Loading...
HomeMy WebLinkAbout2531 Banbury Ln - Special Inspections/Engineering - 06/27/2013Structural • Geotechnical- RMC ENGINEERS ry Job No. 138459 June 27, 2013 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Footing and Foundation Observation 2531 Banbury Ln Lot 41, Maple Hill, Replat No. 4 Fort Collins, Colorado Dear Larry: ,Js, ood In�o�o'' 9. c'986 As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation formwork and reinforcing steel for the above referenced single family residential property and found them to be in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical Code (NEC). The footings were observed on June 26, 2013 and the foundation walls were observed on June 27, 2013. Should you have questions, please feel free to contact our office. Cordially, ap REG �. 6/30/13 24995 . ss •......••. Thomas M. Cope �0l�►q� E Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077 ptructurai • ueotechrncal. .RMG ENQtNEERS Job No. 138459 July 1, 2013 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Damp Proofing 2531 Banbury Ln Lot 41, Maple Hill, Replat No. 4 Fort Collins, Colorado Dear Larry: J�oril�nno� 6 6 As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of the inspection. The damp proof was observed on July 1, 2013. Should you have questions, please feel free to contact our office. Cordially, Thomas M. Cope Professional Engineer s• ME��+s �.�8/14/13 24995 Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077 �ENG'INE-E—RS Job No. 138459 July 2, 2013 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Subsurface Drain Observation 2531 Banbury Ln Lot 41, Maple Hill, Replat No. 4 Fort Collins, Colorado Dear Larry: d�a Q ~p t` 'rhea. 1986 As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface drainage pipe and sump pit perimeter drain system on July 2, 2013. RMG found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of this observation. Should you have questions, please feel free to contact our office. Cordially, RE G 8/14/13 `gyp 24995 Thomas M. Cope S�QNAk ti Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488,2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077