HomeMy WebLinkAbout2531 Banbury Ln - Special Inspections/Engineering - 06/27/2013Structural • Geotechnical-
RMC
ENGINEERS
ry
Job No. 138459
June 27, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Footing and Foundation Observation
2531 Banbury Ln
Lot 41, Maple Hill, Replat No. 4
Fort Collins, Colorado
Dear Larry:
,Js, ood In�o�o''
9.
c'986
As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation
formwork and reinforcing steel for the above referenced single family residential property and
found them to be in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed
in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical
Code (NEC). The footings were observed on June 26, 2013 and the foundation walls were
observed on June 27, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
ap REG
�. 6/30/13
24995
. ss •......••.
Thomas M. Cope �0l�►q� E
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
ptructurai • ueotechrncal.
.RMG
ENQtNEERS
Job No. 138459
July 1, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Damp Proofing
2531 Banbury Ln
Lot 41, Maple Hill, Replat No. 4
Fort Collins, Colorado
Dear Larry:
J�oril�nno� 6
6
As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp
proofing and found it to be complete and in substantial compliance with the design drawings
prepared by High Plains Engineering & Design, LLC for this structure at the date of the
inspection. The damp proof was observed on July 1, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
s• ME��+s
�.�8/14/13
24995
Southern Office:
Central Office:
Northern Office:
Colorado Springs, CO
Englewood, CO 80112
Evans, CO 80620
719.548.0600
303.688.9475
970.330.1071
Monument: 719.488.2145
Pueblo: 719.544.7750
Woodland Park: 719.687.6077
�ENG'INE-E—RS
Job No. 138459
July 2, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Subsurface Drain Observation
2531 Banbury Ln
Lot 41, Maple Hill, Replat No. 4
Fort Collins, Colorado
Dear Larry:
d�a Q
~p
t`
'rhea. 1986
As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface
drainage pipe and sump pit perimeter drain system on July 2, 2013. RMG found it to be
complete and in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure at the date of this observation.
Should you have questions, please feel free to contact our office.
Cordially,
RE
G
8/14/13 `gyp
24995
Thomas M. Cope S�QNAk ti
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488,2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077