Loading...
HomeMy WebLinkAbout3827 Precision Dr - Disclosures/Blower Door Test - 07/27/2013 (2)0 BUILDING LEAKAGE TEST -�? 0,0 637c� Date of Test: 7/27/2013 Test File: Landmark 3827 Precisio Dr -BD Customer: Landmark Homes Technician: Paul Higmaa—� Project Number: r Building Address: 3827 Precision Unit F Fort Collins, CO 80528 Test Results 1. Airflow at 50 Pascals: 1279 CFM50 (+/- 0.6 %) (50 Pa = 0.2 w.c.) 3.86 ACH50 0.5786 CFM50/ft2 floor area 2. Leakage Areas: 106.9 in2 (+/- 3.2 %) Canadian EgLA @ 10 Pa 50.5 in2 ( +/- 5.1 %) LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient (C) = 60.3 (+/- 8.0 %) Exponent (n) = 0.781 (+/- 0.021 ) Correlation Coefficient = 0.99783 4. Test Settings: Test Standard: CGSB Test Mode: Depressurization Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 53.5 CFM 0.16 ACH 2. Estimated Design Infiltration Rate: Winter: 100.6 CFM Summer: 63.1 CFM 0.30 ACH 0.19 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 7/27/2013 Test File: Landmark 3827 Precision Di F-BD Building Information Location Climate Information Volume 19890 Surface Area Floor Area 2210 Height 20 # of Bedrooms 2 # of Occupants Year of Construction 2013 Wind Shield M Heating and Cooling Cost and Efficiency Information Heating Fuel Gas Heating Fuel Cost Heating Efficiency % Cooling Fuel Cost Cooling SEER Ventilation Weather Factor 6.87 Energy Climate Factor 17.00 Heating Degree Days 6128 Cooling Degree Days 207 Design Winter Wind Speed 7.3 mph Design Summer Wind Speed 9.4 mph Design Winter Temp DO 73 deg F Design Summer Temp Diff 15 deg F Equipment Information Type Manufacturer Model Serial Number Custom Calibration Dat Fan Energy Conservatory Model 3 (110V) 9876 Default Micromanometer Energy Conservatory DG700 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 7/27/2013 Test File: Landmark 3827 Precision Dr F-BD Depressurization Test: Environmental Data Indoor Temperature (OF) Outdoor Temperature (OF) 72.0 67.0 Data Points - Data Entered Manually Nominal Baseline Adjusted Fan Nominal Adjusted Building Pressure Building Pressure Pressure Flow Flow Fan (Pa) (Pa) (Pa) (cfm) (cfm) % Error Configuration -3.2 n/a n/a -60.2 -57.8 64.9 1454 . 1447 1.1 Rirg A ' -55.4 -52.9 55.3 1345 1'339 0.1 Ring A -51.7 -49.3 48.0 1255 1249 1.2 Ring A -44.8 -42.3 39.1 1136 1131 0.7 Ring A -41.0 -38.5 31.9 1029 1024 -1.9 Ring q -35.2 -32.8 239.5 916 912 -0.8 Ring B -30.6 -28.2 186.4 809 805 -1.4 Ring B -24.8 -22.4 144.0 712 709 3.9 Ring B , -1.7 n/a n/a Deviations from Standard CGSB - Test Parameters' None BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 7/27/2013 Test File: Landmark 3827 Precision Dr F-BD Comments House W RT Garage = detached garage