"a
-
-❑,
_
Intermit _ Contin
"a,+ °' . ?u�;ffi:..x;
_
,., x:...:.
❑ .
Kitchen exhaust
Oven fuel Gas
ectnc
Exhaust airflow
Operation _Intermittent Continuous=
airflow
Minimum exhaust airflow requirementCFM 6000'
Airflow measurement method — Flow box _ Flow collar
Passive flow hood Pitot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool @ 5000', air temperature
,
licated flow FM Volumetric flowCFM 6000' I3 Pass Fail
j
!sting notes (fan speed, masking - - -
flow out of range.... -
Mechanical Systems Performance Testing Submittal FormV20120321 1 of 6
(stems other than sub -structural floor exhaust
l
Minimum exhaust airflow requirement
yams'
50 -._N
FM 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Location +
Flow
Indicated Flow Volumetric
(CFM 5000')
Method
Air Temperature (F)
Multiplier
(CFM) Flow
Pass/Fail
(CFM 6000')
U-1ow box
-
=
` ck
Total exhaust airflow
-- -
-
—Passive flow hood
-
_ Flow collar
— Pitot tube traverse
W.L. Bath
1.088
53 -
57.664
_Flowcollar
Total supply airflow
— Pitot tube traverse
— Flow box
."
-
_ Passive flow hood
-
-.
Fi r systems in which supply airflow is circulatedtbthe air handler fan, fan speed for measuremen —Heat - —Cooling —Continuous fan
,.'Balanced airflow in balanced systems
Average of measured suppl Target Flow rang
CFM 6000' to
c CFM 6000'
and exhaust flo (average +l-15/0) +f.
°=...Fail
(Snub -structural floor exhaust
E. 'Design airflow
# Measured airflow
w ,- 1 CFM 6000'
Airflow measurement metho —Flow box Flow collar
Passiveflowhood — Pitot tube traverse.
Temperature of air through F Indicated flow to Volumetric flow multiplier Q
measurementtool @ 5000', air temperature
jj"'.��,f�
Indicated flow CFM Volumetric flow CFM 5000' ❑ .Pass (.EI! Fail
r s • r 0 �
Temperature of air throug ,74 . F Indicated flow to Volumetric flow multiplier -
measurement too @ 5000', air temperature 1.Q98
House conditioned floor area 1977
Maximum Allowed Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM26I100 sf)
Absolute
Leakage
(CFM25)
Measurement
Timing
Air Handler
iI leakage
Rough -in
Excluded
4
_A°'. -
I leakage
Rough -in
Included
6
I leakage
Complete
Included
12
F
cage to outdooraC
mplete
Included
8
158.
Measured Duct Leakage
Indicated Flow
(CFM25)
Volumetric
Flow
(CFM25 5000')
Pass/Fail
❑
.0
Cl,,E
56
61
C
Mechanical Systems Perrormance Testing Submina♦fo V20120321 2 of 6
Filter type
F1Bran purolator f312 Type/stye Disposable Thicknes In 16 --- inches MERV(optional)I
pressures (OPTIONAL)
6
Mode: Heating
-Cooling
_Continuous Fan
♦ u �'
'22 t^
Fan speed tap
P=+ •
Humidifier bypass _ Open
_Closed
VII registers open
AP AC coil =
e dampers open
FF
Il
P=-
11C=
T
AP filter
..
[�lsrV ':i:i:i:
o
/ G
G} Cu
`i t �5
O
LAP Total ESP =
P=
o car
Cooling: Measured air flow throu h indoor coil using flow grid
Design cooling airflo 1 020 CFM 5000' Target airflow limits (design +/- 15/) 86'�., to 1 1 73, CFM 5000'
Measured airflow
r (j Cooling fan speed tap High - -
Temperature of air throug
measurement too 73 F
J. NSOP 19.3 - Pa TFSOP 16.9 Pa
Measured airflow, no adjustments or correction QCFM
Volumetric no 1067.256» CFM 5000' y ,.'Pass
Flow grid plate size 4. 14) _ 20 I
Indicated flow to Volumetric flow multipli r
@ 6000', air temperature 1.098
Flow Resistance Correction Facto DG- 7C
Adjusted (indicated) airflol 7
R a� „c Fail
Heating: Gas manifold pressure
OEM manifold pressur - IWC Target manifold pressure limits (spec +/- 5/ to ' t,,L IWC
specification, 6000 3.3 - 9 P 1 P '),._
Measured manifold pressur 3.26 - IWC "Pass '❑�Fail
Heating: Temperature rise
Y OEM temperature rise limi LlU to a F
Measured temperature rise
Return air ']) ::. F Supply air ) 26 F
Temp rise S0•S - - F �' :'Pass 7U` Fad Ey- _ Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing SubmidaWo V20120321 3 of 6
(This section under development, not yet being enforced)
Supply air flows (This section underdevelopment, not yet being enforced)
pressure balance
I
Pressure difference limit, room -to -core ' -3 tp:;+3 IPa
Room
Measured pressure
d
drop (Pa)
Pass
Fail
master Bedroom
+1.0 .,
Bedroom 2 Middle
-2.0--❑
Bedroom.3 End
-2.7
b9
— _
❑ _
LID,EIL
..
❑ ..�.
Mechanical Systems Performance Testing Submittsif-o V20120321 4 of 6
Outdoor temperature P \1 I , \J`,..Ay_ I �Cl/ �✓'t Worst -case depressurization testing
House setup
appliances
Applianc
Typi
Locatioi
: pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressurizationPa wrt outside
OK (less negative) ( Caution (more negative)
BPI maximum limit
seconds
Measured spillage duration
seconds
Pass = duration not exceeding limit
It pressure
BPI limit
Pa wrt CAZ
Measured
Pa wrt CAZ
Pass = pressure more negative than limit
concentration in undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass = CO level not exceeding limit
Caution = CO level 2S to 100 ppm
Draft -hood
_Draft -hood -- --
.._Draft -hood
Induced -draft
Induced -draft
Induced -draft`
F
❑
OK
❑
Caution
❑
K
on
❑ , K
❑
Caution
wl
Aa
❑
Pass
I ❑ ail
❑.
Paso
®. it
_❑ass
❑ail
� A
Pass
I ❑
ail
❑
Pass
it
.❑
ass
❑. ail.
.;100
.
'❑.
Pass 70.
ail
❑.,
Pass
,
it
-.❑,
asa
❑�ail
❑�
aution
❑"
Caution
❑
F aution
Mechanical Systems Performance Testing SuemittaiFo V20120321 5 of 6
. .
System controls operating per design intent
- Local exhaust ��;�:�
Whole-house ventilation �!, `�..
e
Sub-structurel floor exhaust � �-� � ��❑ `���
Heating �.�_ . ,. ���i
�.��. Coolin9 `� � ... _ .�Q�` '.
Approved Agency(technician erformin ins ection ad testin documented on this form
�Name(print) Paul Higman :
�T;iia Energy Rater �
�'�Company Thermal Concepts/�Allied �I. - � .
_�Signature and Date . - � � -. , � � �a
I
HVAC contractor(Fort Collins license holder
'Name(print) DWa ne Shawver
� �Title .. � .
Company . . '. " '.� �
���ISignature and Date � - HIZBIZO�3
Mechanical Systems Pertortnance Testing SubmittrtFo ' V20120121 6 of 8