City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with PasslFail outcomes. For information on measurement tools and testing techniques, see the -Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured value to
Target or limit
compare with target o
Pass
Fail
Caution
Other data
Addre.E 3827 Precision Dr #F
Builder
HVAC contractor
Testing date(s) 07/27/?0 13
Bath exhaust
w box _ Flow collar
Airflow measurement metho passive flow hood Pilot tube traverse
Temperature of air throug Indicated flow to Volumetric flow multipli r1.098 measurement too 72 F @ 5000% air temperature
Measured Exhaust Airflow
Minimum
Operation
Airflow
Indicated
Volumetric Flow
Exhaust Pickup Location
Intermittent or
Flow
PassFail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 5000')
master Bath
Lz� rmit —Contin
50 cfm
62
68.076
❑
U.L Bath
Intermit _Contin
50 cfm
60
65.88
❑
Pwdr
termit _ Contin
50 cfm
73
80.154
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Kitchen exhaust
Oven fuel — Gas
lectric
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
Operation Intermittent Continuous
Measured airflow
Airflow measurement method — Flow box — Flow collar
Passive flow hood Pitot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool _j @ 5000'. air temperature
Indicated flow FM Volumetric flowCFM 5000'
Testing notes (fan speed, maskin
flow out of range, . .
❑ Pass ❑ =a,l
Mechanical Systems Performance Testing Submittal FornV20120321
tof6
Systems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
45
CFM 5000'
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Location +
Flow
Volumetric
Indicated Flow
(CFM 5000')
Method
Air Temperature (F)
Multiplier
Flow
(CFM)
Pass/Fail
(Cl 5000'1
_VFfow box
Total exhaust airflow
Passive flow hood
(�
= Flow collar
L.I
Pilot tube traverse
w'dr
1.098
73
80.154
_ Flow collar
Total
_ Pilot tube traverse
I�
Ell
supply airflow
_ Flow box
L1V
Passive flow hood
For systems in which supply airflow is circulatedybthe air handler fan, fan speed for measuremen Heat Cooling Continuous fan
Balanced airflow in balanced systems
Average of measured suppl
and exhaust flo CFM 5000'
❑ 7
Pass
Sub -structural floor exhaust
Design airflow
CFM 5000'
Target flow rang to CFM 5000'
(average +l- 15%)
❑ Fail
Measured airflow
Flow box Flow collar
Airflow measurement metho
Passive flow hood _Pilot tube traverse
Temperature of air through F Indicated flow to Volumetric flow multiplier
measurement tool @ 5000', air temperature
Indicated flow CFM Volumetric flow :] CFM 5000' Pass ❑ Fail
Tenperature of air throug
measurement too 78 F
House conditioned floor area 122 1 sf
Indicated flow to Volumetric flow multiplier
@ 5000', air temperature
Maximum Allowed Duct Leakage Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM25/ 100 sf)
Absolute
Leakage
(Cl
Indicated Flow
(Cl
Volumetric
Flow
(CFM25 5000')
Measurement
Timing
Air Handler
Pass/Fail
Total leakage
Rough -in
Excluded
4
Total leakage
Rough -in
Included
6
11
El
Total leakage
1complete
IIncluded
12
Leakage tooutdoorsC
mplete
Included
8
208
39
42_8
n
Mechanical Systems Performance Testing Submitteifo V20120321
Filter type
Bran Puralater
Static pressures (OPTIONAL)
Mode: Heating
tAC,00ling
_ Continuous Fan
Fan speed tap
Humidifier bypass _ Open _Closed
bL registers open
Zone dampers open
Type / styl D1S osable Thicknes 1 tt inches MERV (optional)
P=+
AP AC coil =
P=+ no
P
:t �' i�ryyrri•n�r'r'•IrirL�C�.Ct''�������e
LP filter = -
--P Total ESP =
Cooling: Measured air flow through indoor coil using flow grid
Design cooling airflo A845 1
CFM 5000' Target airflow limit (design +/- 15%) 1718 to 977 CFM 5000'
Measured airflow
Cooling fan speed tap High
Temperature of air throug
measurement too 72 F
NSOP 82 Pa TFSOP 91 Pa
Measured airflow, no adjustments or correction CFM
Volumetric f c, 803.73b JCFM 5000' Pass
Flow grid plate siz 14 20
Indicated flow to Volumetric flow multipli r
@ 5000', air temperature 1.098
Flow Resistance Correction Facto DG 700
Adjusted (indicated) airflo 732 CFM
❑ Fail
Heating: Gas manifold pressure n
OEM manifold pressu00 3.5 r
specification, 50IWC Target manifold pressure limits (spec +1- 5%) ,] to� IWC
Measured manifold pressur IWC Pass Fail
Heating: Temperature rise
OEM temperature rise limit pZs to SLF
Measured temperature rise
Return air 72 IF Supply air 1116 F
Temp rise 44 IF Pass Fail ❑
Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing SubmitteFfo V20120321 3 of 6
(This suction under development, not yet being enforced)
Supply air flows (This section underdevelopment, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core -3 to +3 Pa
Room
Measured pressure
drop (Pa)
Pass
Fail
master Bedroom
—2.7
1��
❑
#2 front
-7-2.6
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
E:1
El
11
Mechanical Systems Performance Testing Submittaifo V20120321 4 of 6
Outdoor temperature F
Worst -case depressurization testing /
House setup
Tested appliances
_ # of bath fans on These doors are closed:
_ Vented range hood on
_ Clothes dryer on
Air handler on
Other fans on
Appliance
Typt
Locatioi
CAZ pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depressurizationPa wrt outside
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wrt CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
Measured CO ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
_ Draft -hood
Induced -draft
Draft -hood
Induced -draft
Draft -hood
Induced -draft
OK Caution 11 K I Goon K Caution
60
60
60
El
Pass
I ❑ Lail
Pass
I it
11
ass
ail
100
100
100
ElPass
ail
Pass
l
ass
ail
autionEc
Caution
aution
Mechanical Systems Performance Testing SubmittakFo V20120321 5 of 6
9. System Controls
System controls operating per design intent
Svstem
ass
Local exhaust
❑
Whole -house ventilation
�r
Ffi
❑
Sub -structural floor exhaust
❑
❑
Heating
❑
Cooling
nz
I ❑
Approved Agency (t
Name (print)
Title
Company
Signature and Date
HVAC contractor (F(
Name (print)
Title
Company
Signature and Date
echnician oerformina inspection ad testing documented on this form
Paul Higman
Energy Rater
Thermal Concepts/ Allied
Mechanical Systems Performance Testing Submittatfo V20120321 6 of 6